Water Utility IntelligenceMassachusetts Water Resources Authority

Free Utility Snapshot

Massachusetts Water Resources Authority

Greater Boston, Massachusetts, United States

Greater Boston’s wholesale water and sewer authority, building water system redundancy, renewing ageing assets and tackling lead and sewer overflows within a capped capital programme.

At a glance

Scale, service and financial position

Approximately 3 millionPeople served by the water and sewer systemsFY2025
Approximately 490 billion gallonsTotal reservoir storage capacityAs published, April 2026
203 mgdAverage withdrawals, last five years (safe yield approx. 300 mgd)Five years to April 2026 · actual
$873,292 thousandTotal operating revenuesFY2025 · actual
$3.8 billionTotal debt30 June 2025 · actual
$380.8 millionProjected capital spendingFY2026 · plan

01

About the Utility

The Massachusetts Water Resources Authority is greater Boston’s wholesale water and wastewater provider, established under an enabling act of 1984. It supplies treated water to member communities and operates the regional wastewater transport and treatment system, while the communities maintain local water pipelines and own local sewers. In FY2025 the two systems served approximately 3 million people and more than 5,500 businesses, and water communities had grown to 53. Revenues are budgeted to come overwhelmingly from assessments on these communities, with the Boston Water and Sewer Commission alone expected to provide about 30.1% of combined charges in FY2026.

02

Water System

Supply comes from the Quabbin and Wachusett reservoirs west of Boston, which under present operating rules provide a safe yield of approximately 300 mgd against five-year average withdrawals of 203 mgd. Water is treated at the Carroll Water Treatment Plant and carried by aqueducts and tunnels to the community systems; MWRA reports meeting every state and federal drinking water standard in 2025, though lead sampling placed Boston, Malden and Medford above the Action Level. Storage is the indicator to watch: Quabbin held 82.1% of capacity at the end of FY2026, and the Greenfield Recorder reported 77.6% in late September 2026, Below Normal under MWRA’s drought plan.

405 mgd / 270 mgdCarroll Water Treatment Plant design capacity (maximum daily / average daily)As published, April 2026
5.96 ppbLead, 90th percentile (Action Level 15 ppb; 18 of 594 homes above)September 2025 sampling
82.1%Quabbin Reservoir volume (93.0% a year earlier)30 June 2026 · status

03

Wastewater System

Wastewater from 43 communities flows through MWRA’s interceptors and pumping stations to the Deer Island Treatment Plant, which has a strong compliance record: it received NACWA’s Platinum Peak Performance Award for an 18th continuous year in 2024, and the FY2026 budget reported no permit violations for over 18 years. The fourth-quarter FY2026 performance report nevertheless records one violation there that year, alongside five at the Clinton Treatment Plant. Combined sewer overflows remain the legacy issue: by the end of 2024 typical-year discharges had fallen to 401 MG system-wide, but control-plan goals were not met at eight outfalls.

361 mgd / 1,270 mgdDeer Island primary treatment design capacity (average daily / peak hourly)As published, April 2026
401 MGCSO discharges in a typical year (goals not met at eight outfalls)End of 2024 · status

04

Investment & Priorities

Capital planning runs through five-year programmes under Board-approved spending caps, partly financed by green bonds that Fitch and S&P rated AA+ in 2026. The FY26 Capital Improvement Program splits planned FY2026 spending almost equally between wastewater and waterworks and projects $2.0 billion over FY2024–FY2028 against a cap of approximately $1.4 billion, led by asset protection and water system redundancy. Actual capital expenditure since inception passed $9.7 billion by December 2025, and financing costs absorb more than half of budgeted FY2026 expenses.

$2.0 billionProjected capital spending (cap approx. $1.4 billion)FY2024–FY2028 · plan
$355.7 millionWater System Redundancy spending (17.9% of total)FY2024–FY2028 · plan
More than $9.7 billionCapital expenditure since inceptionThrough 31 December 2025 · actual

Combined water and sewer rate revenue

MWRA combined water and sewer rate revenue, $ million, FY2016–FY2025 (fiscal years ending 30 June)

$ million
Combined water and sewer rate revenue: FY2016, 672.4 $ million, actual; FY2017, 694.9 $ million, actual; FY2018, 717 $ million, actual; FY2019, 739 $ million, actual; FY2020, 760.9 $ million, actual; FY2021, 769.4 $ million, actual; FY2022, 792.1 $ million, actual; FY2023, 814.6 $ million, actual; FY2024, 834.3 $ million, actual; FY2025, 855.5 $ million, actual05001,000672.4FY2016694.9FY2017717FY2018739FY2019760.9FY2020769.4FY2021792.1FY2022814.6FY2023834.3FY2024855.5FY2025
Actual

Reported actuals from one ten-year table in the FY2025 Annual Comprehensive Financial Report statistical section.

Sources: MWRA Annual Comprehensive Financial Report for the Fiscal Years Ended June 30, 2025 and 2024, Historical Rate Revenue and Percentage Increases.

05

Sustainability & Resilience

MWRA’s latest greenhouse gas inventory reports emissions 41% below 2006 levels, meeting the Commonwealth’s target of a 33% reduction by 2025. Deer Island generates some of its own electricity but purchases most of it, and renewable output fell short of budget in the final quarters of FY2025 and FY2026. MWRA states that it already meets the federal PFAS standards before they take effect, and it funds community lead service line replacement through interest-free loans and grants.

41%GHG emissions below 2006 levels2006–2023 inventory · actual
34,814,562 kWhDeer Island self-generated electricity (144,889,154 kWh required)FY2025 · actual
$72.4 millionProvided to communities for lead service line replacementSince 2016 (as reported for 2025)

06

Key Challenges

  1. Protecting supply security as Quabbin storage falls, keeping withdrawals within safe yield.
  2. Delivering water system redundancy while projected spending exceeds the capital cap.
  3. Reducing lead exposure where community sampling exceeds the Action Level.
  4. Maintaining Deer Island’s compliance record and closing remaining sewer overflow gaps.
  5. Managing capital financing costs that absorb over half of budgeted expenses.

Evidence

Sources and reporting periods

This Snapshot draws on MWRA’s audited financial statements and ten-year statistical tables, bond official statements and rating reports, budgets and capital programmes, quarterly Board performance reports, water quality reports, greenhouse gas inventories and its enabling act.

Evidence through: 2026-10-1714 source documents

Report library

Reports on Massachusetts Water Resources Authority

0 reports available for purchase

No reports are currently available for purchase.

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.