Analysis

Metropolitan Set Bid Openings for an Estimated US$60–74 Million of Construction Within Three Weeks

Metropolitan opened bids on three packages worth an estimated US$60–74 million in Oct–Nov 2026, after a US$14,475,037 Kiewit aqueduct award on October 13.

Paste the caption with your link. Social platforms control how previews appear.

Metropolitan Water District of Southern California scheduled bid openings between October 20 and November 3, 2026 for three construction packages with an estimated combined value of US$60–74 million, based on the district's own ranges. No awards had been reported by mid-November.

The three packages

The largest is Stage 1 of the Inland Feeder/SBVMWD Foothill Pump Station Intertie (Spec 2049), estimated at US$25–30 million, with bids opening October 27. Jensen Site Security Improvements (Spec 1993A) at the Jensen treatment plant is put at US$18–23 million, opening November 3. The Copper Basin Reservoir Discharge Valve Replacement (Spec 1947) on the Colorado River Aqueduct is estimated at US$17–21 million, opening October 20.

A busy October board

On October 13, 2026 the Board awarded a US$14,475,037 contract to Kiewit Infrastructure West Co. to replace the aqueduct's canal liner at 25 locations. The same meeting authorized on-call engineering agreements with HDR, Tetra Tech, Geosyntec and Arcadis, each capped at US$3 million.

The capital plan behind the work

The two-year budget adopted on April 14, 2026 increased the Capital Investment Plan by more than US$300 million, to US$1.025 billion, to address a backlog of aging treatment and delivery infrastructure. Of about 830 miles of distribution pipeline, 163 miles are prestressed concrete cylinder pipe.

Rules for bidders

Most construction bids require a California contractor license, and documents sit on the PlanetBids portal. Contracts over US$100,000 normally carry a small or disabled veteran business subcontracting requirement of at least 20%. A Project Labor Agreement covering 39 projects and programs sets a 60% local-worker goal.

Which programs come next, who already holds major work, where suppliers should focus first and what to watch through 2027 are set out in the brief. The full report, Metropolitan Water District of Southern California: Utility Account Brief, is available for USD 499. For a free overview, read the Metropolitan Water District of Southern California Utility Snapshot.

Continue reading

Related News

AnalysisMetropolitan's Treated Water Rate Falls to US$1,420 in 2027 as Fixed Charges Climb

Metropolitan's treated rate falls from US$1,528 to US$1,420 per acre-foot in 2027 as overall charges rise 6.2% and the Readiness-to-Serve Charge reaches US$239 million.

View all News →

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.