01
About the Utility
Hunter Water Corporation provides drinking water, wastewater and stormwater services across the Hunter region of New South Wales, supplying an estimated 648,138 people in 2024-25. It works under an operating licence that sets minimum service standards, each expressed as a share of properties that must be left unaffected by failures such as low water pressure, and it reports its performance against them every year. Prices are set by the economic regulator IPART, whose final determination on the current price path, released in June 2025, rated Hunter Water’s proposal ‘Advanced’. That proposal put the typical household bill rising by 5.7% a year.
02
Water System
Supply depends on rainfall. Hunter Water’s major water sources have a capacity of 269,198 ML, and it produced 64,646 ML of drinking water for its network in 2024-25. When storages fell towards the level that triggers restrictions, it began supplementing them with groundwater from the Tomago Sandbeds in April 2026, before rain lifted storages again by September. Demand is easing: residential customers used 166 litres per person per day in the same year, down from 174, and network leakage came in below the corporation’s target. Drinking water met microbiological standards for the whole population served in every year of the past decade.
Non-revenue water
Hunter Water, volume of non-revenue drinking and non-drinking water excluding recycled water, ML, financial years ending 30 June, 2015-16 to 2024-25
Volumes as published in the Bureau of Meteorology National Performance Report dataset.
Sources: Bureau of Meteorology, National Performance Report 2024-25: urban water utilities (Hunter Water Corporation, indicator W10.1).03
Wastewater System
Hunter Water also collects, treats and recycles the region’s wastewater through 5,581 km of sewer mains and 463 pumping stations. It collected 88,006 ML of wastewater in 2024-25, treating most of it to a secondary level and a smaller volume to a tertiary standard, while part of the treated flow is supplied as recycled water. Pressure on the system rose in the same year: the volume of wastewater lost or spilled from the network increased sharply, and the network recorded 1,835 sewer main breaks, leaks and chokes. Wastewater is also the larger of the two services by operating cost.
04
Investment & Priorities
Water security dominates the investment programme. The $530 million Belmont desalination plant has been under construction since a design and construct contract was signed in October 2024; its marine works were completed in August 2026 and work continues on the treatment plant. The Lostock Dam to Glennies Creek Dam Pipeline, with a Paterson River connection, was paused by the NSW Government when projected costs reached $1.5 billion. Hunter Water’s 2024 pricing proposal planned spending of around $2.5 billion over five years.
05
Sustainability & Resilience
Hunter Water is cutting emissions and adding its own generation. Its operational emissions, measured on a location basis, were 13% below their 2020-21 level in the latest reported year, and the first phase of its onsite renewable energy programme, delivering 6.4 MW, is complete, with a larger capacity target for the end of the decade. Resilience rests chiefly on supply: desalination is intended to give the region a source that does not depend on rainfall, and a proposed replacement of part of the trunk main from Chichester Dam would strengthen long-term water security, with construction expected later this decade.
06
Key Challenges
- Delivering the Belmont desalination plant into reliable service.
- Protecting supply while storages still depend on rainfall.
- Reducing wastewater spills and sewer main failures.
- Funding a larger capital programme as net debt rises against equity.
07
Major Projects
Belmont Desalination Plant
A $530 million plant adding a drinking water source independent of rainfall; marine works were completed in August 2026.
- Status / period
- Construction (marine works complete August 2026; treatment plant under way)
- Investment / capacity
- $530 million (expected design and construction cost)
Lostock Dam to Glennies Creek Dam Pipeline
Proposed transfer from Lostock Dam to Glennies Creek Dam with a Paterson River connection, paused by the NSW Government over costs.
- Status / period
- Paused (NSW Government)
- Investment / capacity
- Projected costs reached $1.5 billion
Onsite renewable energy programme
Generation at Hunter Water sites: Phase 1 delivered 6.4 MW, with at least 13 MW targeted by 2030.
- Status / period
- Phase 1 complete; ≥13 MW targeted by 2030
- Investment / capacity
- 6.4 MW (Phase 1)