Johannesburg Water

City of Johannesburg, Gauteng, South Africa

Johannesburg’s water and sanitation company, buying from Rand Water while nearly half is lost or unbilled and treatment works fall short.

Paste the caption with your link. Social platforms control how previews appear.

At a glance

Scale, service and financial position

1 725 Ml/dayAverage potable water supplied, bought from Rand WaterFY2024/25 · actual
44.79%Non-revenue waterYear to 30 June 2025 · actual
49%Green Drop average overall score (target 90%)2023/24 audit, conducted March 2025 · regulatory audit
R1.312 billionCapital expenditureFY2024/25 · actual
74.84%Collection rateFY2024/25 · actual
99.4%Drinking water quality compliance (SANS 241)FY2024/25 · actual

01

About the Utility

Johannesburg Water (SOC) Ltd is a state-owned company whose shareholder is the City of Johannesburg. It provides drinking water and sanitation across the city through six operating regions, ten network depots and six wastewater treatment works, and an earlier business plan put its base at about 590,000 domestic, commercial and industrial customers serving an estimated 4.9 million people. Tariffs are approved by the City each year; the current schedule raised domestic water charges by 12.5% while keeping the first six kilolitres a month free. Its cash was long swept daily into the City’s accounts, but under National Treasury’s metro reform that sweeping ended in June 2026.

02

Water System

Johannesburg Water buys its potable water from Rand Water and distributes it through a network of mains, reservoirs and towers. Rand Water’s abstraction from the Integrated Vaal River System is capped by licence, and the City must cut demand while extra water from Lesotho Highlands Phase II is awaited, now expected around 2028. Losses are the central weakness: non-revenue water reached 48.7% in the six months to December 2025, up from 44.79% for the year to June 2025, and fewer than half of bursts were repaired within two days, although drinking-water compliance remains high. Outages from October 2026 led to level two restrictions in November.

48.7%Non-revenue water (mid-year target 45.50%)1 July–31 December 2025 · actual vs target
43.71%Water bursts restored within 48 hours (target 90%)1 July–31 December 2025 · actual vs target
12 526 kmWater distribution mains30 June 2025 · as published

Non-revenue water

Johannesburg Water, non-revenue water, % of system input, financial years ending 30 June, 2016/17 to 2024/25

%
Non-revenue water: 2016/17, 40.3 %, actual; 2017/18, 38.4 %, actual; 2018/19, 38.6 %, actual; 2019/20, 34.5 %, actual; 2020/21, 39.4 %, actual; 2021/22, 44.8 %, actual; 2022/23, 46.1 %, actual; 2023/24, 46.2 %, actual; 2024/25, 44.8 %, actual303540455040.32016/1738.42017/1838.62018/1934.52019/2039.42020/2144.82021/2246.12022/2346.22023/2444.82024/25
Actual

Values as first reported in each year's integrated annual report. The first half of 2025/26 (48.7%, mid-year report) is a part-year figure and is not plotted.

Sources: Johannesburg Water integrated annual reports 2016/17 to 2024/25.

03

Wastewater System

Sewage is collected through the city’s sewer network and pump stations and treated at six works, two of which also generate energy from biogas. Treatment performance has fallen sharply: the latest Green Drop audit scored the works 49% on average, down from 73% at the previous audit, and final effluent compliance was 74% at the 2025/26 mid-year. The national water department has opened criminal proceedings over pollution from the Goudkoppies and Olifantsvlei works. Northern Works is being upgraded, but the first module of a new Lanseria plant is not due until 2033.

1 043 Ml/daySewage treatment capacity, six worksDecember 2025 · as published
74%Final effluent compliance (target 90%)1 July–31 December 2025 · actual vs target

04

Investment & Priorities

Capital spending has risen, but only 18% of the 2025/26 budget had been spent by mid-year. The business plan budgets R13.06 billion over five years against a renewal backlog the annual report put at R25.2 billion; the Mayor has since cited R32.5 billion. Late payments delayed the Hursthill reservoir upgrade, now resumed and due in April 2027, while the new Brixton reservoir and tower opened in April; the City is seeking about R13 billion for pipe replacement while a proposed IFC loan is on hold.

R13.06 billionFive-year capital budget2026/27–2030/31 · budget
R25.2 billionInfrastructure renewal backlog (assets with under ten years’ remaining life)2024/25 annual report · as reported
18%Capital budget spent by mid-year (quarterly target 35%; budget R1.704 billion)1 July–31 December 2025 · actual vs target

05

Sustainability & Resilience

Resilience here is mainly a question of supply. Daily use fell to 244.69 litres per person in the year to June 2025, still far above the national norm of 175, and consumption has to come down to stay within the City’s share of the Vaal system. A business plan lists a solar programme with battery storage at company sites. The outages that began in October showed how little headroom the network holds; the level two restrictions aim to cut use by about 200 million litres a day.

244.69 l/c/dWater consumption per person per day (national norm 175)FY2024/25 · actual
1 684 Ml/dayAverage annual daily demand2026/27 · projection

06

Key Challenges

  1. Restoring reliable supply after the October outages and level two restrictions.
  2. Reducing non-revenue water and repairing bursts far faster.
  3. Bringing treatment works back into compliance as pollution cases mount.
  4. Funding network renewal against a multibillion-rand backlog.
  5. Keeping demand within Vaal system limits until Lesotho water arrives.

07

Major Projects

Reservoir and water tower programme

New storage and repair of leaking reservoirs; Brixton’s new reservoir and tower opened in April 2026.

Status / period
Construction (Brixton operating; Hursthill 2 resumed, due April 2027)
Investment / capacity
49 Ml planned in 2025/26

Bulk wastewater treatment programme

Treatment-works upgrades, including Northern Works, with the bulk wastewater budget rising to R1.7 billion by 2030/31.

Status / period
Budgeted 2026/27–2030/31; Northern Works upgrade under construction
Investment / capacity
R1.7 billion in 2030/31 (budget)

Water and sewer pipe replacement

Replacing 346 km of water and 214 km of sewer mains over five years; about R13 billion is being sought.

Status / period
Planned (financing being sought)
Investment / capacity
346 km water and 214 km sewer (five-year plan)

Evidence

Sources and reporting periods

This Snapshot draws on Johannesburg Water’s integrated annual reports for 2016/17 to 2024/25, business plans to 2026/27, the 2025/26 mid-year report, City tariff schedules and monthly drinking-water quality reports to September 2026.

Evidence through: 2026-10-1715 source documents

Report library

Reports on Johannesburg Water

0 reports available for purchase

No reports are currently available for purchase.

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.