Intelligence Reports/Country Water Intelligence
United Arab Emirates Water Intelligence Report cover

Country Water Intelligence

United Arab Emirates Water Intelligence Report

An in-depth assessment of water in the United Arab Emirates: demand, resources and infrastructure, tariffs and financing, governance and climate resilience, with a strategic outlook and recommendations. The United Arab Emirates meets municipal demand by desalination and is replacing thermal plants with reverse osmosis on a published schedule, but groundwater is still pumped at about 15 times its renewable rate and only reuse, at 73% against a 95% target, has a current national figure to read against the 2036 goals. This report assesses demand, resources and infrastructure, tariffs and finance, governance and climate resilience across the four utility systems, with priority investments, recommendations and signals to monitor.

Geography
United Arab Emirates, Middle East
Report type
Country Water Intelligence
Evidence current to
26 October 2026
Format
PDF
Length
43 pages
Edition
October 2026 edition
Price
USD 999
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

2.3 billion m³ vs 0.15 billion m³: groundwater abstracted each year (official estimate, undated) against renewable internal freshwater resources (2022), about 15 times over (calculated)

73% vs 95%: treated wastewater reused (Ministry of Energy and Infrastructure, March 2025) against the 2036 national target

490 million imperial gallons a day (MIGD): new reverse osmosis capacity the Emirates Water and Electricity Company recommends across six Abu Dhabi plants, 2026–2034 (plan)

35% to 12%: desalination's share of UAE water-sector contract awards, 2022 to 2025, in a market of USD 3.4 billion of awards in 2025

02

Buyer relevance

Who the report is for

Desalination developers, EPC contractors and technology suppliers

Each reverse osmosis, sewerage tunnel, drainage and treatment project in Abu Dhabi, Dubai, Sharjah and the Northern Emirates with owner, capacity, value, stage and timeline, checked on 26 October 2026.

Lenders, bond investors and infrastructure funds

The independent producer and single-buyer models, Abu Dhabi's AED 50 billion RC2 revenue cap ending in December 2026, DEWA's results to H1 2026 and TAQA's USD 750 million blue bond.

Government, regulators and policy advisers

The five 2036 national targets set against what is measured, the unreconciled 21% and 50% demand targets, and recommendations addressed to MOEI, FCSC, the DoE, the RSB and the utilities.

Utility strategy teams and consultancies

Side-by-side utility evidence on losses, metering, tariffs, reuse and storage for DEWA, EWEC, TAQA Water Solutions, SEWA and EtihadWE, with conflicting official figures shown together.

03

Decision scope

Questions answered

01

How dependent is the UAE on desalination and groundwater?

Installed desalination capacity was 7.80 million m³ a day in 2023, while groundwater still supplies around 46% of national supply and 93% of farm irrigation, at about 15 times the renewable resource.

02

Where is capital going now?

Desalination fell from 35% of UAE water contract awards in 2022 to 12% in 2025, while Dubai's sewerage tunnel PPP (AED 80 billion including lifecycle costs) and Tasreef drainage (AED 30 billion) moved ahead.

03

How far are the national targets from delivery?

Reuse is 73% against a 95% target for 2036; the demand, storage, productivity and scarcity targets have no published baselines, which the report sets out target by target.

04

What does Dubai's utility earn and invest?

DEWA reported revenue of AED 32.84 billion and capital expenditure of AED 11.72 billion in 2025, with water network losses of 4.5%.

04

Inside the report

Inside the complete report

Executive Snapshot

1. Introduction and National Water Context

2. Water Demand and Consumption

3. Water Resources and Infrastructure Systems

4. Water Tariffs, Utility Performance and Financing

5. Governance, Regulation and Digital Transformation

6. Climate Resilience and Sustainability

7. Strategic Outlook and Recommendations

Source Register

05

Public preview

What to watch next

3.10 Major Projects and Investments

Formal award of the Dubai sewerage tunnel packages J and W and procurement of the third package; Hassyan completion; EWEC confirmations for Mirfa 2, Shuweihat 4 and Saadiyat; Al Hamriyah's Phase 1 date.

4.2 Cost Recovery

DoE's successor control (DoE has said it is preparing an RC3 review); any published subsidy figure; RO cost pass-through in Abu Dhabi's bulk supply tariff.

4.4 Utility Financial Performance

DEWA's Q3 2026 and full-year 2026 results; any water segment disclosure; published accounts for EtihadWE or SEWA.

4.8 Public and Private Financing

Financial close on the tunnel packages; further TAQA or DEWA labelled issuance; how the successor price control treats network financing costs.

Sample page · page 17 of 43

Major Projects and Investments: each reverse osmosis, sewerage tunnel, drainage and wastewater project with owner, capacity, value, stage and timeline.

Report page 17: the major projects table listing Mirfa 2, Shuweihat 4, Saadiyat, the EWEC six-plant programme, Al Hamriyah, Naqa'a, Fujairah I, the Dubai sewerage tunnels, Tasreef, the Ras Al Khaimah sewage PPP and TAQA's SCADA project with owner, capacity, value and stage.

06

Included

What you receive

The complete PDF report: 43 pages, 9 sections, 57 tables and a register of 75 sources.

This edition

October 2026 edition. Installed desalination capacity by entity for 2023 and national reuse at 73% (March 2025). DEWA results for FY 2024, FY 2025 and H1 2026, including the first 60 MIGD block at Hassyan. Abu Dhabi's Integrated Water Sector Strategy of November 2025 and its 40% loss-reduction target for 2035. The 2026 sewerage tunnel bidder selections, TAQA's July 2026 blue bond and the UN Water Conference in Abu Dhabi on 8–10 December 2026. New edition, October 2026, with evidence current to 26 October 2026. Replaces the earlier edition for new buyers; buyers of an earlier edition keep access to the edition they bought.

07

Evidence & method

Evidence and method

Built on the UAE Government portal and Ministry of Energy and Infrastructure statements, FCSC tables, UN SDG 6 and World Bank data, Abu Dhabi Department of Energy, EAD and SCAD publications, DEWA, EWEC, TAQA, SEWA and EtihadWE disclosures, Dubai laws and RSB reporting, the UAE's UNFCCC national communications, and project and trade reporting checked on 26 October 2026.

Sources

75 sources, listed in the report's source register. Evidence current to 26 October 2026. Principal data periods: federal water statistics for 2023 (installed desalination capacity) and undated national estimates on the official government portal (updated October 2026); UN SDG 6 indicators for 2023 and 2024; Abu Dhabi sector reports for 2019 and 2021; Dubai Electricity and Water Authority results for FY 2024, FY 2025 and H1 2026; project, procurement and financing status checked on 26 October 2026. Currency is UAE dirhams (AED), with US dollars (USD) where the source states them..

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Lead Analyst, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility transformation, infrastructure, governance, finance and climate resilience for executive and policy audiences.

  • Evidence-led water intelligence
  • Decision-focused system analysis
  • Report-specific treatment of scope and terminology

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

United Arab Emirates Water Intelligence Report

Format
PDF
Length
43 pages
Edition
October 2026 edition
Price
USD 999
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Country Water Intelligence
Report type
Country Water Intelligence
Edition
October 2026 edition
Format
PDF
Length
43 pages
Reference
COUNTRY_WATER_INTELLIGENCE-UNITED-ARAB-EMIRATES_735d957a1c56
Evidence current to
26 October 2026

14

Explore this report family

More Country Water Intelligence reports

Explore the same report family covering other countries.

Kuwait Water Intelligence Report cover

Country Water Intelligence

Kuwait Water Intelligence Report

An assessment of whether Kuwait's desalination-and-power system, its pricing and its institutions can keep pace with demand and climate stress to 2035. Kuwait's water stress reached 3,850.50%, the highest value in FAO's 2025 dataset, and about 180 MIGD of new desalination is under contract for 2029 against a 2035 target of nearly 1 billion imperial gallons a day. Households pay a legacy 800 fils per 1,000 imperial gallons against a press-reported cost of about KD 5 to make 1,000 gallons, and the tariff review described in February 2026 has produced no decision.
Geography
Kuwait, Middle East
Edition
November 2026, New edition
Length
34 pages
Explore report
Morocco Water Intelligence Report cover

Country Water Intelligence

Morocco Water Intelligence Report

Morocco is meeting a structural water deficit by building supply, with desalination at 410 million m³ a year.
Geography
Morocco, Africa
Edition
October 2026, New edition
Length
30 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.