Scale, service and financial position

R22.9 billionRevenue (5.07% increase)FY2025 (year ended 30 June 2025) · actual
4,574 ML/dayAverage daily supplyFY2025 · actual
5,161 ML/dayPeak day demandFY2025 · actual
18+ millionPeople in the four provinces servedAs published, FY2025 report
99.96%Acute health microbiological compliance (SANS 241)FY2025 · actual
3,500+ kmLarge-diameter pipeline (60 service reservoirs)As published, FY2025 report

01

About the Utility

Rand Water is a state-owned water board, accountable as a public entity under the Public Finance Management Act, that treats and conveys potable water for municipalities, mines and industries across Gauteng and parts of Mpumalanga, the Free State and North West. Its latest integrated report lists 17 municipalities, 27 mines and 952 industries among its customers, in areas home to more than 18 million people. It draws raw water from the Integrated Vaal River System under abstraction limits set by the Department of Water and Sanitation and delivers it into municipal networks. Through Rand Water Services it also works in Emfuleni, where it has been the department’s implementing agent since 2021.

02

Water System

Supply depends on the Integrated Vaal River System, a network of interconnected dams that includes Katse and Mohale in Lesotho. The system was almost full in late January 2026, yet supply stays tight because Rand Water already abstracts at its permitted limit and peak demand sits close to, and at times above, available supply. When equipment failures and a heatwave drained municipal reservoirs, the minister allowed a temporary increase from 1,803 to 2,003 million m³ a year for February to June 2026, calling it no long-term solution. Treatment combines lime and ferric chloride dosing, sedimentation, pH correction, sand filtration and chlorination.

1,803 → 2,003 million m³/yearTemporary abstraction increase from the Integrated Vaal River SystemFebruary–June 2026 · temporary
99.6%Integrated Vaal River System storage28 January 2026

Average volumes sold

Rand Water average potable volumes sold, ML/d, FY 2020 to FY 2025 (years ending 30 June)

ML/d
Average volumes sold: FY 2020, 4,535 ML/d, actual; FY 2021, 4,588 ML/d, actual; FY 2022, 4,642 ML/d, actual; FY 2023, 4,717 ML/d, actual; FY 2024, 4,765 ML/d, actual; FY 2025, 4,761 ML/d, actual4,4004,6004,8005,0004,535FY 20204,588FY 20214,642FY 20224,717FY 20234,765FY 20244,761FY 2025
Actual

Reported averages. Growth stalled in FY 2025 while the system runs near its Vaal abstraction allocation.

Sources: Rand Water integrated annual reports FY 2020-FY 2025, as verified in the approved Utility Intelligence Profile: Rand Water (independent QA PASS, 31 Oct 2026)

03

Infrastructure & Performance

Rand Water’s assets are built for large-scale treatment and conveyance. More than 3,500 km of large-diameter pipelines feed 60 service reservoirs, and the B16 tie-in to that network was delivered ahead of schedule. The flagship addition is Station 5A at Zuikerbosch, near Vereeniging, launched by President Ramaphosa in August 2025 to add 600 ML/day; full capacity was scheduled for December 2025. On its own system, Rand Water reports low avoidable water losses and near-complete acute-health microbiological compliance. Downstream, the department and Rand Water blame shortages on municipal infrastructure failures and leakage rather than drought.

4.37%Avoidable non-revenue water (4.84% in 2024)2025 · actual
600 ML/dayStation 5A treatment capacity addedLaunched August 2025; full capacity scheduled December 2025

04

Investment & Priorities

Rand Water’s infrastructure plan to Parliament confirmed a R35 billion five-year capital programme for storage and treatment capacity, and a further 450 ML/day treatment upgrade is planned by 2028. Actual capital spending in FY2025 included R1.22 billion on augmentation and R0.74 billion on renewal. Funding draws on capital markets: R3.2 billion of unsecured bonds are in issue under its domestic note programme, and its 2021 sustainability-linked notes were reported as the first issued by an African state-owned entity.

R35 billionFive-year capital programmeConfirmed September 2023 · plan
R1.22 billionCapital expenditure on augmentation (R0.74 billion on renewal)FY2025 · actual
R3.2 billionUnsecured bonds in issue under the R10 billion DMTN ProgrammeAs reported for FY2025

05

Sustainability & Resilience

Long-term resilience rests on Phase II of the Lesotho Highlands Water Project, which official statements describe as the structural answer to Gauteng’s supply ceiling. Rand Water’s annual report targeted completion in October 2028, and the minister has ruled out further extensions. A ministerial update in September 2026 expected Polihali reservoir impoundment to begin in July 2027. Nearer term, it depends on municipal customers, whose arrears, illegal connections and leakage strain revenue and supply, and on energy security, one of Rand Water’s four strategic goals.

490 Mm³/yearAdditional transfer from Lesotho Highlands Phase II (780 → 1,270 Mm³/year)On completion · plan
Over R8 billionMunicipal debt owed to Rand Water (R1.5 billion in 2014/15)Q3 2024/25
2,126,882 tonnesCarbon footprint from electricityFY2025 · actual

06

Key Challenges

  1. Delivering Lesotho Highlands Phase II on its 2028 timetable as demand presses against the abstraction limit.
  2. Maintaining supply through equipment failures and heatwave peaks near full capacity.
  3. Recovering municipal arrears, over R8 billion by Q3 2024/25, without slowing capital delivery.
  4. Supporting municipalities to cut leakage and illegal connections.

Evidence

Sources and reporting periods

This Snapshot draws on Rand Water’s 2025 integrated annual report, its infrastructure plan to Parliament, ministerial and departmental statements, Lesotho Highlands project disclosures, parliamentary committee records and Auditor-General reports, with one dated status update.

Research evidence through: 2026-10-1116 Sources cited

Report library

Reports on Rand Water

5 reports available for purchase

Rand Water: Utility Account Brief cover

Utility account

Rand Water: Utility Account Brief

Rand Water plans R41.1 billion of capital spending over 2026–2030, peaking at R12,164 million in 2029, after spending R1.98 billion in FY 2025. The brief sets out who decides, how Rand Water buys, which programmes are open, awarded or emerging, and where suppliers should focus first, with delivery capacity rather than funding as the main constraint.
Edition
October 2026, First edition
Price
USD 499
Explore report →
Utility Intelligence Profile: Rand Water cover

Utility profile

Utility Intelligence Profile: Rand Water

A reference profile of Rand Water, South Africa's largest bulk water utility, covering its mandate, resources, treatment and network assets, finances, capital plan, tariffs, energy, governance and the developments scheduled to 2030. It finds a financially strong utility whose supply growth, cash collection and reliability are constrained by its abstraction allocation, municipal arrears and power supply.
Edition
October 2026, First edition
Price
USD 99
Explore report →
Water Systems Overview: Rand Water cover

Water system overview

Water Systems Overview: Rand Water

Gauteng's water system has a full resource tier, a well-performing bulk tier and a failing municipal tier. The report maps the Integrated Vaal River System, the institutions that run each link of the chain and Rand Water's infrastructure and service record, and sets out what Lesotho Highlands Phase II, institutional reform and a R41.1 billion capital plan mean for the system to 2030.
Edition
October 2026, First edition
Price
USD 499
Explore report →
Water Utility of the Future: Rand Water cover

Utility transformation

Water Utility of the Future: Rand Water

Rand Water's limits on reliable supply now sit outside its own plants: a raw water allocation capped at 1,803 million m³ a year until Lesotho Highlands Phase II delivers, electricity failures, and municipalities drawing above their allocations. The report examines how Rand Water is responding as a system operator, and whether it can deliver a R41.1 billion capital plan for 2026–2030 after spending R1.98 billion in FY 2025.
Edition
October 2026, First edition
Price
USD 499
Explore report →

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.