Free City Snapshot

Melbourne

Australia

A city supplied mainly from protected forest catchments that are drying, with desalination increasingly filling the gap between falling inflows and a fast-growing population.

Intelligence edition · First edition, October 2026

Operating data · Water supply, use and wastewater 2024–25 · Population 30 June 2025 · Storage 1 September 2026 · Desalination order 2026/27

At a glance

Scale, resources and strategic position

5.44 millionPopulationGreater Melbourne (ABS Greater Capital City area) · 30 June 2025, preliminary estimate
509 billion litresWater suppliedMelbourne Water, incl. connected regional water corporations · 2024–25
1,812 billion litresStorage capacityMelbourne Water · 10 major reservoirs
69.3%Storage levelMelbourne water supply system · 1 September 2026
150 billion litresDesalinated water orderedVictorian Desalination Plant · 2026/27 supply year, the plant’s full annual capacity
366,976 million litresSewage treatedMelbourne Water, Eastern and Western Treatment Plants · 2024–25

01

City Water System

Greater Melbourne’s water services follow a two-tier, state-owned model. Melbourne Water, owned by the Victorian Government, manages the catchments, major reservoirs and treatment plants. It supplies water in bulk, treats most of the city’s sewage, and is the region’s waterway, drainage and floodplain manager. Three state-owned retailers serve customers: Yarra Valley Water in the north and east, South East Water in the south-east and on the Mornington Peninsula, and Greater Western Water in the CBD and the inner and western suburbs. All four report to the Minister for Water through DEECA. The Essential Services Commission sets prices, while the Department of Health and EPA Victoria regulate drinking water and environmental performance respectively.

02

Resources & Supply

Most of Melbourne’s water comes from protected forest catchments and is supplied unfiltered. Open catchments, which include farmland, provide about 25%. The Victorian Desalination Plant at Wonthaggi can add 150 billion litres a year. Thomson Reservoir alone holds around 60% of storage capacity.

The catchments are drying. In 2024–25, rainfall was 19.9% below the 30-year average and inflows 36% below it, while average use rose to 1.35 billion litres a day. Storages had fallen to 69.3% by 1 September 2026. The 2026 outlook placed the system in Be Proactive, the second of four drought-response zones. Residential use was 169 litres per person a day, above the 150-litre target.

36% below averageInflow to the major harvesting storagesFour major storages, against the 30-year average · 2024–25 (305 billion litres)
169 l/person/dayResidential water useGreater Melbourne, three retailers combined · 2024–25 (target 150)
12%Non-revenue water share of total useGreater Melbourne · 2024–25

03

Wastewater & Stormwater

Melbourne Water’s Western and Eastern Treatment Plants treated 366,976 million litres of sewage in 2024–25; the retailers run smaller local plants. The Western Treatment Plant at Werribee takes about half the city’s sewage, and flows there are projected almost to double by 2050. It is also over its nitrogen limit for Port Phillip Bay: a three-year average of 4,080 tonnes a year against a limit of 3,100. Melbourne Water produced 39,935 megalitres of recycled water. As floodplain manager, it works to a Flood Management Strategy to 2031 for the 13,000 km² Port Phillip and Westernport region, which commits to updating flood models for climate change.

39,935 megalitresRecycled water producedMelbourne Water treatment plants · 2024–25
4,080 tonnes/yrWestern Treatment Plant nitrogen dischargeThree-year rolling average to 30 June 2025 · limit 3,100 tonnes/yr
13,000 km²Flood management regionMelbourne Water · Port Phillip and Westernport

04

Investment & Resilience

Investment is rising sharply. In June 2026 the Essential Services Commission allowed Melbourne Water to invest $7.3 billion in infrastructure over 2026–31, 51% more than in the previous five years. The largest wastewater project is the $711 million Resource Recovery and Re-use Complex at the Western Treatment Plant. Now under construction, it will add 95 billion litres a year of primary treatment capacity. On supply, Victorian Government modelling for its 2025 Water Security Plan estimates that, within a decade, the region will need up to 95 billion litres a year more than the desalination plant at full output. Infrastructure Victoria has recommended piloting a recycled drinking water facility.

05

Key Challenges

  1. Securing supply as catchment inflows decline and population growth adds demand.
  2. Choosing and delivering new manufactured water supplies beyond full desalination output.
  3. Reducing residential use from 169 litres per person a day toward the 150-litre target.
  4. Bringing Western Treatment Plant nitrogen discharges back within their Port Phillip Bay limit.
  5. Expanding treatment capacity as sewage flows to the Western Treatment Plant approach doubling by 2050.

06

Evidence

Sources and reporting periods

Drawn from Melbourne Water’s annual and water quality reports, Annual Water Outlook and desalination advice, retailer annual reports, Essential Services Commission decisions and performance reports, Victorian Government announcements and ABS data. Some state strategy documents could not be read directly.

Evidence through September 2026 · 82 sources read

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.