Water and Sanitation Directorate, City of Cape Town

City of Cape Town metropolitan area, Western Cape, South Africa

Cape Town’s municipal water and sanitation service, diversifying beyond rain-fed regional dams after the 2018 drought while renewing pipes and treatment works.

Paste the caption with your link. Social platforms control how previews appear.

At a glance

Scale, service and financial position

881 Ml/dayTotal water demandFY2024/25 · actual
24.20%Non-revenue water (target 32%)FY2024/25 · actual vs target
99.62%Drinking-water quality compliance (Blue Drop status maintained)FY2024/25 · actual
R3.71 billionCapital expenditure allocated to Water and Sanitation (City total R9.29 billion)FY2024/25 · actual
605 Ml/dayWastewater treatedFY2024/25 · actual
117.21 kmSewer pipes replacedFY2024/25 · actual

01

About the Utility

The Water and Sanitation Directorate is the City of Cape Town’s own water and sanitation service, not a separate company, and is financed on the City’s balance sheet. That balance sheet carries a Moody’s rating of Ba2 following a recent upgrade, and the outlook was moved to positive in May 2026. The Directorate supplies drinking water and collects and treats wastewater across the metropolitan area, including basic services in informal settlements. It owns twelve water treatment plants and roughly 11 000 km of water pipes alongside 9 000 km of sewers. Most of its raw water comes from regional dams operated by the national Department of Water and Sanitation.

02

Water System

Cape Town draws almost all of its water from the dams of the regional Western Cape Water Supply System, with groundwater still a small share. Demand has recovered since the drought, reaching 881 Ml a day in 2024/25, while ageing treatment plants could deliver only about three-quarters of their design capacity in early 2024. Losses have fallen: non-revenue water was 24.20% against a 32% target, though bulk meter replacement may have affected input volumes, and drinking water kept Blue Drop status. With dam storage falling, the national department has cut domestic and industrial allocations, and Level 1 restrictions begin in December.

75%Available treatment capacity, share of the 1,600 Ml/day design capacity (approximate)March 2024 · as reported
3.1Infrastructure Leakage IndexFY2024/25 · actual
34.73Water mains failures per 100 km of pipeline (target 30)FY2023/24 · actual vs target

Non-revenue water

City of Cape Town, non-revenue water (national Circular 88 indicator WS5.1), %, financial years ending 30 June, 2021/22 to 2024/25

%
Non-revenue water: 2021/22, 32.8 %, actual; 2022/23, 34.3 %, actual; 2023/24, 25.4 %, actual; 2024/25, 24.2 %, actual202530354032.82021/2234.32022/2325.42023/2424.22024/25
Actual

2021/22 is the baseline printed in the 2022/23 annual report. The City noted that bulk meter replacement may have affected 2024/25 input volumes.

Sources: City of Cape Town integrated annual reports 2022/23 to 2024/25.

03

Wastewater System

Sewage is collected through a network relying on hundreds of pump stations and treated at the City’s own works, which handled 605 Ml a day in 2024/25. Effluent quality is the weak point: compliance with licence conditions had slipped from 90% to 80% over the decade to 2022, and the Zandvliet works, serving the fastest-growing catchment, had reached its flow capacity. Sewer blockages have fallen sharply over five years, and reuse volumes have risen. The Cape Flats bulk sewer upgrade was nearing its halfway mark in the latest infrastructure report.

80.9%Wastewater samples complying with water use licence conditions (target 80.0%)FY2022/23 · actual vs target
fewer than 88 000Sewer blockage incidents (over 130 000 in 2020/21)FY2024/25 · actual

04

Investment & Priorities

Capital spending is substantial: Water and Sanitation received R3.71 billion of the City’s capital expenditure in 2024/25, and pipe renewal is running ahead of its annual targets. The larger commitment is the New Water Programme, which aims to add 300 million litres a day from groundwater, reuse and desalination by 2030. Its two largest schemes, the Faure water reuse plant and the Paarden Eiland desalination plant, remain plans: both are proposed public-private partnerships with completion targeted for 2030/31, and Council has since approved that route in principle.

300 million litres a dayNew supply targeted by the New Water ProgrammeBy 2030 · target
R2,83 billionFaure New Water Scheme capital value (70–100 million litres a day)Completion by 2030/31 · plan (proposed PPP)
R2,38 billionPaarden Eiland Desalination Plant capital value (50–70 million litres a day)Completion by 2030/31 · plan (proposed PPP)

05

Sustainability & Resilience

Resilience planning is shaped by the 2018 drought, when Theewaterskloof, the largest supply dam, fell to a tenth of its capacity. The City now plans for a 25% fall in the yield of its supply dams by 2045 because of climate change, and clearing invasive alien plants from the catchments has recovered water for the regional system. Four of the twelve treatment plants generate their own hydropower. The nearer test is this summer: Level 1 restrictions from December ask residents to cut use by at least a tenth.

25%Planned-for reduction in yield of supply dams due to climate changeBy 2045 · planning assumption
13.1 million m3 a yearEstimated avoided water loss from alien plant clearingTo March 2023 · estimate

06

Key Challenges

  1. Managing demand through Level 1 restrictions as dam storage falls.
  2. Delivering the Faure reuse and Paarden Eiland desalination schemes on time.
  3. Restoring effluent compliance and capacity in growing catchments.
  4. Sustaining lower non-revenue water as bulk meters are replaced.
  5. Maintaining ageing treatment plants that run below design capacity.

07

Major Projects

Faure New Water Scheme

Planned water reuse plant purifying treated wastewater to drinking quality, proposed as a public-private partnership.

Status / period
Planned; partnership route approved in principle (December 2025)
Investment / capacity
70–100 million litres a day; R2,83 billion

Paarden Eiland Desalination Plant

Planned seawater desalination plant at Paarden Eiland, proposed as a public-private partnership.

Status / period
Planned; procurement to start with a Request for Qualification
Investment / capacity
50–70 million litres a day; R2,38 billion

Cape Flats bulk sewer upgrade

Upgrade of 28 km of bulk sewer pipelines serving the Cape Flats.

Status / period
Construction, nearing halfway (2025)
Investment / capacity
28 km

Evidence

Sources and reporting periods

This Snapshot draws on the City of Cape Town’s integrated annual reports for 2020/21 to 2024/25, its Water Outlook reports from 2018 to 2024, its infrastructure reports for 2022, 2023 and 2025, and a City media release on new water supply.

Evidence through: 2026-09-2613 source documents

Report library

Reports on Water and Sanitation Directorate, City of Cape Town

1 report available for purchase

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.