Free City Snapshot

Muscat

Oman

A governorate of 1.5 million residents supplied mainly by desalinated seawater, where local sources cannot meet demand alone and new desalination, sewerage and flood defences are under way.

Browse all 8 city reports

Paste the caption with your link. Social platforms control how previews appear.

At a glance

Scale, resources and strategic position

1,532,486Registered residents
202.2 million m³Water produced
133.4 million m³Water distributed
606,000 m³/dayAverage water demand
341,355Water connections
98.53%Continuity of water supply

01

City Water System

Muscat’s water system is organised at governorate level: six wilayats from historic Muscat and Mutrah to Bawshar, As Seeb, Al Amrat and Qurayyat, with 1.53 million registered residents at end-2025. Responsibility is unusually concentrated. Nama Water Services is the sole provider of water distribution and wastewater services. Nama Power and Water Procurement (Nama PWP) buys all bulk desalinated water from independent producers. The Authority for Public Services Regulation (APSR) licenses the utility, approves bulk water prices and compiles sector statistics. Muscat Municipality handles stormwater and wadi drainage and is the main user of treated effluent, while the Ministry of Agriculture, Fisheries and Water Resources manages groundwater, wells and dams.

02

Resources & Supply

Oman withdraws more water than it renews, and desalinated seawater has supplied the capital since the early 1970s. Within the Muscat Zone, Nama PWP contracts two reverse-osmosis plants, Ghubrah II (191,000 m³ a day) and Qurayyat (200,000 m³ a day), while Nama Water Services runs three smaller plants and wellfields. These local sources cannot meet projected demand, so water is also transferred in from the neighbouring Barka Zone.

Muscat produced 202.2 million m³ in 2025 (provisional) and distributed 133.4 million m³, of which 7.5 million m³ went by tanker. Average demand in the zone, estimated at 606,000 m³ a day in 2025, is projected to reach 677,000 m³ a day by 2032.

300,000 m³/dayGhubrah III contracted desalination capacity
~242,000 m³/dayAvailable transfers from the Barka Zone
774,000 m³/dayPeak water demand

03

Wastewater & Stormwater

Wastewater services lag well behind water supply. Across Nama Water Services’ licensed area, Oman excluding Dhofar, wastewater coverage was 31.7% in 2025, against 72.4% for water. In Muscat the utility is extending sewers and treatment capacity: the main Seeb plant was expanded from 62,000 to 82,000 m³ a day in 2024, and a public–private tender to enlarge the Al Ansab and Al Amerat plants reached the bidding stage in 2026. Treated effluent, used mainly for landscape irrigation, achieved 96.56% compliance with quality standards in Muscat in 2025. Flood exposure is high: nearly 45% of the capital is reported vulnerable to wadi floods and about 20% to coastal flooding.

82,000 m³/daySeeb wastewater treatment plant capacity
96.56%Treated-effluent compliance with quality standards
~207,000 m³/dayAl Ansab plant capacity after Phase III

04

Investment & Resilience

The largest supply addition under way is Ghubrah III, a 300,000 m³-a-day desalination plant costing about RO 125 million, 93% built in November 2026, with operations expected in the second quarter of 2027. A water purification plant at Wadi Dayqah Dam, 57% complete in October 2026, is due to be operational in May 2027 with 35,000 m³ a day of drinking-water capacity.

In July 2026 Nama Water Services awarded a 15-year performance-based operations contract worth about RO 900 million for Muscat and the two Sharqiyah governorates; it targets cutting water loss from 34% to 11% by 2040. The Wadi Adai flood protection dam in Mutrah was 53.7% complete in June 2026.

05

Key Challenges

  1. Meeting rising peak demand, which Nama PWP projects will reach 774,000 m³ a day in the Muscat Zone by 2032.
  2. Bringing Ghubrah III into operation on its revised 2027 schedule while local sources still depend on transfers from the Barka Zone.
  3. Managing network water losses, which Nama Water Services put at 37.1% across its licensed area in May 2025.
  4. Extending sewer connections and treatment capacity to narrow the gap between water and wastewater coverage.
  5. Protecting the capital from wadi and coastal flooding while dam and drainage works are completed.

Evidence

Drawn from Nama Water Services’ 2025 annual report and releases, Nama PWP’s Water 7-Year Statement 2026–2032, NCSI statistical bulletins compiled from APSR data, FAO AQUASTAT and national press reporting. Many utility figures cover Oman excluding Dhofar; scope is labelled.

Evidence through November 2026 · 104 sources read

Report library

City reports on Muscat

8 reports available for purchase

Water Infrastructure Investment and Project Pipeline in Muscat cover

Water Infrastructure Investment and Project Pipeline in Muscat

An assessment of what is being built and financed for Muscat's water, wastewater and flood protection, by whom, at what stage and value, and which contracts open to bidders by 2027. Muscat's water projects are moving fastest where private capital carries the risk: Ghubrah III, backed by a US$370 million project finance package, was 93% built in November 2026, and bids for the Al Ansab and Al Amerat sewage plant PPP are due on 5 January 2027. Network works of about RO 188 million in Al Seeb and Bawshar rest on Nama Water Services, whose 2024 operating revenue was 40.5% government subsidy, while its RO 11.1 billion master plan puts RO 7.2 billion into wastewater.
Edition
November 2026, First edition
Price
USD 249
Explore report →
Muscat City Intelligence Profile cover

City profile

Muscat City Intelligence Profile

A reference profile answering who runs Muscat's water, where it comes from, what it costs and which projects will change the capital's supply, wastewater and flood protection from 2027. Muscat's own plants do not cover its demand: the governorate's two contracted desalination plants hold 391,000 m³ a day and two operating NWS plants about 40,000, against 2025 Muscat Zone demand of 606 thousand m³ a day on average and 677 thousand at peak, with the balance carried from the Barka Zone. Ghubrah III, a 300,000 m³ a day plant 93% built in November 2026, is expected to operate from Q2 2027, while water produced for Muscat fell from 233.3 million m³ in 2024 to 202.2 million m³ in 2025.
Edition
November 2026, First edition
Price
USD 99
Explore report →
Circular Water Economy in Muscat cover

Circular water economy

Circular Water Economy in Muscat

This report evaluates how Muscat is transitioning from a desalination-dependent linear model toward demand efficiency, treated-effluent reuse, resource recovery, digital operations, and climate-resilient water management.
Edition
2025
Price
USD 499
Explore report →
Digital Water and AI in Muscat, Oman cover

Digital water and AI

Digital Water and AI in Muscat, Oman

This report evaluates how smart metering, integrated utility data, Artificial Intelligence, non-revenue water reduction, desalination dependence, infrastructure investment, and institutional capability shape water-system performance in Muscat.
Edition
2025
Price
USD 499
Explore report →

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.