01
About the Utility
Watercare Services Limited provides water and wastewater services to 1.8 million people across Auckland and manages an asset base valued at $18.76 billion. A council-controlled organisation, it became financially separate from Auckland Council in July 2025, now borrows directly in its own name and holds a Moody’s Aa3 rating. Its pricing, investment delivery, service quality and efficiency are overseen by the Commerce Commission, acting as Crown monitor under the Watercare Charter until 30 June 2028, after which a price-quality path applies. Drinking water safety is regulated separately by Taumata Arowai, the national water services regulator created by statute.
02
Water System
Watercare supplies an average of 440 million litres of drinking water a day to 484,000 homes and businesses. Ardmore, the largest treatment plant in New Zealand, works alongside the Huia and Waikato plants, and the Waikato River gives supply a larger catchment than the region’s dams. That matters because drought is the main operating risk: the Drought Management Plan was activated after dam levels fell uncomfortably low in March 2025. Water quality complied fully with bacterial, protozoal and chemical rules in FY26, while residual disinfection compliance was 97.9%.
03
Wastewater System
Watercare collects and treats an average of 439 million litres of wastewater a day. Overflows are the central performance issue: engineered and uncontrolled overflows across the network totalled 4,686 in 2024-25, against a consent target of two overflows a year, on a rolling five-year average, at each engineered overflow point. The Central Interceptor, New Zealand’s largest wastewater project, is designed to significantly reduce overflows to Auckland’s waterways. Its southern section went live in February 2025 and the northern section is planned to be ready to commission in mid-2026.
Wastewater overflows
Total Type 1 (engineered) and Type 3 (uncontrolled) wastewater overflows, financial years 2020-21 to 2024-25 (years ending 30 June)
Reported actual counts across the Auckland wastewater network.
Sources: Watercare, Auckland-wide Network Discharge Consent 2024-2025 Annual Performance Report (December 2025).04
Investment & Priorities
Watercare’s ten-year business plan commits $13.8 billion across more than 1,000 projects, split roughly evenly between renewing assets and serving growth; capital investment was $959.5m in FY26, $90.5m below target. The two largest programmes, each above $1 billion, are the replacement of the Huia Water Treatment Plant and the upgrade of the Māngere Wastewater Treatment Plant. Financial independence has moved funding onto Watercare’s own balance sheet, with borrowings of $4,699,828 thousand at the end of FY26.
05
Sustainability & Resilience
Climate exposure runs in both directions. The January 2023 floods triggered a recovery programme of about $100 million, rebuilt to improved resilience standards, and Watercare expects climate change to bring more frequent droughts and flooding. Emissions are a weaker area: operational emissions missed their FY26 targets even though 97% of electricity came from a renewable supplier, and the goal remains net zero by 2050. Affordability is regulated through a revenue cap under the Charter.
06
Key Challenges
- Delivering the $13.8 billion ten-year programme after FY26 investment fell short of target.
- Reducing wastewater overflows as the Central Interceptor’s northern section is commissioned.
- Protecting supply against drought as climate change brings more frequent dry periods.
- Meeting Commerce Commission expectations before a price-quality path applies from 2028.
- Cutting operational emissions after missing FY26 targets.
07
Major Projects
Central Interceptor
Adds tunnel storage and transfer capacity to reduce wastewater overflows into Auckland’s waterways.
- Status / period
- Southern section operational February 2025; northern section planned ready to commission mid-2026
- Investment / capacity
- NZ$1.668 billion; 16.2 km tunnel
Huia Water Treatment Plant replacement
Replaces the existing plant and adds treatment and storage capacity in western Auckland.
- Status / period
- Consented; construction expected in 2027
- Investment / capacity
- Planned capacity up to 160 million litres per day
Western Water Supply Programme
Coordinates treatment, raw-water mains, pumping and storage projects to strengthen western Auckland’s water supply.
- Status / period
- Programme 2025–2034; staged construction planned 2027–2034
- Investment / capacity
- More than NZ$1 billion; seven interconnected projects