Intelligence Reports/Water Utility Intelligence Report
Water Systems Overview: San Diego County Water Authority cover

Water Utility Intelligence Report

Water Systems Overview: San Diego County Water Authority

An assessment of whether San Diego County Water Authority's supplies, institutions and regional conveyance system still fit a region where the Authority's own supplies fell 40.3% between FY 2016 and FY 2025. The Water Authority's own supplies fell 40.3% between FY 2016 and FY 2025, to 291,721 acre-feet, while conserved Colorado River water rose to 68.7% of them and the melded supply rate rose 75.0% to US$1,855 per treated acre-foot. Its 2025 plan projects a normal-year surplus of 16,333 acre-feet a year in 2030, which the Authority began selling in 2026 as S&P cut its senior lien rating to AA.

Geography
San Diego County, California, United States
Evidence current to
21 November 2026
Format
PDF
Length
15 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

291,721 acre-feet: Water Authority sources of supply in FY 2025, against 488,618 acre-feet in FY 2016

US$1,855: melded supply rate per treated acre-foot in calendar 2025, against US$1,060 in calendar 2016 (up 75.0%, calculated)

16,333 acre-feet a year: projected normal-year supply surplus in 2030, rising to 51,805 acre-feet a year in 2050 (2025 Urban Water Management Plan, projection)

AA: S&P Global Ratings' senior lien rating after a two-notch cut from AAA on August 19, 2026, titled "On Member Credit Quality"

02

Buyer relevance

Who the report is for

Member agency managers and boards

Compare the Authority's falling supply volumes and 75.0% rise in the melded supply rate with the 3% rate path expected through 2032.

Municipal bond investors and analysts

Read the ten-year debt, revenue and coverage series beside S&P's August 19, 2026 downgrade and the US$285 million Series 2026A bonds.

Colorado River and Southern California water agencies

Assess the Western and Eastern Municipal Water District sales and the interstate pilot as signals of how much surplus San Diego can offer.

Engineering and relining contractors

See the scale of the 308-mile system and the relining and aqueduct renewal work under way through summer 2027.

03

Decision scope

Questions answered

01

How much water does the Water Authority now supply?

291,721 acre-feet in FY 2025, against 488,618 acre-feet in FY 2016, a fall of 40.3%.

02

How dependent is it on the Quantification Settlement Agreement?

Conserved Colorado River water under the agreement was 68.7% of the Authority's FY 2025 supplies, up from 36.7% in FY 2016.

03

Does the region have enough water?

The 2025 Urban Water Management Plan projects a normal-year surplus of 16,333 acre-feet a year in 2030 and 51,805 acre-feet a year in 2050.

04

What has happened to its credit rating?

S&P cut the senior lien rating two notches to AA from AAA on August 19, 2026; Moody's rated the Authority Aa2 stable in January 2026.

04

Inside the report

Inside the complete report

Executive Overview

1. Water Resource Profile

2. Governance and Institutional Framework

3. Infrastructure and Service Delivery

Strategic Outlook and Opportunities

Source Register

05

Public preview

What to watch next

1. Water Resource Profile

The FY 2026 Annual Comprehensive Financial Report's supply table, to see whether total supplies keep falling; how the interstate pilot is built into the new Colorado River operating rules; any multiple-dry-year revision to the 2025 plan's surplus.

2. Governance and Institutional Framework

The Board's calendar 2028 rate decision against the expected 3% path; Rate Stabilization Fund balances against Board policy in the FY 2026 audited report; any further rating action by Moody's or Fitch following S&P.

3. Infrastructure and Service Delivery

Confirmation that the Southern First Aqueduct work is complete; progress of Pipeline 5 toward summer 2027; the next relining contracts in the Asset Management Program; any reported change in the price of Carlsbad water after the intake upgrade.

Strategic Outlook and Opportunities

The interstate pilot's volumes, price and federal approval; delivery start dates and actual revenue under the Western and Eastern agreements; the start of purified water deliveries from Pure Water San Diego Phase 1; the Board's adoption of the next multi-year budget and capital program; a licensing decision on San Vicente Energy Storage.

Sample page · page 7 of 15

Wholesale rate decisions, audited financial indicators, Moody's coverage measures and senior lien credit ratings.

Report page with tables of San Diego County Water Authority wholesale rate decisions, operating revenues, long-term debt, debt service coverage and credit ratings.

06

Included

What you receive

The complete PDF report: 15 pages, 6 sections, 16 tables and a register of 29 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

The report draws on the Water Authority's audited Annual Comprehensive Financial Reports and their ten-year statistical tables, its 2025 Urban Water Management Plan, 2024 Water Facilities Master Plan and 2024 Climate Action Plan, and Board rate decisions. Credit rating reports from Moody's and S&P, City of San Diego releases and press reports on 2026 water sales, bonds and projects complete the picture.

Sources

29 sources, listed in the report's source register. Evidence current to 21 November 2026. Principal data periods: FY 2025 audited results and ten-year statistical tables FY 2016–FY 2025 (fiscal years end June 30); 2025 Urban Water Management Plan (June 2026) with projections to 2050; calendar 2025 and 2027 wholesale rates; project, credit and contract status checked on November 21, 2026. All currency is US dollars (US$).

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Systems Overview: San Diego County Water Authority

Format
PDF
Length
15 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Water Utility Intelligence Report
Edition
November 2026, First edition
Format
PDF
Length
15 pages
Reference
OFW_EXT_WATER_SYSTEMS_OVERVIEW_SAN_DIEGO_COUNTY_WATER_AUTHORITY_f816b3e93330
Evidence current to
21 November 2026

14

Explore this report family

More Water Systems Overview reports

Explore the same report family covering other utilities.

Water Systems Overview: Orange County Water District cover

Water Systems Overview: Orange County Water District

An assessment of how the Orange County Water District keeps northern Orange County's groundwater basin full, safe and funded, from recharge sources and governance to the GWRS and PFAS treatment. The basin's accumulated overdraft rose from 133,000 af to 183,000 af in the dry 2024-25 water year, while PFAS treatment has returned 55 wells to service against more than 100 impacted. Replenishment Assessment revenue of US$206.4 million made up about 96.8% of FY2025 operating revenues.
Geography
Orange County Groundwater Basin, California
Edition
November 2026, First edition
Length
14 pages
Explore report
Water Systems Overview: Metropolitan Water District of Southern California cover

Water Systems Overview: Metropolitan Water District of Southern California

An assessment of whether Metropolitan Water District of Southern California's imported supplies, aging aqueduct, distribution system and treatment plants, and its governance can carry the region through the supply and capital decisions due from 2027. Metropolitan's share of the Pure Water Southern California first stage alone, US$2,881 million, is about 2.8 times the US$1.025 billion Capital Investment Plan in its adopted budget, and only design is funded. The decision comes after debt service coverage fell to 1.14x in FY2024 before recovering to 2.45x in FY2025; water sales dropped 21.6% in a single year and new Colorado River reductions take effect in 2027.
Geography
Southern California, United States
Edition
November 2026, First edition
Length
13 pages
Explore report
Water Systems Overview: EYATH S.A. cover

Water Systems Overview: EYATH S.A.

An overview of whether Thessaloniki's water system, from its river, springs and boreholes to its plants, networks and governing institutions, can absorb the expansion that EYATH takes on by July 2027. Thessaloniki's main source reaches the city through one treatment plant that averaged 93.2% of its first-phase capacity in 2025, while its second phase has slipped to 2027. The system is run by a debt-free, state-controlled company whose tariffs are now fixed to 2029 under a €221.6 million approved investment plan, and which must take over two regional units by July 31, 2027.
Geography
Thessaloniki, Greece
Edition
November 2026 edition
Length
12 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.