Portsmouth Water

Portsmouth Water supply area, England, United Kingdom

Water-only company in England building the Havant Thicket reservoir to supply Southern Water, while working to bring leakage and demand back within regulatory targets.

Paste the caption with your link. Social platforms control how previews appear.

At a glance

Scale, service and financial position

743.897 thousandResident population servedFY2025-26 · actual
180.29 Ml/dDistribution inputFY2025-26 · actual
£60.1 millionRevenue (up 21%)FY2025-26 (year ended 31 March 2026) · actual
£211 millionDirect Havant Thicket reservoir spend to dateTo 31 March 2026 · actual
34 Ml/dLeakage (target 30.8 Ml/d; new methodology)FY2025-26 · actual
£471 millionTotal expenditure allowance set by Ofwat2025–2030 price control · allowance

01

About the Utility

Portsmouth Water Limited is a water-only company in England, supplying drinking water to a resident population of 743.897 thousand. Its parent, the South Downs Capital Group, is owned by funds managed by Ancala Partners, which have also provided additional funding. Ofwat regulates its prices and has set a total expenditure allowance of £471 million for 2025-30, £214 million more than in the previous five years, while the Drinking Water Inspectorate oversees water quality. What sets the company apart is the Havant Thicket reservoir, which it is building and will operate in order to supply water in bulk to its neighbour, Southern Water.

02

Water System

In 2025-26 the company put an average of 180.29 Ml/d into supply, backed by service reservoir storage, from treatment works that include Gaters Mill, Lovedean, Itchen and Farlington. Demand is the main operating constraint: consumption per person was reported at 154.1 litres a day, above its target, and missing it brought a financial penalty. Water quality is a second pressure, with a Drinking Water Inspectorate notice requiring action on nitrate risks at Lovedean. Once complete, Havant Thicket is designed to let the company supply Southern Water with up to 21 Ml/d from its Gaters Mill works.

470.6 MlTotal service reservoir capacityFY2025-26 · actual
154.1 l/h/dConsumption per person (target 148.5 l/h/d)FY2025-26 · actual vs target
Up to 21 Ml/dPlanned bulk supply to Southern Water from Gaters MillOnce Havant Thicket operates · plan

03

Infrastructure & Performance

Leakage is the clearest weakness. Ofwat named Portsmouth among four companies whose three-year average leakage was above their 2019-20 starting level, and on a new methodology leakage reached 34 Ml/d in the latest year against a target of 30.8 Ml/d. Customer and quality measures are stronger: complaints fell, and the drinking water compliance risk score stayed low, at 0.45 for 2025. Supply interruptions rose, however, and the inspectorate reports that the share of service reservoirs overdue for inspection, though falling, remains the second highest in the industry.

27.7Complaints per 10,000 customers (29.7 a year earlier)FY2025-26 · actual
8.82%Service reservoirs overdue for inspection (down from 16%)2025 · regulator finding

Annual leakage

Portsmouth Water, annual average leakage, megalitres a day, years ending 31 March, FY2020-21 to FY2023-24

Ml/d
Annual leakage: FY2020-21, 23.6 Ml/d, actual; FY2021-22, 26.9 Ml/d, actual; FY2022-23, 32.2 Ml/d, actual; FY2023-24, 28.2 Ml/d, actual01020304023.6FY2020-2126.9FY2021-2232.2FY2022-2328.2FY2023-24
Actual

Annual levels as published in the company's annual reports. Three-year averages used for regulatory targets differ (27.6 Ml/d for 2022/23; 29.1 Ml/d for 2023-24). 2025-26 (34 Ml/d) uses a new methodology and is not shown.

Sources: Portsmouth Water Limited, Annual Report and Accounts, FY2021-22 to FY2023-24.

04

Investment & Priorities

Havant Thicket dominates the capital programme. The reservoir, of approximately 8,700 Ml, will be the first new major reservoir in the UK in over 40 years once operating; spending on it reached £81.4 million in the latest year, taking direct project spend to £211 million. Ofwat’s August 2026 cost change draft determinations hold only a conditional allowance for further reservoir costs, after a redesign for unforeseen ground conditions, pending a second cost adjustment decision. Smart metering moved quickly, with 15,095 meters installed in the first year.

£377 millionFive-year business plan, the company’s largest to date2025–2030 · plan
10.4 kmMains renewed (regulatory target 7.8 km)FY2025-26 · actual
£53 millionSmart meter rollout for all customers2025–2030 price control · allowance

05

Sustainability & Resilience

Financial resilience is tied closely to the reservoir. Ofwat reported Portsmouth’s regulatory gearing as the sector’s highest, at 78.4% in March 2023, after borrowing to fund Havant Thicket; past equity injections and a separate price control for the reservoir then supported a fall to 38.1% by March 2025. The regulator nonetheless keeps the company under elevated and enhanced monitoring, and Moody’s rating remains Baa2 Stable. The company buys renewable electricity and aims for net zero operational emissions, but in-year emissions rose in the latest year and missed their reduction target.

38.1%Regulatory gearing (78.4% in March 2023)31 March 2025 · regulator assessment
Baa2 StableMoody’s credit ratingReview published March 2026
7,383.39 tCO2eIn-year emissions (up 1%; reduction target missed)FY2025-26 · actual

06

Key Challenges

  1. Delivering the Havant Thicket reservoir as its costs and funding allowance are reassessed.
  2. Bringing leakage back within its regulatory targets.
  3. Reducing consumption per person towards its targets.
  4. Protecting water quality at Lovedean and across its catchments.
  5. Maintaining financial resilience while the reservoir is under construction.

Evidence

Sources and reporting periods

This Snapshot draws on Portsmouth Water’s annual reports from FY2017-18 to FY2025-26, including its latest annual performance report, and on Ofwat price control, performance and financial resilience publications and Drinking Water Inspectorate notices and reports.

Evidence through: 2026-10-2014 source documents

Report library

Reports on Portsmouth Water

0 reports available for purchase

No reports are currently available for purchase.

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.