Intelligence Reports/Water Utility Intelligence Report
Water Utility of the Future: Dubai Electricity and Water Authority cover

Water Utility Intelligence Report

Water Utility of the Future: Dubai Electricity and Water Authority

An assessment of how Dubai Electricity and Water Authority is moving from thermal desalination and conventional generation to a reverse osmosis, solar, storage and smart-grid system, and what must happen by 2030. DEWA plans 735 MIGD of desalination by 2030, with reverse osmosis rising from 68 MIGD at the end of 2025 to 308 MIGD on renewable energy, and installed capacity already reached 615 MIGD at September 30, 2026. Clean power supplied 16.23% of generation in 2025, while borrowings rose to AED 43,725,005 thousand at March 31, 2026, a quarter that included a new AED 5,000 million term loan and the Empower purchase.

Geography
Dubai, United Arab Emirates
Report type
Water Utility of the Future
Evidence current to
22 November 2026
Format
PDF
Length
16 pages
Edition
November 2026, New edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

735 MIGD by 2030: DEWA's desalination capacity plan, of which 308 MIGD seawater reverse osmosis using renewable energy, against 68 MIGD of reverse osmosis at the end of 2025 (plan)

495 → 615 MIGD: installed desalination capacity from the end of 2025 to September 30, 2026, a rise that began with the 60 MIGD Block A of the Hassyan seawater reverse osmosis plant in Q1 2026 (actual)

AED 1.76 billion: 30-year agreement signed with ACWA Power in late October and early November 2026 for a further 60 MIGD at Hassyan, with DEWA holding 60% (contracts signed)

16.23%: clean energy's share of the 62.21 TWh DEWA generated in 2025, up from 11.2% in 2024 (actual)

02

Buyer relevance

Who the report is for

Desalination developers and reverse osmosis suppliers

Size the gap between 615 MIGD installed at September 30, 2026 and the 735 MIGD DEWA plans for 2030, and track Hassyan's 180 MIGD first phase and the further 60 MIGD signed in late 2026.

Solar, battery and grid contractors

Follow the Phase 7 procurement of 2,000 MW of PV with 8,400 MWh of batteries, the AED 7 billion Smart Grid Strategy through 2035 and more than AED 8.5 billion of substations due by 2028.

Lenders and equity investors

Read borrowings of AED 43,725,005 thousand at March 31, 2026, the AED 5,000 million two-year term loan and the minimum AED 6.2 billion dividend that runs to 2027 against DEWA's investment program.

Climate and energy-transition advisers

Set the clean share of generation (11.2% in 2024, 16.23% in 2025) against DEWA's 2022 Scope 1 figure of 24.61 MtCO2e and the city-wide clean energy targets.

03

Decision scope

Questions answered

01

How much desalination capacity does DEWA plan for 2030?

735 MIGD by the end of 2030, of which 308 MIGD seawater reverse osmosis using renewable energy, against 495 MIGD at the end of 2025.

02

Is Hassyan's first reverse osmosis phase complete?

Block A (60 MIGD) has been in service since Q1 2026 and total capacity reached 615 MIGD at September 30, 2026; DEWA's two published dates for completing all 180 MIGD are during 2026 and Q1 2027.

03

How fast is DEWA's clean power share rising?

Clean sources supplied 16.23% of DEWA's 62.21 TWh of power in 2025, up from 11.2% in 2024, and 18.5% in Q1 2026.

04

How is DEWA financing the program?

From operating cash, project companies with partners such as ACWA Power and Masdar, and borrowing: total borrowings rose from AED 38,576,275 thousand at the end of 2025 to AED 43,725,005 thousand at March 31, 2026.

04

Inside the report

Inside the complete report

Executive Snapshot

1. From Service Provider to System Operator

2. System Intelligence and Digital Control

3. Energy, Carbon, and Resource Decoupling

4. Infrastructure Strategy for a Non-Stationary Climate

5. Customers, Demand, and the Water Prosumer

6. Governance, Regulation, and Institutional Reform

7. Capital Planning and Financial Architecture

8. Strategic System Roadmap

Conclusion

Source Register

05

Public preview

What to watch next

7. Capital Planning and Financial Architecture

FY2026 results for capital expenditure and borrowings, including how the AED 5,000 million term loan is refinanced or repaid; financial close for Hassyan Phase 2; the post-2027 dividend policy; any green or sustainability-linked financing at DEWA PJSC level.

6. Governance, Regulation, and Institutional Reform

DEWA's dividend policy for the years after 2027; Moody's next rating action; any DEWA-owned carbon or water-efficiency target with a date.

4. Infrastructure Strategy for a Non-Stationary Climate

DEWA's confirmation that Hassyan's first phase is complete; the award of the Phase 2 pipeline packages; completion of the Hassyan reservoir and the aquifer reserve; peak demand in summer 2026, published with the FY2026 results.

3. Energy, Carbon, and Resource Decoupling

The Phase 7 award and tariff; DEWA's next published Scope 1 and carbon intensity figures; full-year 2026 clean generation share; any water-specific energy or emissions disclosure.

Sample page · page 7 of 16

Section 4: DEWA's water supply and storage projects, with status checked on November 22, 2026, and the two published completion dates for Hassyan's first phase.

Report page with tables listing Hassyan reverse osmosis phases, pipelines, reservoirs and the aquifer storage reserve, their scale and status, and DEWA's reservoir storage totals.

06

Included

What you receive

The complete PDF report: 16 pages, 11 sections, 18 tables and a register of 28 sources.

This edition

November 2026, New edition. Covers DEWA's results to the nine months ended September 30, 2026, with project, procurement and tariff status checked on November 22, 2026. Sets out DEWA's 2030 capacity plan of 735 MIGD of desalination and over 23 GW of generation. Includes the Hassyan reverse osmosis agreement for a further 60 MIGD signed in late October and early November 2026, and the Phase 7 solar and battery procurement. Adds borrowings at March 31, 2026, the AED 5,000 million term loan and audited FY2025 capital expenditure by segment. New edition, November 2026, with evidence current to 22 November 2026. Replaces the earlier edition for new buyers; buyers of an earlier edition keep access to the edition they bought.

07

Evidence & method

Evidence and method

DEWA's stock-exchange results releases from 2022 to Q1 2026, its audited FY2024 financial statements and Q1 2026 interim financial information, and its 2021 and 2022 sustainability and integrated reports. Project and procurement status comes from DEWA statements through the Dubai Media Office, coverage of DEWA's nine-month 2026 results, and Dubai and UAE government strategy documents.

Sources

28 sources, listed in the report's source register. Evidence current to 22 November 2026. Principal data periods: DEWA results for calendar 2022–2025, Q1 2026 and the nine months to September 30, 2026; audited FY2024 financial statements; DEWA sustainability and integrated reports for 2021 and 2022. Project, procurement and tariff status checked on November 22, 2026. Currency is UAE dirhams (AED) unless stated. Water volumes are in imperial gallons, as DEWA reports them: MIGD is million imperial gallons a day, MIG million imperial gallons and BIG billion imperial gallons.

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Lead Analyst, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility transformation, infrastructure, governance, finance and climate resilience for executive and policy audiences.

  • Evidence-led water intelligence
  • Decision-focused system analysis
  • Report-specific treatment of scope and terminology

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Utility of the Future: Dubai Electricity and Water Authority

Format
PDF
Length
16 pages
Edition
November 2026, New edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Water Utility Intelligence Report
Report type
Water Utility of the Future
Edition
November 2026, New edition
Format
PDF
Length
16 pages
Reference
OFW-DEWA-AE-WUTF_4b2d61085847
Evidence current to
22 November 2026

14

Explore this report family

More Water Utility of the Future reports

Explore the same report family covering other utilities.

Water Utility of the Future: Department of Energy, Abu Dhabi Emirate cover

Water Utility of the Future

Water Utility of the Future: Department of Energy, Abu Dhabi Emirate

An assessment of how Abu Dhabi's Department of Energy is moving from regulating licensed water companies to planning, monitoring and decarbonizing the emirate's water system as a whole, and what its 2027–2035 milestones depend on. The Department of Energy has set dated system targets, a 40% cut in network water losses by 2035 and a 500 million m³ cut in groundwater abstraction by 2030, of which measures for half had been identified by October 2026. Reverse osmosis reached 45% of water generation at EWEC-contracted plants in 2025, while the RC2 price control that funds the network companies ends on December 31, 2026 with no successor published.
Geography
Abu Dhabi, United Arab Emirates
Edition
November 2026, New edition
Length
16 pages
Explore report
Water Utility of the Future: Water and Sanitation Directorate, City of Cape Town cover

Water Utility of the Future

Water Utility of the Future: Water and Sanitation Directorate, City of Cape Town

An assessment of how Cape Town's Water and Sanitation Directorate is turning a dam-fed network into a diversified, metered and data-managed water system, and what could slow it before 2036. Cape Town's committed New Water Programme, a peak design capacity of 305 Ml/day, is now due by December 2036, while the City expects to reach its raw water allocation within two years. In the meantime it is installing about 83,000 smart meters by February 2029 and opened Faure reuse procurement on 25 September 2026, with 70 Ml/day due by June 2031.
Geography
Cape Town, South Africa
Edition
November 2026, New edition
Length
14 pages
Explore report
Water Utility of the Future: Electricity and Water Authority cover

Water Utility of the Future

Water Utility of the Future: Electricity and Water Authority

An assessment of how Bahrain's Electricity and Water Authority is changing from owning plants to buying private supply and operating the system, and which awards and targets set its path to 2032. Two private reverse osmosis plants in procurement, Hidd at 60 MIGD and Sitra at 30 MIGD, would add capacity equal to 42.2% of EWA's 213.22 MIGD installed in 2024, but neither had been awarded by 24 November 2026. EWA has set a 23% water loss target for 2032 with staged flow-meter replacement from 2026, while its first solar IPP was retendered with operation now targeted for 31 December 2028.
Geography
Bahrain, Middle East
Edition
November 2026, New edition
Length
15 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.