Intelligence Reports/Water Utility Intelligence Report
Water Systems Overview: Orange County Water District cover

Water Utility Intelligence Report

Water Systems Overview: Orange County Water District

An assessment of how the Orange County Water District keeps northern Orange County's groundwater basin full, safe and funded, from recharge sources and governance to the GWRS and PFAS treatment. The basin's accumulated overdraft rose from 133,000 af to 183,000 af in the dry 2024-25 water year, while PFAS treatment has returned 55 wells to service against more than 100 impacted. Replenishment Assessment revenue of US$206.4 million made up about 96.8% of FY2025 operating revenues.

Geography
Orange County Groundwater Basin, California
Evidence current to
18 November 2026
Format
PDF
Length
14 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

85%: the basin's share of the water used by 2.5 million people in northern Orange County (FY2026-27 budget)

183,000 af: accumulated overdraft at June 30, 2025, up from 133,000 af a year earlier, after rainfall of 37% of the long-term average

106.0 MGD: average output of the Groundwater Replenishment System (GWRS) in 2025, against a design capacity of 130 MGD

55 wells back online: after PFAS treatment, out of more than 100 impacted wells (October 2026); the District estimates PFAS costs at about US$1.8 billion over 30 years

02

Buyer relevance

Who the report is for

Water treatment and construction firms

Use the project table to see which PFAS plants were awarded in 2026, at US$23,587,500 and US$31,785,907, and which remain in design or bidding.

Groundwater and water resource planners

Compare replenishment by source across four water years, with Santa Ana River recharge ranging from 113,000 to 168,005 af.

Credit analysts and municipal investors

Set the 4.19 debt service coverage and US$798.0 million of long-term debt against US$1.8 billion of projected PFAS costs over 30 years.

Producer agencies and local government officials

Follow how the 2026-27 assessments, from the US$728 combined rate to Basin Equity Assessments of US$463 to US$897 per af, are set and applied.

03

Decision scope

Questions answered

01

How much of northern Orange County's water comes from the basin?

The District's FY2026-27 budget states that the basin supplies 85% of the water used by 2.5 million people in northern Orange County.

02

How did the basin fare in the 2024-25 dry year?

With rainfall at 37% of the long-term average, storage fell by 50,000 af and the accumulated overdraft rose to 183,000 af at June 30, 2025.

03

How much does the GWRS produce?

It averaged 106.0 MGD in calendar 2025, about 118,746 af, against a design capacity of 130 MGD.

04

How far has PFAS treatment progressed?

The District reported 55 wells back online in October 2026, out of more than 100 impacted wells, and projects PFAS costs of about US$1.8 billion over 30 years.

05

What do producers pay to pump?

A combined Replenishment Assessment of US$728 per af in 2026-27, up from US$711 and 63.6% above the FY2017-18 rate.

04

Inside the report

Inside the complete report

Executive Overview

1. Water Resource Profile

2. Governance and Institutional Framework

3. Infrastructure and Service Delivery

Strategic Outlook and Opportunities

Source Register

05

Public preview

What to watch next

1. Water Resource Profile

The 2025-26 Engineer's Report (the measured June 2026 accumulated overdraft against the 174,000 af projection); the Basin Production Percentage set in April 2027; Santa Ana River capture in the 2026-27 storm season.

2. Governance and Institutional Framework

The April 2027 assessment hearing (rate and Basin Production Percentage); Board composition after the November 3, 2026 division elections; any rating action.

3. Infrastructure and Service Delivery

GWRS production in FY2026-27 against the 128,000 af budget expectation (19,073 af in July and August 2026, preliminary); the count of wells back online; Talbert Barrier rehabilitation awards; the Anaheim Lake design decision.

Strategic Outlook and Opportunities

Board awards for Fullerton Well 10, Anaheim Wells 48 and 53 and resin supply; the FY2027-28 budget and assessment rate; the North Basin Record of Decision; any reactivation of the Commercial Paper Program; the next total of wells back online.

Sample page · page 10 of 14

PFAS funding figures and the status of major projects and programs at November 18, 2026, from the Strategic Outlook.

Report page with a table of PFAS funding figures by date and a table of major projects with contractors, budgets and status.

06

Included

What you receive

The complete PDF report: 14 pages, 6 sections, 18 tables and a register of 29 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

The District's audited financial reports for FY2019 to FY2025, the 2024-25 Engineer's Report, the GWRS 2025 Annual Report, the FY2026-27 budget and 2026 Board minutes and agendas; the Santa Ana River Watermaster report; and District, EPA and partner agency releases on PFAS, financing and Prado Dam.

Sources

29 sources, listed in the report's source register. Evidence current to 18 November 2026. Principal data periods: water year and fiscal year 2024-25 (July 1, 2024 to June 30, 2025; audited FY2025 results); GWRS calendar year 2025; FY2026-27 adopted budget and assessments (April 15, 2026); preliminary data to August 2026; project status checked to November 18, 2026. All currency is US dollars.

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Systems Overview: Orange County Water District

Format
PDF
Length
14 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Water Utility Intelligence Report
Edition
November 2026, First edition
Format
PDF
Length
14 pages
Reference
OFW_EXT_WATER_SYSTEMS_OVERVIEW_ORANGE_COUNTY_WATER_DISTRICT_05c119062fef
Evidence current to
18 November 2026

14

Explore this report family

More Water Systems Overview reports

Explore the same report family covering other utilities.

Water Systems Overview: Metropolitan Water District of Southern California cover

Water Systems Overview: Metropolitan Water District of Southern California

An assessment of whether Metropolitan Water District of Southern California's imported supplies, aging aqueduct, distribution system and treatment plants, and its governance can carry the region through the supply and capital decisions due from 2027. Metropolitan's share of the Pure Water Southern California first stage alone, US$2,881 million, is about 2.8 times the US$1.025 billion Capital Investment Plan in its adopted budget, and only design is funded. The decision comes after debt service coverage fell to 1.14x in FY2024 before recovering to 2.45x in FY2025; water sales dropped 21.6% in a single year and new Colorado River reductions take effect in 2027.
Geography
Southern California, United States
Edition
November 2026, First edition
Length
13 pages
Explore report
Water Systems Overview: EYATH S.A. cover

Water Systems Overview: EYATH S.A.

An overview of whether Thessaloniki's water system, from its river, springs and boreholes to its plants, networks and governing institutions, can absorb the expansion that EYATH takes on by July 2027. Thessaloniki's main source reaches the city through one treatment plant that averaged 93.2% of its first-phase capacity in 2025, while its second phase has slipped to 2027. The system is run by a debt-free, state-controlled company whose tariffs are now fixed to 2029 under a €221.6 million approved investment plan, and which must take over two regional units by July 31, 2027.
Geography
Thessaloniki, Greece
Edition
November 2026 edition
Length
12 pages
Explore report
Water Systems Overview: Seattle Public Utilities cover

Water Systems Overview: Seattle Public Utilities

An assessment of whether Seattle Public Utilities' watersheds, treatment, network, institutions and finances can carry a larger capital program of seismic, storage, dam and overflow obligations through the 2030s. Seattle Public Utilities has supply to spare: water produced in 2025 averaged 126.7 MGD against a 172 MGD firm yield, and leakage fell to 4.5%. The pressure is capital: the Mayor's proposed 2027–2032 water program is about US$1,067 million, rates rise 4.3% a year from 2027, and the 2026 Official Statement expects US$553.2 million of new parity bonds over 2027–2031.
Geography
Seattle, Washington, United States
Edition
November 2026, First edition
Length
13 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.