Water Utility IntelligencePUB, Singapore's National Water Agency

Free Utility Snapshot

PUB, Singapore's National Water Agency

Singapore (national service area)

Singapore’s national water agency, running supply, NEWater, used water and drainage as one system while building deep-tunnel sewerage and coastal defences for growing demand.

At a glance

Scale, service and financial position

7.1%Distribution losses2024 · actual
142 litres/dayPer capita household water consumption2024 · actual
148.3 million m³NEWater sales2024 · actual
303.9 million m³Potable water sales, domestic (non-domestic 213.7 million m³)2024 · actual
$1,560,012 thousandGroup operating income (operating expenses $1,875,556 thousand)FY2024 · actual
237.9 ktCO₂eScope 1 and 2 emissions2024 · actual

01

About the Utility

PUB, Singapore’s National Water Agency, is a Singapore Government agency that acts as both the country’s water services provider and its water regulatory authority. Its operations span potable water, NEWater and used water, and it also carries drainage and coastal protection, partly funded through the Government’s Coastal and Flood Protection Fund. Public funding is built into the model: in FY2024 PUB reported government operating grants of $488,696 thousand alongside a net operating loss of $315,544 thousand, and its capital expenditure combines PUB-funded and government-funded spending. Long-term planning traces back to the 1972 Water Master Plan, the blueprint for developing Singapore’s water resources.

02

Water System

Singapore’s supply combines local catchments with climate-resilient sources such as desalinated water and NEWater. Its first reservoirs, MacRitchie, Peirce and Seletar, lie in protected catchments closed to major development, and the wider stormwater network comprises 17 reservoirs and more than 8,000 km of canals and drains. PUB has stated that desalination would meet up to 30% of future water needs by 2060. Demand is projected to almost double by 2065, with non-domestic users taking a growing share. On the network, distribution losses fell to 7.1% in 2024, and every drinking-water test met WHO Guidelines and national regulations from FY2015 to FY2024.

130 litres/dayHousehold water consumption target per personTarget · by 2030
1,200Permanent leak detection sensors (about 40% of transmission pipelines)FY2021
100%Drinking-water tests meeting WHO Guidelines and EPH regulationsEvery year FY2015–FY2024

Distribution losses

PUB potable water distribution losses, %, 2019 to 2024 (years as labelled in PUB's ten-year statistical table)

%
Distribution losses: 2019, 8.2 %, actual; 2020, 8.0 %, actual; 2021, 8.2 %, actual; 2022, 7.5 %, actual; 2023, 7.2 %, actual; 2024, 7.1 %, actual05108.220198.020208.220217.520227.220237.12024
Actual

Reported actuals. Distribution Losses replaced the earlier Unaccounted for Water indicator from 2019, so earlier years are not comparable and are not shown.

Sources: PUB Annual and Sustainability Report 2024/25, ten-year statistical table; 2019–2020 also in PUB Annual Report 2020/21.

03

Wastewater System

Used water is a core PUB operation alongside potable water and NEWater. The first phase of the Deep Tunnel Sewerage System, completed in 2008, combined a 48km deep tunnel from Kranji to Changi with 60km of link sewers and Changi Water Reclamation Plant. Changi’s expansion, commissioned progressively since 2024, raises treatment capacity from 202 to 246 million gallons per day. The system’s second phase repeats the model with deep tunnels, link sewers and a Tuas plant that includes NEWater treatment. Tuas is integrated with NEA’s Integrated Waste Management Facility and designed to be energy-self-sufficient.

176 MGDTuas plant initial used water treatment capacity (plus 25 MGD NEWater)Design capacity
$3.4 billionCost of Deep Tunnel Sewerage System first phase, including Changi plantCompleted 2008 · actual

04

Investment & Priorities

PUB’s capital expenditure combines PUB-funded and government-funded spending. The Deep Tunnel Sewerage System’s second phase was about 83% complete at the end of May 2026, with the tunnels finished and Tuas Water Reclamation Plant scheduled for progressive commissioning from 2027. PUB has issued two green bonds totalling $1.125 billion, and its borrowings consist of unsecured fixed-rate bonds. Coastal and drainage works draw on the Coastal and Flood Protection Fund, created in 2020 with an initial $5 billion.

$1,137.8 millionGroup capital expenditure (prior year $1,596.6 million)FY2020/21 · actual
$2,025,000 thousandBorrowings (unsecured fixed-rate bonds)FY2024 · actual
86%Link sewer works completed, Deep Tunnel Sewerage System second phaseAs at 31 May 2026 · status

05

Sustainability & Resilience

Climate pressure reaches PUB through both energy and the coast. Greater reliance on desalinated water and NEWater means its energy and emissions footprint could quadruple by 2065. PUB has deployed floating solar and plans to expand rooftop solar by 2030. Demand policy is also tightening: since January 2024, selected water-intensive industries must meet mandatory recycling requirements. Along the coast of a low-lying island, City-East Coast protection moves to design, with construction planned in the 2030s, while ‘Long Island’ is the proposed defence for the East Coast.

63 MWpFloating solar deployed (rooftop solar planned to rise from 4MWp to an estimated 16MWp by 2030)FY2024/25 report · actual and plan
167.4 GWhRenewable energy consumption (non-renewable electricity 559.2 GWh)2024 · actual
50%Minimum water recycling rate for new large wafer-fabrication water usersSince January 2024 · requirement

06

Key Challenges

  1. Completing the Deep Tunnel Sewerage System’s second phase and commissioning Tuas Water Reclamation Plant from 2027.
  2. Meeting demand projected to almost double by 2065 while moving household use towards the 2030 target.
  3. Containing an energy and emissions footprint that could quadruple as desalination and NEWater grow.
  4. Protecting low-lying coasts from sea-level rise through long-term coastal investment.

07

Major Projects

Deep Tunnel Sewerage System Phase 2

Deep tunnels, link sewers and the Tuas Water Reclamation Plant with NEWater treatment, integrated with NEA’s waste facility.

Status / period
Under construction · about 83% complete (31 May 2026); Tuas commissioning from 2027
Investment / capacity
Tuas plant 176 MGD initial capacity

Changi Water Reclamation Plant Phase 2 Expansion

A fifth treatment train, separate wet weather facility and membrane bioreactor technology at the deep-tunnel system’s first plant.

Status / period
Progressively commissioned since 2024
Investment / capacity
202 to 246 mgd

City-East Coast Coastal Protection

Coastal protection measures moving from a concluded site-specific study into preliminary and detailed design.

Status / period
Design · construction planned in the 2030s

Evidence

Sources and reporting periods

This Snapshot draws on PUB’s annual and sustainability reports from FY2016/17 to FY2024/25, Deep Tunnel Sewerage System project updates to May 2026, green bond reports, water-planning and coastal-protection publications, and Singapore Government policy sources.

Evidence through: 2026-09-2322 source documents

Report library

Reports on PUB, Singapore's National Water Agency

6 reports available for purchase

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.