Free Utility Snapshot

Scottish Water

Scotland

Public water and wastewater utility serving households and businesses across Scotland.

Water & wastewater · Public utility · Latest evidence FY2025/26

At a glance

Scale, service and financial position

5.4mPeople served
30,626 milesWater pipe networkFY2024/25 scale disclosure
34,299 milesSewer pipe networkFY2024/25 scale disclosure
1.48bn L/dayWater suppliedFY2024/25 scale disclosure
£1.738bnRegulated-company revenueFY2025/26
2.67mHouseholds servedFY2024/25 scale disclosure

01

About the Utility

Scottish Water is Scotland’s publicly owned water and wastewater utility. Created under the Water Industry (Scotland) Act 2002, it is a Crown body owned by Scottish Ministers and regulated economically by the Water Industry Commission for Scotland. It serves about 5.4 million people, 2.67 million households and more than 160,000 business premises across a geographically dispersed territory. The system includes urban networks, remote rural assets, reservoirs, treatment works and extensive catchment land. Scottish Water’s mandate covers drinking-water production and distribution, wastewater collection and treatment, environmental performance and long-term infrastructure resilience. Its public ownership model removes shareholder dividends but ties the pace and scale of investment closely to regulated charges and Scottish Government borrowing.

02

Water System

Scottish Water operates 227 water treatment works, more than 1,200 treated-water storage tanks and 30,626 miles of water pipes. The system supplied about 1.48 billion litres of water each day in the FY2024/25 scale disclosure. Scotland’s water-rich image masks increasing regional supply stress: the utility’s climate adaptation work indicates that drought-condition supply deficits could rise from 60 million to 240 million litres per day under climate projections. Leakage was 453 million litres per day in FY2025/26, slightly above the in-year target of 450 Ml/d and broadly level with the prior year. Priorities include sustained leakage reduction, stronger interconnection, reservoir and catchment resilience, and better demand intelligence through domestic smart-monitor pilots and business metering.

227Water treatment worksFY2024/25 scale disclosure
1,200+Treated-water storage tanksFY2024/25 scale disclosure
240m L/dayPotential drought-condition supply deficitClimate projection

03

Wastewater System

The wastewater estate includes 34,299 miles of sewer pipes and 1,837 wastewater treatment works in the FY2024/25 disclosure. Scottish Water reported collecting approximately 3.5 billion litres of wastewater and rainwater each day; that combined collection measure is not the same as wastewater treated. Performance investment is focused on treatment compliance, overflow monitoring, pollution reduction and resilience to extreme rainfall. The utility installed 1,000 combined-sewer-overflow monitors in 2024 and planned progressively wider coverage. Seafield, Scotland’s largest wastewater treatment works, is a strategic asset with a further sludge-storage investment phase planned from 2026. Catchment restoration and heat recovery from wastewater complement conventional treatment investment.

1,837Wastewater treatment worksFY2024/25 scale disclosure
≈3.5bn L/dayWastewater and rainwater collectedFY2024/25 scale disclosure
1,000Combined-sewer-overflow monitors installed2024 programme milestone

04

Performance

99.92%Drinking-water complianceFY2025/26

The annual-report performance measure, down marginally from 99.93%.

453 Ml/dayLeakageFY2025/26

Reported against an in-year target of 450 Ml/day.

5,169Interruptions to supply over six hoursFY2025/26

Customer interruptions lasting more than six hours; 5,047 were reported a year earlier.

2Category 1 and 2 environmental pollution incidentsFY2025/26

The most serious incident categories, compared with four in the prior year.

Annual average leakage

Reported actuals, FY2021/22–FY2025/26

million litres per day
Annual average leakage: 2021/22, 459 million litres per day; 2022/23, 454 million litres per day; 2023/24, 462 million litres per day; 2024/25, 454 million litres per day; 2025/26, 453 million litres per day4404604804592021/224542022/234622023/244542024/254532025/26

Reported annual averages, rounded to the nearest 1 Ml/day. The FY2025/26 actual was 453 Ml/day against an in-year target of 450 Ml/day.

Sources: Water Industry Commission for Scotland performance reporting and Scottish Water annual reporting.

05

Investment & Priorities

Scottish Water reported £1.13 billion invested in capital and repairs in FY2025/26. Within the financial statements, regulated-company capital additions were £812 million; that accounting measure is shown separately and is not silently relabelled as total capital expenditure. The utility’s next regulatory cycle is centred on SR27, for 2027–2033. Its business plan proposes £13.4 billion of total investment and operating and essential costs, while the Delivery Vehicle 4 enterprise framework has a stated £5–9 billion delivery envelope. These are proposed or framework-scale future values, not actual annual investment. Current priorities include asset renewal, drought and flood resilience, wastewater compliance, digital monitoring, net-zero delivery and supply-chain capacity.

£1.13bnInvestment in capital and repairsFY2025/26 actual
£812mRegulated-company capital additionsFY2025/26 actual
£13.4bnSR27 business-plan envelopeProposed for 2027–2033

06

Sustainability & Resilience

Scottish Water’s sustainability programme combines operational carbon reduction, renewable-energy deployment and catchment restoration. Its FY2024/25 reporting recorded an operational greenhouse-gas footprint of 220,434 tonnes of carbon-dioxide equivalent and 10,892 tonnes of emissions reduction delivered during the year. Sixteen completed renewable schemes generated 6.42 gigawatt-hours. The longer-term strategy targets net-zero Scope 1 and Scope 2 emissions by 2040 and aims to move beyond net zero through land management and nature-based solutions. More than 800 hectares of peatland were restored between 2021 and 2025, including the completed Afton and Backwater reservoir projects, while the Loch Katrine plan proposes more than 4,600 hectares of native woodland.

220,434 tCO₂eOperational greenhouse-gas footprintFY2024/25
10,892 tCO₂eEmissions reduction deliveredFY2024/25
6.42 GWhGeneration from 16 completed renewable schemesFY2024/25

07

Key Challenges

  1. Closing emerging drought-condition supply deficits while keeping household demand affordable.
  2. Renewing a geographically dispersed asset base and sustaining leakage reductions.
  3. Reducing sewer overflows, pollution and climate-driven flooding across ageing networks.
  4. Scaling delivery capability for SR27 without weakening value-for-money or service performance.
  5. Reconciling a large construction programme with operational net-zero and nature-restoration ambitions.

08

Major Projects

Delivery Vehicle 4

An enterprise-style delivery model for major water and wastewater infrastructure, using long-term designers and asset-delivery partners.

Status / period
Preferred bidders confirmed; delivery period 2027–2033
Investment / capacity
£5–9bn framework value

Seafield sludge investment

Improves sludge storage and resilience at Scotland’s largest wastewater treatment works while reducing local odour impacts.

Status / period
Construction expected from summer 2026, subject to final approvals; completion targeted by end-2027

Loch Katrine landscape restoration

Combines catchment protection, peatland restoration and native woodland creation around a strategic source-water landscape.

Status / period
Ten-year land-management plan approved in 2024
Investment / capacity
4,600+ hectares of proposed native woodland

Afton Reservoir peatland restoration

Restores peatland to protect source-water quality and retain carbon in an important Ayrshire catchment.

Status / period
Completed in 2025
Investment / capacity
More than 500 hectares restored

Evidence

Sources and reporting periods

This profile is derived from Our Future Water’s governed documentary estate for Scottish Water, including annual reporting, regulatory material, climate and long-term strategies, and retained project documentation.

Evidence through: 2026-09-2276 source documents

Stay informed

Our Future Water Intelligence updates