State-owned South Australian water and sewerage corporation delivering a record regulated capital programme while securing drought-exposed supply through desalination, recycling and renewable energy.

Drinking water, sewerage and recycled water · State-owned statutory corporation · 2026 edition · Latest evidence FY 2024-25 (year to 30 June 2025); regulatory period 2024-28 (ESCOSA determination RD24); national performance data 2016-17 to 2024-25

At a glance

Scale, service and financial position

756,505Homes and businesses supplied with water2024-25
277 billion litresWater delivered2024-25
27,653 kmWater mainsAs at June 2025
$1.769 billionTotal revenue2024-25
$799.9 millionTotal capital investment (actual, record level)2024-25
$3.3 billionNet capital expenditure approved by ESCOSA2024-28 regulatory period

01

About the Utility

SA Water is a statutory corporation owned by the Government of South Australia, operating under its own Act and the Public Corporations Act. Its board is appointed by the Government and chaired by Allan Holmes, with David Ryan as Chief Executive. The Essential Services Commission of South Australia (ESCOSA) is its independent economic regulator: it issues water retail licences, sets consumer protection standards and determines allowable revenue for four-year regulatory periods. The corporation provides drinking water, sewerage and recycled water services, and in 2024-25 delivered 277 billion litres of water to 756,505 homes and businesses. It operates the longest water mains supply network of any Australian water utility.

02

Water System

South Australia depends heavily on the River Murray, alongside reservoirs, groundwater and desalination. The Adelaide Desalination Plant at Lonsdale, with capacity of 100 gigalitres a year, is Adelaide's only climate-independent source and can meet about half of the metropolitan region's annual requirements. In 2024-25, the lowest inflows into the Mount Lofty Ranges reservoirs left combined reservoir levels at 40% in January 2025, the lowest in more than 25 years. Water quality held, with every Safe Drinking Water Act requirement met, but dry soil movement drove a rise in water main leaks and breaks.

100 GL per yearAdelaide Desalination Plant capacityAs published (commissioned 2011)
99.99%Health-parameter compliance, Australian Drinking Water Guidelines2024-25

Water main breaks

Reported actuals, 2016-17 to 2023-24, national performance indicator IA8

number of breaks
Water main breaks: 2016-17, 3,653 number of breaks, actual; 2017-18, 3,723 number of breaks, actual; 2018-19, 4,107 number of breaks, actual; 2019-20, 3,719 number of breaks, actual; 2020-21, 3,634 number of breaks, actual; 2021-22, 3,627 number of breaks, actual; 2022-23, 3,486 number of breaks, actual; 2023-24, 3,922 number of breaks, actual02,0004,0006,0003,6532016-173,7232017-184,1072018-193,7192019-203,6342020-213,6272021-223,4862022-233,9222023-24
Actual

The chart retains the eight observations before the 2024-25 indicator-definition clarification. The 2024-25 observation is excluded because the publisher warns that excluding bursts in recycled water mains might affect historical comparability. SA Water’s annual report counts leaks and breaks on a different basis and its totals differ.

Sources: Bureau of Meteorology and Water Services Association of Australia, Urban National Performance Report datasets, 2016-17 to 2023-24; 2024-25 indicator metadata.

03

Wastewater System

SA Water's sewerage system serves 563,803 connections through 9,372 km of sewerage mains and 43 wastewater treatment plants, as at June 2025. The corporation describes itself as Australia's second largest recycler of water, reusing one in every three litres of treated wastewater; the Virginia Pipeline Scheme carries recycled water from Bolivar to irrigators on the northern Adelaide plains. In the first year of the 2024-28 regulatory period, environmental overflow events stayed within target, while odour complaints and customers with repeat internal overflows exceeded theirs.

04

Investment & Priorities

For the regulatory period that began in July 2024, ESCOSA approved $3.3 billion of net capital expenditure, SA Water's most ambitious programme to date, and actual capital investment reached a record $799.9 million in 2024-25. Housing growth is central: $1.5 billion of the programme is dedicated to the State Government's Housing Roadmap, and a ministerial direction places directed investment outside ESCOSA's normal price determination. On the Eyre Peninsula, early works have begun on a desalination plant at Billy Lights Point targeted to operate by mid-2026.

$3.3 billionNet capital expenditure approved by ESCOSA2024-28 regulatory period
$5,330 million ($Dec22)Implied overall revenue cap (water and sewerage retail)2024-28 regulatory period
$681.6 millionCapital delivery, regulatory reporting basisYear 1 of 2024-28 (to 30 June 2025)

05

Sustainability & Resilience

SA Water is one of South Australia's largest single electricity users, and its Zero Cost Energy Future project, an investment of more than $300 million, combines solar generation, energy storage and demand scheduling. It targets net zero emissions, and base-load operations on fully renewable energy, by 2030. It is also preparing 50-year water security strategies for regions across the state, and the Resilient Water Futures strategy for Greater Adelaide finds that shortfalls are possible under worst-case scenarios even with full use of the desalination plant.

154 MWSolar photovoltaic capacity, Zero Cost Energy Future (30+ sites)As published (undated)
≈70%Share of electricity needs covered by own generation, average conditionsAs published (undated)
2030Net zero emissions target yearTarget

06

Key Challenges

  1. Securing Adelaide's supply as drought and a drying Murray-Darling Basin cut reservoir inflows.
  2. Delivering a record capital programme under ESCOSA scrutiny of its planning, delivery and funding.
  3. Reducing unplanned water supply interruptions, still above target, as main breaks rise.
  4. Enabling housing growth with new water and wastewater infrastructure across Adelaide's growth areas.
  5. Upgrading the Baroota, Warren, Sturt and Mount Bold dams, which need safety works.

07

Major Projects

Eyre Peninsula Desalination Plant

A climate-independent seawater supply at Billy Lights Point, easing pressure on Uley South Basin groundwater sources.

Status / period
Early construction works commenced; operation targeted mid-2026
Investment / capacity
5.3 GL/year (16 ML/day); $272.3M in the 2024-28 programme

Mount Bold Dam Safety Upgrade

The largest dam project in SA Water's history; the spillway was lowered in September 2024.

Status / period
Under way
Investment / capacity
$76.7M total

Tea Tree Gully Sustainable Sewers

Converting Tea Tree Gully properties to new sewer mains, with 28.5 km of sewer mains constructed so far.

Status / period
Under way; 1,244 properties converted to date
Investment / capacity
$326.9M in the 2024-28 programme

Evidence

Sources and reporting periods

This Snapshot draws on SA Water's annual and regulatory reports, ESCOSA determinations and performance reporting, audited financial statements, Bureau of Meteorology national performance data, and South Australian Government environment and water-security publications.

Evidence through: 2026-09-2430 source documents

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.