Free Utility Snapshot

South East Water

Five counties of south-east England, including Kent and Sussex, United Kingdom

Water-only company supplying 2.3 million customers in south-east England, now under regulatory enforcement and below investment grade after repeated supply failures.

Paste the caption with your link. Social platforms control how previews appear.

At a glance

Scale, service and financial position

2.3 millionCustomers supplied, mostly householdsAs stated by Ofwat, March 2026
543 million litresDrinking water treated and pumped on a normal dayApril 2026 · as published
£351.8 millionTurnoverFY2025-26 (year ended 31 March 2026) · actual
44 min 6 sAverage supply interruption per property (target 5 minutes)FY2024-25 · actual
101.1 Ml/dLeakage, annual averageFY2025-26 · actual
£30.5mShareholder-funded redress under Ofwat undertakingsAccepted July 2026 · commitment

01

About the Utility

South East Water is a water-only company supplying 2.3 million customers, most of them households, across five counties of south-east England, including Kent and Sussex. Ofwat sets its prices under a control running from April 2025 to March 2030, and the Drinking Water Inspectorate enforces its drinking water quality duties. Its immediate parent is HWUK, and its shareholders have twice injected new equity to reduce gearing. The company is now under sustained regulatory pressure. Repeated supply failures led Ofwat to accept formal undertakings in July 2026, including a shareholder-funded redress package, and a Moody’s downgrade to sub-investment grade in May 2026 put it in breach of a licence condition requiring two investment-grade ratings.

02

Water System

On a normal day the company treats and pumps around 543 million litres of drinking water, and demand can climb sharply in extreme weather. Supply draws on six reservoirs and 88 water treatment works linked by an extensive pipe network. Its water resources plan starts from a surplus across every planning scenario but moves into a company-level deficit by 2040 in both dry-year and summer-peak conditions. Demand is the main operating constraint: in 2024-25 customer demand fell by only 1% against a reduction target of 7.2%, and consumption per person remains well above the long-term target the company is required to reach.

6 reservoirsReservoirs supplying the networkApril 2026 · as published
88Water treatment worksApril 2026 · as published
142.0 l/p/dPer capita consumption (long-term target 110 l/p/d by 2050)FY2025-26 · actual

03

Infrastructure & Performance

Supply resilience is the company’s defining weakness. Ofwat found that it has repeatedly fallen short of its supply interruption commitments, and in 2024-25 interruptions averaged more than 44 minutes per property against a five-minute target, while leakage of 104.8 Ml/d far exceeded its 81.0 Ml/d target. The Drinking Water Inspectorate judged the Tunbridge Wells loss of supply and boil water notice in late 2025 foreseeable and preventable, and placed the company in a transformation programme. Mains repairs, by contrast, beat their target in the same year.

Up to 60,170Consumers affected by the Tunbridge Wells loss of supply and boil water noticeNovember–December 2025
138.2Mains repairs per 1,000 km of main (target 164.3)FY2024-25 · actual

Annual leakage

South East Water, total reported leakage, annual average, million litres a day (Ml/d), years ending 31 March, 2020-21 to 2025-26

Ml/d
Annual leakage: 2020-21, 92.7 Ml/d, actual; 2021-22, 88.7 Ml/d, actual; 2022-23, 102 Ml/d, actual; 2023-24, 101.4 Ml/d, actual; 2024-25, 104.8 Ml/d, actual; 2025-26, 101.1 Ml/d, actual05010015092.72020-2188.72021-221022022-23101.42023-24104.82024-25101.12025-26
Actual

Values as published. Annual targets were 81.0 Ml/d in 2024-25; earlier targets are in the source documents.

Sources: South East Water, WRMP24 technical overview (2020-21 to 2023-24); Annual Performance Report 2025 (2024-25); Annual Report 2025/26 (2025-26).

04

Investment & Priorities

Investment is rising under the current price control, though the totals are still proposals: company documents put the five years to 2030 at between £1.8 billion and £2.1 billion. Ofwat allowed £228 million for resilience programmes, and planned works include 388 km of water mains replacement; the first year delivered 16.6 km of mains renewals. Enforcement now sets part of the agenda: a Drinking Water Inspectorate order requires a new contact tank at Pembury water treatment works by September 2028.

£228 millionResilience enhancement allowed by Ofwat (of £295 million assessed)2025–2030 price control · allowance
388 kmWater mains to be replaced2025–2030 · plan
16.6 kmMains renewals deliveredFY2025-26 (year 1) · actual

05

Sustainability & Resilience

Financial resilience has become as pressing as operational resilience. Moody’s and S&P both moved the company below investment grade in mid-2026, even though shareholder equity had helped bring net debt down to about 66.5% of regulated capital value by March. Available liquidity then stood at £93.8 million in cash and undrawn facilities. Since then, further heatwave outages have pushed the company into a half-year pre-tax loss, and shareholders provided another £50 million in October, according to a November report by KentOnline.

Ba1Moody’s rating (downgraded from Baa3)From 28 May 2026
BB+S&P senior secured rating (downgraded from BBB-)From 24 July 2026
c.66.5%Senior net debt as a share of regulated capital value31 March 2026 · actual

06

Key Challenges

  1. Restoring reliable supply after repeated interruptions and outages.
  2. Delivering the treatment works upgrades required by enforcement orders.
  3. Regaining two investment-grade credit ratings.
  4. Reducing leakage and demand ahead of a forecast supply deficit.

07

Major Projects

Pembury water treatment works upgrades

Works required by a Drinking Water Inspectorate enforcement order after the Tunbridge Wells loss of supply.

Status / period
Enforcement order SEW-2026-00004; contact tank and settlement tank due by 30 September 2028
Investment / capacity
Completion report due by 31 May 2031

2025–2030 network and capacity programme

Mains replacement, new interconnector mains and added treatment capacity and treated water storage.

Status / period
Planned; 16.6 km of mains renewals delivered in year 1
Investment / capacity
Planned: 388 km of mains to be replaced; 77 km of new interconnectors; 52 million litres of added treatment capacity

Smart meter roll-out

Installation of new smart meters to help identify leaks.

Status / period
Planned, 2025–2030
Investment / capacity
275,000 meters; £23 million

Evidence

Sources and reporting periods

This Snapshot draws on South East Water’s annual reports, annual performance reports, business and water resources plans and its 2026 bond prospectus, and on Ofwat price determinations and enforcement notices and Drinking Water Inspectorate findings and orders.

Evidence through: 2026-10-1915 source documents

Report library

Reports on South East Water

0 reports available for purchase

No reports are currently available for purchase.

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.