Clean sources supplied 10.10 TWh of the 62.21 TWh that Dubai Electricity and Water Authority (DEWA) generated in 2025, a 16.23% share, up from 11.2% in 2024. In Q1 2026 the share was 18.5%, although a single quarter is not a full-year trend.
A solar park heading past 8,000 MW
The Mohammed bin Rashid Al Maktoum Solar Park reached 4,660 MW installed at September 30, 2026. In January 2026 DEWA said it expects the park to exceed 8,000 MW by 2030, against an original plan of 5,000 MW. DEWA's wider 2030 plan is for over 23 GW of generation, around 8.3 GW of it renewable.
Batteries and pumped storage
The seventh phase pairs 2,000 MW of PV with 1,400 MW / 8,400 MWh of battery storage. ACWA Power, EtihadWE and Masdar bid on July 1, 2026; MEED reported Masdar as lowest bidder, and no award had been announced. The 250 MW / 1,500 MWh Hatta pumped-storage plant began trial operation on August 19, 2025.
Emissions rose from 2021 to 2022
DEWA's Scope 1 figure for 2022 was 24.61 MtCO2e for power and desalination combined, up from 24.11 MtCO2e in 2021, while electricity carbon intensity fell from 0.4747 to 0.4035 tCO2e/MWh. The stakes now include water: DEWA's 2030 plan has 308 MIGD of reverse osmosis running on renewable energy.
How the clean-power program links to Hassyan's desalination capacity, what DEWA has borrowed in 2026, and which awards to watch are covered in the report. The full report, Water Utility of the Future: Dubai Electricity and Water Authority, is available for USD 499. For a free overview, read the Dubai Electricity and Water Authority Utility Snapshot.