01
About the Utility
South East Water is a water-only company supplying 2.3 million customers, most of them households, across five counties of south-east England, including Kent and Sussex. Ofwat sets its prices under a control running from April 2025 to March 2030, and the Drinking Water Inspectorate enforces its drinking water quality duties. Its immediate parent is HWUK, and its shareholders have twice injected new equity to reduce gearing. The company is now under sustained regulatory pressure. Repeated supply failures led Ofwat to accept formal undertakings in July 2026, including a shareholder-funded redress package, and a Moody’s downgrade to sub-investment grade in May 2026 put it in breach of a licence condition requiring two investment-grade ratings.
02
Water System
On a normal day the company treats and pumps around 543 million litres of drinking water, and demand can climb sharply in extreme weather. Supply draws on six reservoirs and 88 water treatment works linked by an extensive pipe network. Its water resources plan starts from a surplus across every planning scenario but moves into a company-level deficit by 2040 in both dry-year and summer-peak conditions. Demand is the main operating constraint: in 2024-25 customer demand fell by only 1% against a reduction target of 7.2%, and consumption per person remains well above the long-term target the company is required to reach.
03
Infrastructure & Performance
Supply resilience is the company’s defining weakness. Ofwat found that it has repeatedly fallen short of its supply interruption commitments, and in 2024-25 interruptions averaged more than 44 minutes per property against a five-minute target, while leakage of 104.8 Ml/d far exceeded its 81.0 Ml/d target. The Drinking Water Inspectorate judged the Tunbridge Wells loss of supply and boil water notice in late 2025 foreseeable and preventable, and placed the company in a transformation programme. Mains repairs, by contrast, beat their target in the same year.
Annual leakage
South East Water, total reported leakage, annual average, million litres a day (Ml/d), years ending 31 March, 2020-21 to 2025-26
Values as published. Annual targets were 81.0 Ml/d in 2024-25; earlier targets are in the source documents.
Sources: South East Water, WRMP24 technical overview (2020-21 to 2023-24); Annual Performance Report 2025 (2024-25); Annual Report 2025/26 (2025-26).04
Investment & Priorities
Investment is rising under the current price control, though the totals are still proposals: company documents put the five years to 2030 at between £1.8 billion and £2.1 billion. Ofwat allowed £228 million for resilience programmes, and planned works include 388 km of water mains replacement; the first year delivered 16.6 km of mains renewals. Enforcement now sets part of the agenda: a Drinking Water Inspectorate order requires a new contact tank at Pembury water treatment works by September 2028.
05
Sustainability & Resilience
Financial resilience has become as pressing as operational resilience. Moody’s and S&P both moved the company below investment grade in mid-2026, even though shareholder equity had helped bring net debt down to about 66.5% of regulated capital value by March. Available liquidity then stood at £93.8 million in cash and undrawn facilities. Since then, further heatwave outages have pushed the company into a half-year pre-tax loss, and shareholders provided another £50 million in October, according to a November report by KentOnline.
06
Key Challenges
- Restoring reliable supply after repeated interruptions and outages.
- Delivering the treatment works upgrades required by enforcement orders.
- Regaining two investment-grade credit ratings.
- Reducing leakage and demand ahead of a forecast supply deficit.
07
Major Projects
Pembury water treatment works upgrades
Works required by a Drinking Water Inspectorate enforcement order after the Tunbridge Wells loss of supply.
- Status / period
- Enforcement order SEW-2026-00004; contact tank and settlement tank due by 30 September 2028
- Investment / capacity
- Completion report due by 31 May 2031
2025–2030 network and capacity programme
Mains replacement, new interconnector mains and added treatment capacity and treated water storage.
- Status / period
- Planned; 16.6 km of mains renewals delivered in year 1
- Investment / capacity
- Planned: 388 km of mains to be replaced; 77 km of new interconnectors; 52 million litres of added treatment capacity
Smart meter roll-out
Installation of new smart meters to help identify leaks.
- Status / period
- Planned, 2025–2030
- Investment / capacity
- 275,000 meters; £23 million