01
Executive overview
Key findings
US$464.97 million: estimated cost of the Al Jasra 400 kV station, inaugurated 20 January 2026, with a US$200 million Islamic Development Bank loan
US$407 million: Al Dur 2 water transmission and storage programme, lender financing approved in 2022
2 private plants in procurement: Hidd Independent Water Project (up to 60 MIGD) and Sitra Independent Water and Power Project (at least 1,200 MW and 30 MIGD); neither awarded as of 7 November 2026
B / B / B2 (negative): Kingdom of Bahrain sovereign ratings from S&P, Fitch and Moody's (2025–2026)
02
Buyer relevance
Who the report is for
Desalination equipment and O&M suppliers
See that Acwa is the lowest Sitra bidder and the only remaining Hidd bidder, and plan an approach through the developer before award.
Grid equipment makers and substation contractors
Track the nine 66 kV substations staged 2026–2028 and the Sitra 400 kV packages held by Siemens Energy and Hitachi Energy.
Metering and leak-detection firms
Prepare for flow-meter replacement under EWA's plan to reach 23% water loss by 2032.
Business development teams entering the Gulf
Use the Opportunity Register and commercial priorities to decide which of 12 EWA programmes to pursue first.
03
Decision scope
Questions answered
Which EWA procurements are active?
Hidd (up to 60 MIGD), Sitra (at least 1,200 MW and 30 MIGD), the Hawar intake, outfall and storage packages and the 100 MW BAJ Solar IPP were all in procurement on 7 November 2026.
Who already holds EWA's grid work?
Siemens Energy holds the Sitra 400 kV substation (US$127m), Hitachi Energy the transformers and reactors (US$47.1m), and Al-Kooheji Electrical the nine 66 kV substations.
How is EWA's grid financed?
Development lenders provide US$470.21 million of about US$872 million across Al Jasra and Al Dur 2 water transmission, including a US$200 million IsDB loan.
What is the counterparty risk?
Bahrain is rated B by S&P and Fitch and B2 with a negative outlook by Moody's, and a draft law would move EWA's assets and liabilities to a national company.
04
Inside the report
Inside the complete report
1. The Account at a Glance
2. Organisation and Decision-Making
3. Financial Position
4. Priorities and Pressures
5. How Electricity and Water Authority Buys
6. Opportunity Register
7. Commercial Priorities: Where to Focus First
8. Watch List: What to Monitor and What to Do
Source Register
05
Public preview
What to watch next
Sitra IWPP award (expected by end-2026)
Largest plant contract in the current round.
Hidd IWP award
Bahrain's first independent water-only project; published dates differ (Q2 2028 or by 2029).
Tender Board openings
Bid prices and bidders for EWA packages are published.
Water loss plan tenders
Flow-meter replacement is due to start in 2026.
The Opportunity Register: status, stage, contractors, supplier categories and route in for each EWA programme.

06
Included
What you receive
The complete PDF report: 10 pages, 9 sections, 6 tables and a register of 21 sources.
This edition
November 2026, First edition.
07
Evidence & method
Evidence and method
The brief draws on EWA's Statistical Books and announcements, MEED and Bahraini press reports on bids, awards and loans, and rating agency coverage, all checked on 7 November 2026.
Sources
21 sources, listed in the report's source register. Evidence current to 7 November 2026. Principal data periods: EWA Statistical Books 2016–2024 (primary year 2024); project, procurement, financing, tariff and legislative status checked against public sources on 7 November 2026. Currency is the Bahraini dinar (BD), with US dollar equivalents (US$) as the sources report them..
08
Lead analyst
Robert C. Brears
Founder, Our Future Water Intelligence
Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.
- Decision-focused utility intelligence
- Published water-policy author
- Evidence-grounded system analysis
09
Buyer FAQs
Before you purchase
Who can use the report?
Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.
How is the report delivered?
The PDF is available to download immediately after confirmed payment, through our secure delivery system.
Can my organization buy wider access?
Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.
10
Electricity and Water Authority: Utility Account Brief
- Format
- Length
- 10 pages
- Edition
- November 2026, First edition
- Price
- USD 499
11
Report details
Publication details
- Publisher
- Our Future Water Intelligence
- Report family
- Utility Account Brief
- Edition
- November 2026, First edition
- Format
- Length
- 10 pages
- Reference
- OFW_EXT_ELECTRICITY_AND_WATER_AUTHORITY_UTILITY_ACCOUNT_BRIEF_3eb0f83715c1
- Evidence current to
- 7 November 2026
14
Explore this report family
More Utility Account Briefs
Explore the same report family covering other utilities.

Berliner Wasserbetriebe: Utility Account Brief
- Geography
- Berliner Wasserbetriebe
- Edition
- October 2026, First edition
- Length
- 12 pages

Department of Energy, Abu Dhabi Emirate: Utility Account Brief
- Geography
- Department of Energy, Abu Dhabi Emirate
- Edition
- October 2026, First edition
- Length
- 12 pages

Utility Account Brief
Denver Water: Utility Account Brief
- Geography
- Denver, United States
- Edition
- October 2026
- Length
- 10 pages