01
About the Utility
Northern Ireland Water Limited is the government-owned company that provides water and sewerage services across Northern Ireland, serving some 850,000 households and businesses. The Department for Infrastructure is both its shareholder and its lender: its net debt consists largely of departmental loans. The Utility Regulator sets its revenue and outputs through price controls, and the PC21 determination requires revenue of £2.7bn over the period. That control has since been extended by one year, so the next one, PC28, begins in April 2028. The company runs about 27,000 km of water mains and a sewer network last reported at 16,000km.
02
Water System
NI Water’s supply record is one of steady, regulated improvement. Leakage has come down substantially since 2009/10, when it stood at 187 Ml/d, although it has run above the regulator’s annual targets in most years. Mains bursts have eased since the December 2022 freeze-thaw, and long unplanned supply interruptions have become rare. Drinking water quality is consistently high, with overall regulatory compliance of 99.91% in the latest calendar year and no service reservoir breaching the coliform sampling threshold. Billing is similarly dependable, with nearly every metered customer now billed on an actual meter reading.
Total leakage
Northern Ireland Water, total leakage, million litres per day, financial years ending 31 March, 2016-17 to 2023-24
Each value is the latest reporting-year column of that year's Annual Information Return. The 2024/25 annual report figure of 152.32 Ml/d is not plotted.
Sources: Northern Ireland Water Annual Information Returns 2016-17 to 2023-24 (public domain versions).03
Wastewater System
Wastewater is where NI Water’s constraints are sharpest. The company operates the sewer network and treatment works for the whole region, and the PC21 determination included £529m for the Living with Water Programme in Belfast. Upgrades began at 16 wastewater treatment works after April 2021, but in January 2026 the company told Belfast councillors that funding reductions had paused most planned Living With Water upgrades. Pollution performance met its target in 2021-22. Limited sewage capacity now holds back new connections in many towns, which makes wastewater funding the utility’s defining issue.
04
Investment & Priorities
Capital spending has climbed steeply during PC21, reaching £341.5m in 2023/24. The regulator raised the capital allowance at its mid-term review, yet it remains well below the £4.4bn the company’s business plan proposed. Delivery is mixed: NI Water met 35 of 45 key output measures in the regulator’s latest two-year assessment, and operating costs ran above allowance. Its business plan for PC28, the next control, was due in November 2026.
05
Sustainability & Resilience
Energy links NI Water’s climate and cost pressures. The regulator allowed average tariff increases of 4.5% in the last two PC21 years to offset an unprecedented rise in power costs. More than half of its power use has recently come from renewable sources, and its total reported emissions fell in 2024/25. Scope 3 emissions make up most of the footprint, so the capital programme shapes the climate account as much as operations do.
06
Key Challenges
- Delivering wastewater capacity so constrained towns can take new connections.
- Securing a stable multi-year funding settlement in PC28.
- Maintaining high drinking water quality across some 27,000 km of mains.
- Reducing leakage below regulatory targets.
- Containing power costs while cutting emissions.
07
Major Projects
Living with Water Programme (Belfast)
A long-term programme to tackle flooding, wastewater capacity and environmental performance in Belfast.
- Status / period
- In delivery; most planned upgrades paused for funding (NI Water, January 2026)
- Investment / capacity
- £529m nominal allowance in PC21
Wastewater treatment works upgrades
Upgrades of wastewater treatment works under NI Water's PC21 investment programme.
- Status / period
- Initiated at 16 works since April 2021
- Investment / capacity
- 16 works
PC21 major projects and programmes
Projects and programmes above the £10m threshold tracked in the PC21 monitoring plan.
- Status / period
- PC21 plan, extended to 2027/28
- Investment / capacity
- 20 projects and programmes