HAMBURG WASSER

Hamburg, Germany

Hamburg’s city-owned water and wastewater group, supplying around 2.3 million people from groundwater while turning its treatment plant into an energy and resource-recovery hub.

Water & wastewater · City-owned water and wastewater group · 2026 edition · Latest evidence FY 2025 (annual report and environmental statement); population supplied 2024; Green Finance allocation as at 31 December 2025

At a glance

Scale, service and financial position

around 2.3 millionPeople supplied with drinking water2024
117.4m m³Drinking water delivered to customers2025 (2024: 115.7m m³)
5,334 kmDrinking-water mains network2025
156.5m m³Wastewater treated2025 (2024: 183.4m m³)
6,201 kmSewer network2025
€701,579,822Group revenueFY 2025 (FY 2024: €673,468,881)

01

About the Utility

HAMBURG WASSER brings together two companies that stand side by side under unified management: Hamburger Wasserwerke GmbH, which supplies drinking water, and Hamburger Stadtentwässerung AöR, which collects and treats wastewater. The Free and Hanseatic City of Hamburg owns 100 percent of both, holding the waterworks company through its municipal holding HGV and the wastewater institution directly under the Stadtentwässerungsgesetz. The group supplied around 2.3 million people with drinking water in 2024. Its subsidiary CONSULAQUA carries operator expertise abroad, and the group holds half of Holsteiner Wasser. An externally verified EMAS environmental management system has been validated every year since 2008.

02

Water System

Hamburg’s drinking water comes exclusively from groundwater, abstracted at depths between 20 and 429 metres and treated at 16 waterworks. Rather than build new works, the company is raising maximum daily output to 500,000 cubic metres within existing plants, including new filters installed at Stellingen during operation. Securing abstraction rights is the sharper constraint. The Nordheide wellfields supply around 300,000 residents, yet only a weaker, more easily revoked “gehobene Erlaubnis” was granted, and the appeal still awaits a hearing. Network losses remain low, and PFAS results sit below both current and forthcoming drinking-water limits.

3.8%Calculated water loss2025 (2024: 3.6%)
111.0 litresConsumption per inhabitant per day2025 · statistical-office method
€1.99/m³Drinking-water price2025 (2024: €1.95)
500,000 m³/dayPlanned maximum daily waterworks output (from around 460,000)Plan · within existing works

03

Wastewater System

Hamburger Stadtentwässerung runs the sewer network and four treatment plants, led by Klärwerk Hamburg, which met every condition of its discharge permit in 2025. Treated volumes follow the weather: after a record-wet hydrological year with repeated extreme cloudbursts, they fell back sharply in 2025. Combined sewer overflows are a recurring pressure, with 49 of 131 outfalls operating in 2025. The plant generates more electricity than it consumes, and the company has welcomed the recast EU directive that makes manufacturers of problem substances share responsibility for removing them.

559,739 m³Diluted combined wastewater discharged from 49 of 131 combined sewer overflows (around)2025
about 121%Klärwerk Hamburg electricity self-generation ratio2025

Treated wastewater discharged

Klärwerk Hamburg, calendar years 2016–2025, as reported in the EMAS environmental statements

million m³
Treated wastewater discharged: 2016, 157.7 million m³, actual; 2017, 169.9 million m³, actual; 2018, 158.7 million m³, actual; 2019, 151.4 million m³, actual; 2020, 146.3 million m³, actual; 2021, 147.3 million m³, actual; 2022, 153.4 million m³, actual; 2023, 169.8 million m³, actual; 2024, 183.4 million m³, actual; 2025, 156.5 million m³, actual050100150200157.72016169.92017158.72018151.42019146.32020147.32021153.42022169.82023183.42024156.52025
Actual

All values are reported actuals on one measure and basis. Year-to-year swings largely reflect rainfall: 2024 was a record-wet hydrological year.

Sources: HAMBURG WASSER, EMAS Umwelterklärungen 2016–2023 and 2025.

04

Investment & Priorities

Capital spending rose at the water company and eased slightly at the wastewater company in 2025, with sludge incineration, energy recovery and waterworks capacity among the priorities. Financing is moving onto a green footing. A Green Finance Framework adopted in June 2024 underpinned a first green loan with UniCredit in July 2025, and a €70 million green Schuldschein loan has been allocated in full to the VERA II sludge-incineration project. Wastewater fees and water prices both rose in 2025.

€85.2mInvestment, water companyFY 2025 (FY 2024: €61.9m)
€142.6mInvestment, wastewater companyFY 2025 (FY 2024: €149.1m)
€297mVERA II total project volume (€70m green loan allocated)As at 31 December 2025

05

Sustainability & Resilience

HAMBURG WASSER aims to supply itself entirely with renewable electricity by 2030 and already covers most of its energy use from renewable sources. Its treatment plant is becoming a resource-recovery site, with the VERA II sludge-incineration line, the HPHOR phosphorus-recovery plant and Germany’s largest wastewater heat pump. With the environment authority, it runs the RISA sponge-city initiative and produced Hamburg’s heavy-rainfall hazard map, as extreme weather becomes more frequent. The work earned the German Sustainability Award 2025 in the water-supply category.

93%Share of energy consumption covered by renewable energy2025
30,420 t CO₂eScope 1 process emissions (excluding biogenic CO₂)2025
27,460 t CO₂eScope 2 emissions, purchased energy (German grid factor)2025

06

Key Challenges

  1. Securing long-term groundwater abstraction rights, including the contested Nordheide permit.
  2. Raising waterworks output to 500,000 cubic metres a day without building new works.
  3. Managing combined sewer overflows and stormwater as extreme rainfall becomes more frequent.
  4. Delivering VERA II and phosphorus recovery before the 2029 sludge and phosphorus rules apply.
  5. Reaching full renewable electricity self-supply by 2030.

07

Major Projects

VERA II sludge incineration

Adds a fourth incineration line, raising dry-sludge throughput ahead of the 2029 limits on agricultural spreading.

Status / period
Construction halfway in July 2025; stepwise commissioning planned from 2027
Investment / capacity
63,000 → 76,000 t dry sludge/year · €297m total project volume

Dradenau wastewater heat pump

Germany’s largest wastewater heat pump, built with Hamburger Energiewerke to feed district heating from treated effluent.

Status / period
Under construction; planned start 2026
Investment / capacity
60 MW thermal · up to 39,000 households

HPHOR phosphorus recovery

Recovers phosphoric acid at the Hamburg treatment plant with the TetraPhos process, ahead of 2029 phosphorus-recycling rules.

Status / period
Trial operation
Investment / capacity
Described as the world’s first large-scale plant of its kind

Evidence

Sources and reporting periods

This Snapshot draws on HAMBURG WASSER annual reports and EMAS environmental statements, its 2025 Green Finance allocation report, company press releases and project pages, drinking-water quality notices and City of Hamburg ownership and climate-adaptation material.

Evidence through: 2026-10-0538 source documents