Intelligence Reports/Water Utility Intelligence Report
Water Systems Overview: Seattle Public Utilities cover

Water Utility Intelligence Report

Water Systems Overview: Seattle Public Utilities

An assessment of whether Seattle Public Utilities' watersheds, treatment, network, institutions and finances can carry a larger capital program of seismic, storage, dam and overflow obligations through the 2030s. Seattle Public Utilities has supply to spare: water produced in 2025 averaged 126.7 MGD against a 172 MGD firm yield, and leakage fell to 4.5%. The pressure is capital: the Mayor's proposed 2027–2032 water program is about US$1,067 million, rates rise 4.3% a year from 2027, and the 2026 Official Statement expects US$553.2 million of new parity bonds over 2027–2031.

Geography
Seattle, Washington, United States
Evidence current to
16 November 2026
Format
PDF
Length
13 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

172 MGD: firm yield of the Cedar and South Fork Tolt supply (2019 Water System Plan, projection), against about 124 MGD of average daily delivery (2025–2030 Water CIP)

4.5%: distribution system leakage in 2025 (2,081 MG), with a three-year average of 5.2% against a 10% compliance threshold

US$974.3 million: adopted 2026–2031 Water CIP; the Mayor's proposed 2027–2032 program is about US$1,067 million and awaits Council adoption

4.3% a year: retail water rate increases adopted for 2027–2029 (Ordinance 127486, August 6, 2026)

02

Buyer relevance

Who the report is for

Engineering and construction firms

Size the storage, seismic and Tolt Dam work, including the US$90.2 million Bitter Lake Reservoir replacement now in construction.

Metering and data technology suppliers

Track where the advanced metering business case and the 8-meter wholesale pilot stand before any procurement.

Municipal bond investors and credit analysts

Compare SPU-reported coverage of 2.01x with Moody's 1.40x for 2025 against the 1.70x policy target as borrowing rises.

Wholesale customers and regional water planners

Follow the Operating Board, the 2026 wholesale rate study and the 2029 Tolt Dam license expiry that affect regional supply.

03

Decision scope

Questions answered

01

Does Seattle need new water supply?

Not on current plans: water produced in 2025 averaged 126.7 MGD, about 74% of the 172 MGD firm yield, and the 2019 Water System Plan expects no significant new sources for climate change until about 2060.

02

How large is the water capital program?

The adopted 2026–2031 Water CIP totals US$974.3 million; the Mayor's proposed 2027–2032 program is about US$1,067 million and awaits Council adoption.

03

How fast will water rates rise?

The Council adopted 4.3% a year for 2027–2029, and the median residential bill is projected to rise from US$50.71 in 2026 to US$59.26 in 2029.

04

How much water does the network lose?

Distribution system leakage was 4.5% (2,081 MG) in 2025, with a three-year average of 5.2% against a 10% compliance threshold.

05

Who runs the treatment plants?

Seattle Public Utilities took over the Tolt Treatment Facility on January 1, 2026; the May 2026 Water Official Statement confirms that Jacobs Solutions Inc. operates the 180 MGD Cedar Treatment Facility under a long-term contract.

04

Inside the report

Inside the complete report

Executive Overview

1. Water Resource Profile

2. Governance and Institutional Framework

3. Infrastructure and Service Delivery

Strategic Outlook and Opportunities

Source Register

05

Public preview

What to watch next

1. Water Resource Profile

The next Water System Plan and any revised demand forecast or climate horizon; Saving Water Partnership use against the 110 mgd goal through 2028; the Tolt Dam relicensing terms, which could carry new flow or habitat conditions.

2. Governance and Institutional Framework

Council adoption of the 2027 budget and 2027–2032 CIP; the outcome of the 2026 wholesale rate study; any withdrawals from the Revenue Stabilization Subfund; the next three-year Strategic Business Plan update, expected in 2027; Tolt Dam relicensing filings ahead of July 2029; Moody's view of the Drainage and Wastewater positive outlook as consent decree works near completion.

3. Infrastructure and Service Delivery

The advanced metering business case (bulk of work due by end of June 2026; status last confirmed February 2026) and any procurement; whether the Cedar contract follows the Tolt plant in-house; uptake of the widened Utility Discount Program from 2027; leakage in 2026 after the drop to 4.5% in 2025.

Strategic Outlook and Opportunities

Council adoption of the 2027–2032 CIP and the size of the 2027 water capital budget; the next water bond sale against the US$553.2 million projection; reported coverage against the 1.70x target; the Bitter Lake contract award; the advanced metering decision; court entry of the Lower Duwamish consent decree; any emissions inventory after 2021.

Sample page · page 7 of 13

Infrastructure and service delivery: treatment plants, network assets, leakage and water quality, 2019–2025.

Report page with tables of Seattle Public Utilities treatment facilities and network assets, distribution system leakage from 2019 to 2025, water quality results and the projected median residential water bill.

06

Included

What you receive

The complete PDF report: 13 pages, 6 sections, 13 tables and a register of 19 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

The report draws on Seattle's water and drainage revenue bond Official Statements (2021–2026), the audited 2025 Water Fund financial statements, the adopted and proposed capital improvement programs, drinking water quality and wastewater collection reports, rating agency reports from May 2026, City Council legislation and staff analysis, and Operating Board minutes.

Sources

19 sources, listed in the report's source register. Evidence current to 16 November 2026. Principal data periods: FY 2025 audited results (year ended December 31, 2025); 2021–2025 operating statistics from the 2026 Water Official Statement; calendar 2025 water quality data; capital programs and project status as published to September 2026 and re-checked on November 16, 2026. All currency is US dollars (US$)..

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Systems Overview: Seattle Public Utilities

Format
PDF
Length
13 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Water Utility Intelligence Report
Edition
November 2026, First edition
Format
PDF
Length
13 pages
Reference
OFW_EXT_WATER_SYSTEMS_OVERVIEW_SEATTLE_PUBLIC_UTILITIES_98adc53a5f61
Evidence current to
16 November 2026

14

Explore this report family

More Water Systems Overview reports

Explore the same report family covering other utilities.

Water Systems Overview: De Watergroep cover

Water Systems Overview: De Watergroep

An assessment of whether De Watergroep's sources, network, institutions and finances can deliver a climate-robust drinking water system across four Flemish provinces through 2030 and the planned 2032 asset merger with Farys. De Watergroep's water meets standard in about 99.8% of analyses, but its Infrastructure Leakage Index has fallen by only 0.08 since 2022, to 1.15 in 2025, against a target of 0.80 by end-2030. Net purchases over sales equal about 28% of the 174,012,068 m³ it made available in 2025, while key sources such as Kluizen and De Gavers are still being rebuilt.
Geography
West Flanders, East Flanders, Flemish Brabant and Limburg, Flanders, Belgium
Edition
November 2026, First edition
Length
12 pages
Explore report
Water Systems Overview: Philadelphia Water Department cover

Water Systems Overview: Philadelphia Water Department

An assessment of whether Philadelphia's two-river supply, three treatment plants, aging pipe networks and City-owned institutions can meet a regulatory calendar running to 2036. Philadelphia's plants have ample room: average distribution of 228.9 MGD in FY 2024 used about 42% of 546 MGD rated treatment capacity. The pressure sits in the networks, where non-revenue water rose to 103.2 MGD in FY 2023 from 92.4 mgd (41.7%) in the FY 2019 audited balance, and in a capital program stated as US$4,731.85 million by PWD and about US$6.4 billion by Moody's.
Geography
Philadelphia, Pennsylvania, United States
Edition
November 2026, First edition
Length
13 pages
Explore report
Water Systems Overview: San Francisco Public Utilities Commission cover

Water Systems Overview: San Francisco Public Utilities Commission

An overview of the water system served by the San Francisco Public Utilities Commission: its water resources, governance and institutions, infrastructure and service delivery, and its strategic outlook. SFPUC's regional water system depends on Hetch Hetchy Reservoir for up to 85% of deliveries to about 2.7 million people, while storage expansion and purified water supply have been canceled or deferred. In FY2025 it renewed 9.1 miles of water main against a 15-mile target, and its adopted US$12,559.0 million capital plan puts US$5,916.1 million into wastewater.
Geography
San Francisco, California, United States; regional wholesale supply in Alameda, Santa Clara and San Mateo counties
Edition
November 2026, First edition
Length
11 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.