About the Utility
Water Services Corporation is Malta’s sole national water and wastewater utility. It is wholly owned by the Government of Malta and licensed by the Regulator for Energy and Water Services as the only operator of potable water supply and wastewater services in Malta and Gozo. It handles every part of the water cycle except stormwater, from desalination and groundwater abstraction to distribution, sewage treatment and the reclaimed New Water it makes available to farmers. The regulator recorded 323,800 active accounts in 2024. Its tariffs were approved on a full-cost-recovery basis for water, with a government subvention covering part of wastewater costs, and in 2025 a budgeted rise in spending cut its profit before tax by 67% to €6.9 million.
02
Water System
Desalination now carries most of Malta’s public supply: in 2025 the Corporation’s four seawater reverse osmosis plants produced 70.7% of its potable water, with groundwater pumping stations and boreholes supplying the rest, easing pressure on aquifers that are designated drinking water protected areas. Leakage control is its strongest performance story, with the average infrastructure leakage index at a record 1.6 that year and non-revenue water down to 22.18%. Demand keeps rising, by about 5% in 2024 alone, while the regulator reported full compliance with mandatory microbiological and chemical drinking water standards that year.
Billing efficiency
Water Services Corporation, percentage of water production billed, 2022 to 2025
Calendar years. The share of water produced that is billed; the remainder is non-revenue water. 2022 is the green bond baseline year.
Sources: ClearFlowPlus plc green bond Impact and Allocation Report, financial year 2025 (Water Services Corporation).03
Wastewater System
Wastewater sits fully within the Corporation’s remit. Its three treatment plants, Ta’ Barkat in the south of Malta, Iċ-Ċumnija in the north and Ras il-Ħobż in Gozo, treated 28.5 million cubic metres in 2025 and discharge treated effluent to coastal waters. Compliance is the pressure point: Malta has faced an EU infringement case over secondary and more stringent treatment, and the Court of Justice ruled against it in October 2024. The north plant is being upgraded under a €33.15 million design-and-build contract to treat 20,000 cubic metres a day, with commissioning planned for the end of 2027.
04
Investment & Priorities
The 2025 annual report records capital expenditure of €100.3 million, while management accounts cited in the green bond review give €97.1 million for the same year. Both sit within a National Investment Plan first costed at €310 million over ten years, later described at €377 million and most recently as more than €400 million over the next decade; the plan is under review. EU funds, government support and a €25 million green bond help finance it, funding a completed aeration upgrade at Ta’ Barkat and a non-revenue water programme.
05
Sustainability & Resilience
Resilience depends on producing enough water and powering it more cleanly. The Corporation’s wider programme aims to add about 81,000 cubic metres a day of freshwater production capacity, starting with a tendered new reverse osmosis plant at Għar Lapsi. Desalination is energy-intensive: the total energy needed per cubic metre produced rose to 4.87 kWh in 2025. Renewable generation reached 10.19 GWh, but the Corporation has set no quantified greenhouse gas target while it completes a comprehensive emissions inventory.
06
Key Challenges
- Delivering new desalination capacity ahead of rising peak demand.
- Bringing wastewater treatment into line with EU directive requirements.
- Protecting groundwater by shifting supply towards desalination.
- Containing the energy and cost burden of desalination.
- Sustaining record gains in leakage and non-revenue water.
07
Major Projects
Għar Lapsi Plant B reverse osmosis plant
New six-system desalination plant beside the existing Għar Lapsi works, part of a wider programme to raise freshwater production capacity.
- Status / period
- Out to tender (issued August 2026)
- Investment / capacity
- €35 million estimated, excluding VAT · 30,000 m³ a day planned
Iċ-Ċumnija wastewater treatment plant upgrade
Design-and-build upgrade of the north Malta plant to raise treatment capacity and New Water production.
- Status / period
- Contract signed February 2026 · commissioning planned end-2027
- Investment / capacity
- €33.15 million, excluding VAT · 20,000 m³ a day planned
Non-revenue water and billing efficiency programme
Green-bond-financed upgrade of billing and systems to cut non-revenue water and raise the share of production billed.
- Status / period
- 45% complete at end-2025 · completion planned end-2027
- Investment / capacity
- €10,343,148 contracted cost