Water Utility IntelligencePortland Water Bureau

Free Utility Snapshot

Portland Water Bureau

Portland and surrounding areas, Oregon, United States

Portland’s municipal water bureau, building Bull Run filtration to meet a 2029 compliance deadline while tackling water loss, wildfire exposure and rising debt.

At a glance

Scale, service and financial position

About 840,000People served (Bureau system description; other sources give 912,000 and close to one million)As published (undated)
2,253 milesWater mainsFY2025 (year ended 30 June 2025)
$295,900 thousandFirst lien pledged gross revenues (debt service coverage 7.07)FY2024-25 · actual
13.70%Water loss, share of water suppliedFY2023-24 · actual
$2.56 billionBull Run filtration facility and pipelines, cost estimateAs of February 2026 · estimate
$1,975,750 thousandFive-year capital improvement plan (inflated dollars)FY2024-25 to FY2028-29 · plan

01

About the Utility

The Portland Water Bureau is the City of Portland’s drinking water utility: its finances form the City’s Water Fund, the City is the borrower on its federal WIFIA loans, and City Council sets water rates by ordinance. The Bureau describes a system serving about 840,000 people in Portland and surrounding areas; EPA’s loan record cites 912,000, and the Bureau’s financial plan says close to one million people rely on the Bull Run. Most of its regional wholesale agreements were due to end in June 2026, and Willamette Week reported on 2 September 2026 that its largest wholesale customers are leaving, with Tualatin Valley Water District on a short-term contract until its own supply is ready.

02

Water System

The Bull Run watershed in Mount Hood National Forest is the primary source, and its water is not yet treated for Cryptosporidium. The Columbia South Shore Well Field, able to produce close to 100 million gallons a day, backs it up in hot, dry summers and during winter turbidity, but cannot meet the needs of Portland and its wholesale customers alone. It was called on in May 2026, when a supply conduit leak was repaired in under 36 hours with no reported water quality impacts. Total per capita demand fell from 109 to 92 gallons a day between FY2008-09 and FY2017-18.

Close to 100 million gallons per dayColumbia South Shore Well Field production capability (about half Bull Run’s daily capacity)As published (undated)
About 93 million gallons a dayWater delivered to customersFiscal year reported in the March 2024 financial plan
204 million gallonsLocal water storageFY2025 (year ended 30 June 2025)

03

Infrastructure & Performance

Water loss is the main efficiency gap. Losses equalled 13.70% of water supplied in FY2023-24 and have swung widely from year to year, against a State of Oregon requirement of 10 percent; the Bureau has submitted a Water Loss Action Plan and is introducing advanced metering jointly with the City’s Bureau of Environmental Services. Service quality is stronger. Improved corrosion control helped keep the lead 90th percentile at higher-risk homes at 4.4 ppb in 2024, below the federal action level, and Portland has no known lead service lines.

7.10Main leaks and breaks per 100 miles (target 9.00)FY2021-22 · actual
4.4 ppbLead, 90th percentile at higher-risk homes (action level 15 ppb)2024 monitoring

Water loss

Portland Water Bureau water loss as a percentage of water supplied, FY2019-20 to FY2023-24 (fiscal years ending 30 June)

% of water supplied
Water loss: FY2019-20, 15.3 % of water supplied, actual; FY2020-21, 17.1 % of water supplied, actual; FY2021-22, 9.9 % of water supplied, actual; FY2022-23, 15.1 % of water supplied, actual; FY2023-24, 13.7 % of water supplied, actual0510152015.3FY2019-2017.1FY2020-219.9FY2021-2215.1FY2022-2313.7FY2023-24
Actual

Reported actuals from the Bureau's water loss figure (Figure 1) in its satellite leak detection case study.

Sources: Portland Water Bureau, water loss and carbon emissions case study (Figure 1).

04

Investment & Priorities

Investment is dominated by Bull Run Filtration, a plant designed to filter 135 million gallons a day plus new pipelines, which must deliver filtered water by 30 September 2029 under a compliance agreement with the Oregon Health Authority. Estimated at $2.56 billion as of February 2026 and financed partly by two federal WIFIA loans, it was 43.00 percent complete at the end of September 2026, according to the Bureau’s project status page. Debt is projected to grow with it, and annual rate increases continue.

September 30, 2029Deadline to deliver filtered water (Bilateral Compliance Agreement)Agreement revised 2023 and 2026
$726.6 million and $319 millionFederal WIFIA loans (1.89 percent and 4.49 percent interest)As published (February 2026 page)
8.1 percentAverage effective retail water rate increaseFY2026-27 · adopted 27 May 2026

05

Sustainability & Resilience

Wildfire is the clearest climate exposure for an unfiltered mountain supply. The lightning-caused Camp Creek Fire burned inside the Bull Run watershed in 2023, and filtration is designed partly to remove wildfire sediment and ash and keep Bull Run water in service during turbidity events. The Bureau has committed to net zero emissions by 2050, and to halving them by 2030 compared with 2007, through solar and micro-hydro generation, lower electricity use and a cleaner fleet.

Approximately 2,055 acresCamp Creek Fire extent (about 1.3 miles from Reservoir 1)As of 4 October 2023
About 8 percentShare of the Bureau’s carbon emissions attributed to water lossAs published (FY2025-2029 climate action page)
Net zero by 2050Greenhouse gas target (interim: halve by 2030 compared with 2007)Target

06

Key Challenges

  1. Delivering filtered Bull Run water by 30 September 2029 within a $2.56 billion estimate.
  2. Protecting the unfiltered Bull Run supply from wildfire, turbidity and conduit failure.
  3. Reducing water loss towards the State of Oregon’s 10 percent requirement.
  4. Managing debt projected at approximately $2.44 billion as wholesale customers leave.

Evidence

Sources and reporting periods

This Snapshot draws on the Portland Water Bureau’s project, supply, water quality and climate disclosures, the City of Portland’s audited financial reports and Water Bureau budgets, its statutory conservation plan, a Council rate ordinance and EPA’s WIFIA loan record.

Evidence through: 2026-10-1518 source documents

Report library

Reports on Portland Water Bureau

1 report available for purchase

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.