A country with 61 m³ of renewable freshwater per person (2021), relying on depleting aquifers and reused wastewater as it builds a desalination carrier from Aqaba to Amman.

Browse all 1 country report

Paste the caption with your link. Social platforms control how previews appear.

At a glance

Scale, resources and strategic position

11.94 millionEstimated populationDepartment of Statistics · National · end of 2025
105%Level of water stress (SDG 6.4.2)UN-Water · National, withdrawals as a share of renewable resources after environmental flows · 2023
61 m³Renewable freshwater per person per year, all purposesMinistry of Water and Irrigation, National Water Strategy 2023–2040 · National · 2021
1,189 million m³Total water use from all sourcesMinistry of Water and Irrigation, Water Budget · National · 2024
46.3%Non-revenue waterMinistry of Water and Irrigation, Facts and Figures · National · 2023
92%Treated wastewater reused (195 of 215 million m³)Ministry of Water and Irrigation, Facts and Figures · National · 2023

01

National Water Context

Jordan's average renewable freshwater resources were about 680 million m³ in 2021, only 61 m³ per person for all purposes, and withdrawals reached 105% of renewable resources in 2023 after allowing for environmental flows. Around a quarter of its water resources are shared with neighbouring countries. The population was an estimated 11.94 million at the end of 2025, about 90% of it urban, up from 3.6 million in 1990. Syrian refugees, estimated at 1.26 million, have raised domestic demand in the northern governorates by about 40%. Amman depends on distant sources: 90% of its drinking water travels 125–325 km and is lifted up to about 1,200 m.

680 million m³/yearAverage renewable freshwater resourcesMinistry of Water and Irrigation · National · 2021
90.3%Urban share of populationDepartment of Statistics · National · end of 2025 estimate

02

Resources & Demand

Water use from all sources was 1,189 million m³ in 2024, split almost evenly between municipal and tourism use (47.8%) and irrigation (48.6%), with industry using 38 million m³. Groundwater supplied 58% of all water used in 2022 and is pumped beyond its limits: in 2023 the 12 main basins gave 699 million m³ against a safe yield of 419 million m³, and 10 of the 12 aquifers are being depleted. The 15 main dams, with 356.8 million m³ of design capacity, held 33.9% at the end of 2023. Supply is rationed: about half the population received piped water for 24 hours a week or less. The National Water Strategy projects total demand 35% higher in 2040 than in 2021.

699 vs 419 million m³Groundwater abstraction against safe yieldMinistry of Water and Irrigation · 12 main basins · 2023
50.3%Population with piped supply for 24 hours a week or lessMinistry of Water and Irrigation · National · 2023 figures, published 2024

03

Infrastructure & Governance

The Ministry of Water and Irrigation sets policy, including the National Water Strategy 2023–2040. The Water Authority of Jordan (Law No. 18 of 1988) and three public water companies supply customers: Miyahuna serves about 7.28 million people around Amman, Yarmouk Water about 3.36 million in the north and Aqaba Water 245,200 (2024). The Jordan Valley Authority (Law No. 19 of 1988) manages water in the Jordan Valley. Service differs sharply: in 2024 Aqaba Water supplied continuously, while Miyahuna's network was supplied 22.3% of the time and Yarmouk's 5.4%. In February 2026 Veolia was awarded a four-year contract to manage Yarmouk Water's services. About 67% of households are connected to sewers.

1,683,460Water subscribersMinistry of Water and Irrigation · National · 2023
22.3% / 5.4% / 100%Continuity of supply, share of time: Miyahuna / Yarmouk Water / Aqaba Waterutility performance monitoring · each service area · 2024

04

Investment & Resilience

The Aqaba–Amman Water Desalination and Conveyance Project, the National Water Carrier, is designed to produce 300 million m³ of drinking water a year, pumped 438 km from Aqaba to Amman with part of its power from solar. A build-operate-transfer project led by Meridiam with Suez, it broke ground on 18 November 2026 and is expected to be complete at the end of 2030; published costs range from USD 6.3 billion to USD 6.7 billion. Approved financing includes USD 407 million from IFC, USD 295 million from the Green Climate Fund and USD 250 million from AIIB. Climate change is projected to cut surface and groundwater availability by 15% by 2040. Under the 2023 tariff plan, average tariffs rise 4.6% a year; domestic consumers paid about 60% of the real cost of their water in 2024.

300 million m³/yearNational Water Carrier design outputAIIB project disclosure · Aqaba–Amman · construction from November 2026
USD 295 millionGreen Climate Fund financing for the carrierGCF · approved October 2025
JD 2.3 billionWater and wastewater sector debtCabinet of Jordan, as reported · National · 2023

05

Key Challenges

  1. Reducing groundwater abstraction, which exceeded safe yield by 281 million m³ in 2023.
  2. Bringing non-revenue water down from 46.3% (2023) towards the National Water Strategy's 25% target for 2040.
  3. Moving from rationed, intermittent supply to continuous service, above all in the northern governorates.
  4. Delivering the National Water Carrier, and the network works to receive its water, by the end of 2030.
  5. Narrowing the gap between tariffs and the cost of supply while sector debt stood at about JD 2.3 billion (2023).

Evidence

Sources and reporting periods

Drawn from the Ministry of Water and Irrigation's strategy, water budget and 2023 Facts and Figures, Department of Statistics estimates, UN-Water indicators, utility performance monitoring, GCF, IFC and AIIB disclosures, and Arabic and English press.

Evidence through November 2026 · 71 sources read

Report library

Country reports on Jordan

1 report available for purchase

Jordan Water Intelligence Report cover

Country Water Intelligence

Jordan Water Intelligence Report

This report evaluates how Jordan is strengthening water security through the National Conveyance Project, network-loss reduction, tariff reform, groundwater governance, wastewater reuse, and utility modernization.
Edition
2026
Price
USD 999
Explore report →