Intelligence Reports/Utility Account Brief
Philadelphia Water Department: Utility Account Brief cover

Utility Account Brief

Philadelphia Water Department: Utility Account Brief

An assessment of where Philadelphia Water Department will spend on its capital program, how it buys, who already holds its major contracts and which projects suppliers should pursue first. PWD's proposed capital program for FY 2026 to FY 2031 totals US$4,731.85 million, against about US$6.4 billion reported by Moody's, with replacement and rehabilitation at 80%. The City's Fall 2026 forecast already names PWD plant contracts for 2027, including the Lardner's Point pumping station and a sixth sedimentation tank, each estimated at more than US$10m.

Geography
Philadelphia, Pennsylvania, United States
Evidence current to
14 November 2026
Format
PDF
Length
11 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

US$4,731.85 million vs about US$6.4 billion: the proposed FY 2026–FY 2031 capital program in PWD testimony, and the current six-year program as reported by Moody's (November 2025)

About US$809.1 million and US$797.35 million: proposed capital budgets for FY 2026 and FY 2027

US$1.147 billion: low-interest state and federal loans approved for PWD between 2021 and December 2025

US$500 million: new-money revenue bond sale on the City's calendar for November 2026, not yet priced on November 14, 2026

02

Buyer relevance

Who the report is for

Water main and sewer renewal contractors

Size the market from the US$1,008 million water main relay and US$990 million collector system budgets and PWD's annual mileage targets.

Wastewater process equipment suppliers

Time bids for the Northeast aeration upgrade, financed by a US$149.1m PENNVEST loan, and the 2027 Lardner's Point and sedimentation tank contracts.

Engineering and consulting firms

See which advisory roles are held, including Arcadis as general consultant at US$7,200,000, and where the FY 2027 Water Revitalization Plan update may open design work.

Treatment technology vendors

Track PFAS pilots at plants where Queen Lane PFOA averaged 6.8 ppt against a 4 ppt federal limit with compliance due by April 2029 (2031 under a May 2026 EPA proposal).

03

Decision scope

Questions answered

01

How large is PWD's capital program?

PWD proposed US$4,731.85 million for FY 2026 to FY 2031; Moody's put the current six-year program at about US$6.4 billion in November 2025.

02

How do I bid for PWD work?

Public works, supplies and equipment are bid on PHLContracts, with formal bids above US$25,000; professional services go through eContract Philly.

03

Which PWD contracts are coming to market?

The Fall 2026 forecast lists Lardner's Point pumping station (Spring 2027) and a sixth primary sedimentation tank (Winter 2027), each over US$10m, and washwater tower work at US$5–10m (Summer 2027).

04

Who holds PWD's largest service contracts?

Synagro's biosolids contract was US$29,710,000 in FY 2026, through the Philadelphia Municipal Authority, which also carries the US$7,500,000 AMI service contract.

05

Can PWD fund the program?

PWD reports US$1.147 billion of approved low-interest loans since 2021, and a US$500 million bond sale is on the City's calendar for November 2026.

04

Inside the report

Inside the complete report

1. The Account at a Glance

2. Organisation and Decision-Making

3. Financial Position

4. Priorities and Pressures

5. How Philadelphia Water Department Buys

6. Opportunity Register

7. Commercial Priorities: Where to Focus First

8. Watch List: What to Monitor and What to Do

Source Register

05

Public preview

What to watch next

November 2026 bond sale (US$500 million)

Funds the next stage of capital work; its official statement should give PWD's current capital program figure.

Next general rate proceeding

The current rate period ends August 31, 2027; rate approvals set the pace of borrowing and spending.

City Procurement Forecast

Lists PWD bids 12–18 months ahead.

Northeast aeration award

Financed by the largest single award in PENNVEST's January 2026 round.

Sample page · page 7 of 11

Opportunity Register: PWD projects by status, stage, existing contractors and route to market.

Landscape report page with the Opportunity Register table listing Philadelphia Water Department projects, their procurement status, next milestones and how to access them.

06

Included

What you receive

The complete PDF report: 11 pages, 9 sections, 6 tables and a register of 21 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

The brief draws on PWD's capital program testimony and FY 2027 budget testimony, Rate Board determinations, City bond disclosures and calendar, the City's Fall 2026 Procurement Forecast, PWD procurement and program pages, and state funding and rating agency releases, with status checked on November 14, 2026.

Sources

21 sources, listed in the report's source register. Evidence current to 14 November 2026. Principal data periods: Proposed FY 2026–FY 2031 capital program; FY 2025 performance measures and FY 2026 contracts; rates in force from September 1, 2026. Project and procurement status checked against public sources on November 14, 2026. All currency is US dollars (US$)..

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Philadelphia Water Department: Utility Account Brief

Format
PDF
Length
11 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Utility Account Brief
Edition
November 2026, First edition
Format
PDF
Length
11 pages
Reference
OFW_EXT_PHILADELPHIA_WATER_DEPARTMENT_UTILITY_ACCOUNT_BRIEF_fc1e15d480e9
Evidence current to
14 November 2026

14

Explore this report family

More Utility Account Briefs

Explore the same report family covering other utilities.

Vitens: Utility Account Brief cover

Vitens: Utility Account Brief

A supplier's guide to Vitens: how it is organised and makes decisions, its financial position and priorities, how it buys, and the opportunities to target first. Vitens's net investment reached €341.5 million in 2025, up 93% since 2021, and its 2026 tenders include a €7.2 million pump framework and cleaning for about 350 technical sites. Its own 2025 annual report warns of insufficient investment room and plans to phase the investment programme, while objection procedures slow the new source capacity it needs.
Geography
Netherlands
Edition
November 2026, First edition
Length
12 pages
Explore report
San Francisco Public Utilities Commission: Utility Account Brief cover

San Francisco Public Utilities Commission: Utility Account Brief

A supplier's guide to the San Francisco Public Utilities Commission: how it is organised and makes decisions, its financial position and priorities, how it buys, and the opportunities to target first. SFPUC is buying against a US$12,559.0 million capital plan in which Wastewater takes US$5,916.1 million and Hetch Hetchy Power capital rises 81.6%. Its largest construction package out for bid in October 2026, the Folsom Harrison/Treat box sewers, is estimated at US$200 million to US$240 million after an earlier round drew a single bid.
Geography
San Francisco, California, United States; regional wholesale supply in Alameda, Santa Clara and San Mateo counties
Edition
November 2026, First edition
Length
11 pages
Explore report
HOFOR: Utility Account Brief cover

HOFOR: Utility Account Brief

HOFOR invested DKK 3,411 million across its businesses in FY2025 and expects that level to continue, but much of its near-term work is already with consortia: three are negotiating the DKK 1.9 billion Svanemøllen tunnel contract. The open entry points for suppliers are the remaining waterworks (Islev out to tender, Gørløse in design), the Thorsbro PFAS add-on, the Spangen basins and a heat-pump programme targeting 300 MW by 2035.
Geography
Greater Copenhagen, Denmark
Edition
November 2026, First edition
Length
11 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.