Intelligence Reports/Utility Account Brief
Seattle Public Utilities: Utility Account Brief cover

Utility Account Brief

Seattle Public Utilities: Utility Account Brief

An assessment of where Seattle Public Utilities will spend on water and drainage over 2027–2032, how its contracts are bought, and which suppliers are best placed to win them. Seattle Public Utilities' own May 2026 contract list names on-call consultant pools of US$20 million and US$30 million and a US$200 million Lower Duwamish construction contract. Behind them sit a proposed 2027–2032 Water CIP of about US$1,067 million and a Drainage and Wastewater CIP of US$2,344.3 million, neither adopted by November 16, 2026.

Geography
Seattle, Washington, United States
Evidence current to
16 November 2026
Format
PDF
Length
11 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

US$974.3 million: adopted 2026–2031 Water CIP; the Mayor's proposed 2027–2032 Water CIP is about US$1,067 million and awaits Council adoption

US$2,344.3 million: proposed 2027–2032 Drainage and Wastewater CIP, up from US$2,181.9 million adopted for 2026–2031 (a separate fund)

US$337.6 million: Water Fund operating revenues in FY 2025; the Drainage and Wastewater Fund reported US$610.8 million

Aaa / AA+: Water System revenue bond ratings, both stable; Drainage and Wastewater is Aa1 (positive outlook) and AA+ (May 2026)

02

Buyer relevance

Who the report is for

Engineering and design consultants

Prepare for the US$20 million and US$30 million on-call pools and the US$10 million-plus water main design pool on SPU's list.

Water main and civil contractors

Target water main renewal packages such as Package 5B (US$4.7 million) through the OpenGov portal and the Small Works Roster below US$350,000.

Remediation and marine contractors

Track the Lower Duwamish consent decree and the US$200 million Middle Reach construction contract listed for Q4 2027.

Water products and metering suppliers

Follow SPU's blanket contracts for small multijet meters, water works products and clay pipe, and the advanced metering business case.

03

Decision scope

Questions answered

01

How much will Seattle Public Utilities spend on capital?

The proposed 2027–2032 Water CIP is about US$1,067 million and the Drainage and Wastewater CIP US$2,344.3 million; neither had been adopted by November 16, 2026.

02

How do suppliers bid?

City solicitations are posted on the OpenGov procurement portal; construction of US$350,000 or less uses the Small Works Roster and consultant work of US$420,000 or less can use the Consultant Roster.

03

What contracts are coming up?

SPU's May 2026 list includes on-call pools of US$20 million and US$30 million, Water Main Rehabilitation Package 5B at US$4.7 million and a US$200 million Lower Duwamish Middle Reach contract for Q4 2027.

04

Is SPU financially strong?

Water bonds are rated Aaa by Moody's and AA+ by S&P; SPU-reported water coverage was 2.01x in 2025 against a 1.70x policy target.

05

Is advanced metering being procured?

No procurement or award had been announced by November 16, 2026. As of February 2026, SPU was preparing a business case, due mainly by the end of June 2026, and piloting AMI on 8 wholesale meters.

04

Inside the report

Inside the complete report

1. The Account at a Glance

2. Organisation and Decision-Making

3. Financial Position

4. Priorities and Pressures

5. How Seattle Public Utilities Buys

6. Opportunity Register

7. Commercial Priorities: Where to Focus First

8. Watch List: What to Monitor and What to Do

Source Register

05

Public preview

What to watch next

Council vote on the 2027–2028 budget and 2027–2032 CIP

Funds the proposed water and drainage programs.

SPU's upcoming contract list

Gives estimates and advertisement dates months ahead.

Lower Duwamish consent decree entry

The cleanup, including the US$200 million Middle Reach contract listed for Q4 2027, is to proceed under it.

Next water bond sale

US$553.2 million of future parity bonds expected over 2027–2031.

Sample page · page 6 of 11

The Opportunity Register: upcoming SPU contracts with estimates, timing, supplier categories and routes in.

Report page showing who holds Seattle Public Utilities' major work and the start of the Opportunity Register table, with status, estimate, timing and access route for each project.

06

Included

What you receive

The complete PDF report: 11 pages, 9 sections, 6 tables and a register of 19 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

The brief draws on Seattle's water and drainage revenue bond Official Statements and audited 2025 fund statements, the adopted and proposed capital improvement programs, SPU's upcoming contract list and project sheets, City Purchasing and Contracting rules, City Council legislation and staff analysis, rating agency reports and EPA notices.

Sources

19 sources, listed in the report's source register. Evidence current to 16 November 2026. Principal data periods: FY 2025 audited results (year ended December 31, 2025); 2026–2031 adopted and 2027–2032 proposed capital programs; SPU's upcoming contract list (last updated May 2026). Project, procurement and legal status checked against public sources on November 16, 2026. All currency is US dollars (US$)..

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Seattle Public Utilities: Utility Account Brief

Format
PDF
Length
11 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Utility Account Brief
Edition
November 2026, First edition
Format
PDF
Length
11 pages
Reference
OFW_EXT_SEATTLE_PUBLIC_UTILITIES_UTILITY_ACCOUNT_BRIEF_af5fd5ff1934
Evidence current to
16 November 2026

14

Explore this report family

More Utility Account Briefs

Explore the same report family covering other utilities.

De Watergroep: Utility Account Brief cover

De Watergroep: Utility Account Brief

A supplier's guide to where De Watergroep spends, how it buys under EU utilities rules and through Waterunie Operator, who holds major work, and which programmes to pursue first. De Watergroep spent €162.165 million on mains in 2025, up from €141.475 million, with a €350 million European Investment Bank loan fully signed for its 2023–2028 programme. A joint meter framework estimated at €198,619,000 closed for bids on 7 April 2026, and from 2026 Waterunie Operator runs operations for De Watergroep and Farys.
Geography
West Flanders, East Flanders, Flemish Brabant and Limburg, Flanders, Belgium
Edition
November 2026, First edition
Length
11 pages
Explore report
Philadelphia Water Department: Utility Account Brief cover

Philadelphia Water Department: Utility Account Brief

An assessment of where Philadelphia Water Department will spend on its capital program, how it buys, who already holds its major contracts and which projects suppliers should pursue first. PWD's proposed capital program for FY 2026 to FY 2031 totals US$4,731.85 million, against about US$6.4 billion reported by Moody's, with replacement and rehabilitation at 80%. The City's Fall 2026 forecast already names PWD plant contracts for 2027, including the Lardner's Point pumping station and a sixth sedimentation tank, each estimated at more than US$10m.
Geography
Philadelphia, Pennsylvania, United States
Edition
November 2026, First edition
Length
11 pages
Explore report
Vitens: Utility Account Brief cover

Vitens: Utility Account Brief

A supplier's guide to Vitens: how it is organised and makes decisions, its financial position and priorities, how it buys, and the opportunities to target first. Vitens's net investment reached €341.5 million in 2025, up 93% since 2021, and its 2026 tenders include a €7.2 million pump framework and cleaning for about 350 technical sites. Its own 2025 annual report warns of insufficient investment room and plans to phase the investment programme, while objection procedures slow the new source capacity it needs.
Geography
Netherlands
Edition
November 2026, First edition
Length
12 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.