Water Utility IntelligenceEast Bay Municipal Utility District (EBMUD)

Free Utility Snapshot

East Bay Municipal Utility District (EBMUD)

East Bay, California, United States

Water and wastewater district for California’s East Bay, renewing a 4,167-mile distribution network while managing rising rates, water losses and a carbon-neutrality goal.

At a glance

Scale, service and financial position

1,400 thousandPopulation served by the Water System (Wastewater System: 740 thousand)FY2025
57,441 millions of gallonsTotal water productionFY2025 · actual
387,992Water System accountsFY2025 year end · actual
4,167 milesWater distribution pipeFY2025 year end · actual
Approximately $2.86 billionCapital improvement program cash expendituresFY2026–FY2030 · projection
$979 millionTotal operating revenueFY2026 · actual (audited)

01

About the Utility

East Bay Municipal Utility District provides drinking water and wastewater treatment in California’s East Bay through two separately reported systems: a Water System serving a population of 1,400 thousand and a smaller Wastewater System serving 740 thousand. Each system issues its own fixed-rate revenue bonds; at the end of FY2025 both carried AAA ratings from S&P and AA+ from Fitch, with Moody’s rating the water bonds Aaa and the wastewater bonds Aa1. The District’s Board adopted average water rate increases of 6.50% for each of FY2026 and FY2027, and its adopted budget carries wastewater increases of 8.5% a year. The District also generates renewable energy from hydropower and wastewater biogas.

02

Water System

EBMUD treats raw water drawn from multiple sources and stores untreated water in reservoirs. Orinda, the largest of its treatment plants, has a peak capacity of 190 MGD, and the District met every state and federal drinking water regulation in FY2025. Renewing the distribution network is the central operating task: EBMUD replaced 25.4 miles of pipe in FY2025, meeting its 25-mile target. Losses remain material. Of the 56,124 million gallons supplied in 2024, 4,828 million gallons were water loss, including 3,659 million gallons of real losses.

756,695 acre feetTotal untreated water reservoir capacityFY2025
26.3 GPSCDReal water loss per service connection per day (State Water Board 2028 standard: 44)Calendar 2024 · actual vs 2028 standard
145.8 MGDAverage daily billed consumptionFY2025 · actual

Total water production

EBMUD Water System total water production, millions of gallons, FY2016–FY2025 (fiscal years ending 30 June)

millions of gallons
Total water production: FY2016, 53,390 millions of gallons, actual; FY2017, 57,311 millions of gallons, actual; FY2018, 60,540 millions of gallons, actual; FY2019, 59,677 millions of gallons, actual; FY2020, 61,249 millions of gallons, actual; FY2021, 61,550 millions of gallons, actual; FY2022, 57,006 millions of gallons, actual; FY2023, 53,597 millions of gallons, actual; FY2024, 55,186 millions of gallons, actual; FY2025, 57,441 millions of gallons, actual020,00040,00060,00080,00053,390FY201657,311FY201760,540FY201859,677FY201961,249FY202061,550FY202157,006FY202253,597FY202355,186FY202457,441FY2025
Actual

Reported actuals, each from that year’s Annual Comprehensive Financial Report.

Sources: EBMUD Annual Comprehensive Financial Reports FY2016–FY2025, Statistical Section, Consumption and Account Comparative Highlights.

03

Wastewater System

The Wastewater System is centred on the Main Wastewater Treatment Plant, which provides secondary treatment for permitted dry-weather flow of up to 120 MGD and up to 168 MGD during wet-weather storms, with further primary-treatment capacity for peaks. The plant itself has had no effluent limit permit violations since August 1999. Storms are the pressure point. Fines of approximately $848,000 over the last five years related mainly to wet-weather events, including an October 2021 discharge at the Point Isabel Wet Weather Facility, and two effluent limit violations occurred at the wet-weather facilities in January 2026.

320 MGDPeak primary treatment capacity, Main Wastewater Treatment PlantCurrent permit/design basis
EightSelf-reported sanitary sewer overflows, all above 10,000 gallons (six from the 31 December 2022 storm)2021–2025

04

Investment & Priorities

The Water System’s capital programme is projected to require cash expenditures of approximately $2.86 billion over FY2026–FY2030, with distribution pipes accounting for 27% of that forecast. These are planned outlays, not spending to date. Debt is also rising: long-term debt reached $3.7 billion at the end of FY2026, up 8% in a year. Revenue bond debt service coverage nonetheless stayed above the District’s policy target for the Water System, the Wastewater System and the District as a whole.

$758,106 thousandPipelines – Distribution System, forecast CIP cash expenditure (27%)FY2026–FY2030 · projection
$819.5 millionCapital appropriation (District-wide appropriations: $1,701.5 million)FY2026 · adopted budget
$3.3 billionWater System long-term debt outstanding (Wastewater System: $398 million)30 June 2026 · actual
2.48Revenue bond debt service coverage (policy target: at least 1.6 times)30 June 2026 · actual vs policy

05

Sustainability & Resilience

EBMUD’s current goal is for both the water and wastewater systems to be carbon neutral by 2030, with process emissions exempted. Its emissions indicator recorded 15,583 MT CO2e for FY2025. The District generates renewable power from hydropower at its Sierra Nevada foothills facilities and from biogas produced in wastewater treatment, and the wastewater system reported energy recovery of 111% in FY2025. Its wastewater climate plan finds that a sea level rise of 12 inches would have no effect on the main treatment plant.

Below 6,153 MT CO2eCarbon-neutrality KPI ‘Exceeded’ thresholdFY2028 · target
4.7 to 24 inchesProjected Bay Area sea level rise range2050 · projection (June 2020 plan)

06

Key Challenges

  1. Renewing the distribution network at the 25-mile annual pace its target sets.
  2. Keeping real water losses within the State Water Board standard that applies from 2028.
  3. Preventing wet-weather discharges and permit violations at the wastewater facilities.
  4. Delivering a capital programme of approximately $2.86 billion while holding debt service coverage above policy.
  5. Reaching carbon neutrality by 2030 across both systems.

Evidence

Sources and reporting periods

This Snapshot draws on EBMUD’s annual financial reports for FY2016–FY2025 and audited FY2026 statements, bond official statements and disclosures, budget and rate reports, its 2025 Urban Water Management Plan, performance indicator reports and climate and water quality reports.

Evidence through: 2026-10-1622 source documents

Report library

Reports on East Bay Municipal Utility District (EBMUD)

0 reports available for purchase

No reports are currently available for purchase.

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.