Intelligence Reports/Country Intelligence Profile
Netherlands Country Intelligence Profile cover

Country Intelligence Profile

Netherlands Country Intelligence Profile

The Netherlands draws most of its renewable water from upstream rivers and supplies drinking water through ten public companies that produced 1,191 million m³ in 2025. The profile sets out who runs Dutch water, where it comes from, what it costs, which projects are under way and where drinking water capacity, the 2026 drought and a Delta Programme funding gap put pressure on the system.

Geography
Netherlands
Evidence current to
1 November 2026
Format
PDF
Length
13 pages
Edition
November 2026, First edition
Price
USD 99
Secure Stripe checkout · your paid edition is delivered privately in this browser.

01

Executive overview

Key findings

1,191 million m³: drinking water produced by the ten public companies in 2025, up from 1,161 million m³ in 2024 (European Netherlands)

EUR 1,171 million: drinking water sector investment in 2025 (actual), up from EUR 899 million in 2024 and EUR 458 million in 2010

EUR 2.05 per m³: 2026 weighted-average residential drinking water rate for a 100 m³ household, excluding taxes, up 3.9% on 2025

EUR 34–42 billion: funding needed to 2050 for flood safety, freshwater and climate adaptation, against about EUR 29 billion assumed in the Delta Fund (projection)

02

Buyer relevance

Who the report is for

Firms entering the Dutch water market

Identify who permits, supervises and buys, from IenW and Rijkswaterstaat to the 21 water boards and the ten drinking water companies.

Contractors and equipment suppliers

See the named programmes, from the completed Afsluitdijk works to the EUR 1.4–2.3 billion IJmuiden replacement estimate and the Vitens and Evides investment plans.

Lenders and investors

Compare sector investment of EUR 1,171 million in 2025 with the two published investment-need estimates and the sector balance sheet.

Policy and public-affairs teams

Track dated changes such as the NAS'26 adaptation strategy, the water board elections on 17 March 2027 and the drinking water supervision reform.

03

Decision scope

Questions answered

01

Is the Netherlands short of water?

Not on average: water stress was 14.91% in 2023. But 87.91% of renewable resources come from abroad, and the country was in a national actual water shortage from 16 July to 3 September 2026.

02

Who supplies drinking water?

Ten public companies owned by municipalities and provinces; the largest, Vitens, serves 6,008 thousand inhabitants of the 18,248 thousand covered.

03

What does drinking water cost?

The 2026 weighted-average residential rate is EUR 2.05 per m³ for a 100 m³ household before taxes, ranging from EUR 1.75 at Vitens to EUR 2.71 at PWN.

04

How large is the flood and freshwater funding gap?

EUR 34–42 billion is needed to 2050 for flood safety, freshwater and adaptation, against about EUR 29 billion assumed in the Delta Fund.

04

Inside the report

Inside the complete report

Executive Snapshot

1. Country Water Profile

2. Water Resources and Supply

3. Institutions and Utilities

4. Infrastructure and Major Projects

5. Tariffs and Finance

6. Climate and Resilience

7. Outlook and What to Watch

Source Register

05

Public preview

What to watch next

3. Institutions and Utilities

The next stage of the Drinking Water Act amendment and the water board elections on 17 March 2027.

4. Infrastructure and Major Projects

Allocation of the remaining EUR 250 million for the HWBP, an investment decision on IJmuiden and a permit application at Schalkwijk.

5. Tariffs and Finance

2027 tariff announcements and the cost-of-capital standard for the period from 2028.

6. Climate and Resilience

Adoption of the national climate adaptation strategy (NAS'26), planned for late 2026, and the government's long-term financing study for the Delta Fund.

Sample page · page 7 of 13

Infrastructure indicators and the major project table with owner, value, stage and timeline.

Report page with a table of Dutch water infrastructure indicators and a table of major projects including the Afsluitdijk reinforcement, the Flood Protection Programme, the IJmuiden complex replacement and the Vitens and Evides investment plans.

06

Included

What you receive

The complete PDF report: 13 pages, 9 sections, 10 tables and a register of 44 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

Official statistics from CBS and FAO AQUASTAT, the Vewin sector fact sheets for 2024 and 2025, government and Rijkswaterstaat programme and budget documents, regulator publications from ACM, and company annual reports and 2026 tariff schedules.

Sources

44 sources, listed in the report's source register. Evidence current to 1 November 2026. Principal data periods: 2023 national water accounts; 2025 drinking water sector data (Vewin, published September 2026); 2024 wastewater statistics; 2026 tariffs; the 2026 drought season; plans and projections to 2030 and 2050. Status checks as of 1 November 2026. All currency is euros (EUR) unless stated..

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Netherlands Country Intelligence Profile

Format
PDF
Length
13 pages
Edition
November 2026, First edition
Price
USD 99
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Country Intelligence Profile
Edition
November 2026, First edition
Format
PDF
Length
13 pages
Reference
OFW_EXT_NETHERLANDS_COUNTRY_INTELLIGENCE_PROFILE_035535a81fe6
Evidence current to
1 November 2026

14

Explore this report family

More Country Intelligence Profiles

Explore the same report family covering other countries.

Morocco Country Intelligence Profile cover

National Water Research and Reference

Morocco Country Intelligence Profile

Morocco is building desalination, dams and transfers faster than it is adopting the plans and tariffs to govern them.
Geography
Morocco
Edition
October 2026, New edition
Length
14 pages
Explore report
Qatar Country Intelligence Profile cover

National Water Research and Reference

Qatar Country Intelligence Profile

Qatar draws virtually all its drinking water from desalination, with 538 MIGD of capacity against 420 MIGD of demand.
Geography
Qatar
Edition
October 2026 edition
Length
12 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.