Urban Utilities, formerly Queensland Urban Utilities and formally the Central SEQ Distributor-Retailer Authority, is a statutory body established in 2010 to distribute and retail drinking water, recycled water and sewerage services in South East Queensland. Its service area of 14,384 square kilometres spans Brisbane, Ipswich, Lockyer Valley, Scenic Rim and Somerset, and returns to its participating councils totalled $232.2 million in FY26. It buys bulk drinking water from Seqwater and passes that cost through to its around 1.6 million customers. The Queensland Competition Authority monitors rather than sets its prices, and its current investigation runs to June 2030.
02
Water System
Urban Utilities delivered more than 146,400 megalitres of drinking water in FY26 through a network serving a fast-growing region. Billed demand rose from 105.9 gigalitres in FY15 to 137.7 gigalitres in FY25, yet leakage has fallen, with the infrastructure leakage index falling to 0.8 in 2024/25. Every one of its twelve supply schemes met drinking-water chemical health limits in FY26, but reliability slipped: only 88% of unplanned interruptions were restored within the standard, ending six consecutive years of meeting every customer service standard, and interruption frequency rose close to its limit.
03
Wastewater System
Wastewater is the larger part of the business. In FY26 Urban Utilities managed 10,160 kilometres of sewers and collected and treated 136,195 megalitres at its 26 treatment plants, which it calls resource recovery centres. Capacity is the pressure point: it says 11 of those plants are already, or will become, capacity constrained within its ten-year planning horizon. Dry weather overflows returned within target in FY26 after missing it the year before, and nitrogen from its plants stayed below the 600-tonne target. Heavy wet weather, including ex-tropical cyclone Alfred in March 2025, has tested the network and lifted complaints.
04
Investment & Priorities
Capital expenditure, including assets donated by developers, reached $469 million in FY26. Urban Utilities plans to invest $6.7 billion over the next decade, and its proposal to the competition authority forecasts about $2.275 billion of capital spending across FY28 to FY30, including $291 million of infrastructure critical to the Brisbane 2032 Games. These are forecasts, not approved allowances, and the authority’s draft report is due by 24 December 2026.
Capital expenditure
Urban Utilities, capital expenditure including developer donated assets, $ million, FY17 to FY26
Financial years ending 30 June. Includes assets donated by developers, as reported in each annual report's financial summary; nominal dollars, not adjusted for inflation.
Sources: Urban Utilities annual reports 2016/17 to FY26.05
Sustainability & Resilience
Urban Utilities targets a 35% cut in its scope one and two emissions from FY23 levels, a goal its reports date variously to FY28 and FY29. Biogas cogeneration produced more energy in FY26 than the year before, and the flare upgrade at Luggage Point is complete while Oxley Creek remains in planning. Growth is the long-term test: the population of its five council areas is projected to grow by nearly a third over two decades, and planning forecasts see water-serviced dwellings rising to about 953,000 by 2045-46.
06
Key Challenges
- Expanding wastewater treatment capacity ahead of rapid population growth.
- Delivering a larger capital programme, including Brisbane 2032 Games works.
- Restoring interrupted supply within the customer service standard.
- Balancing bill increases and investment through the price monitoring review.
- Managing wet weather overflows and storm impacts across the network.