Analysis

Acea Has Districted 72% of Its Rome Network. Its 2028 Loss Target Is 41.61%

Acea Ato 2 has 783 measurement districts covering about 72% of its network (2024). Acea targets 41.61% losses by 2028 across three operators, from 43.99% in 2025.

Paste the caption with your link. Social platforms control how previews appear.

Acea Ato 2 had divided about 72% of the network it manages into 783 measurement districts by the end of 2024, with 3,651 flow and pressure meters active. The next test is whether that measurement layer delivers the group's 2028 target: losses of 41.61% across Acea Ato 2, Acea Ato 5 and GORI, from 47.12% in 2023 and 43.99% in 2025.

Meters arrive in thousands

Customer metering is at an earlier stage. Acea Ato 2 began installing NB-IoT ultrasonic smart meters in the second half of 2024. Its 2024 sustainability report gives about 7,500 installed under Italy's recovery plan, against an objective of 33,000, and about 2,500 more outside it. At the end of 2024 the company had 764,525 active water customers.

A €99.9 million digital project

A recovery-plan project worth €99.9 million, €50 million of it from the plan, covers 2,800 km of districting, 200 km of rehabilitation and 3,200 km of leak detection. It targets the recovery of 68 Mm³ of lost water a year, against 269.4 Mm³ that Acea reported as lost in 2023.

The regulator's view

ARERA put Acea Ato 2's percentage losses at 42.07% in 2023, in class D, the second-weakest of its five loss classes, and set a 5% cut in linear losses for each of 2024 and 2025. Acea also aims to place 4,248 drinking water plants under remote control by 2028, from a 2023 baseline of 3,268, and to raise water reuse from 3.8 Mm³ to 7 Mm³ a year.

What the published loss figures show when set side by side, how the EIB's €450 million 2027–2030 package supports the program, and where energy and carbon targets stand are covered in the full report. The full report, Water Utility of the Future: Acea, is available for USD 499. For a free overview, read the Acea Utility Snapshot.

Continue reading

Related News

AnalysisCourt Annuls Award for Acea's €1.449 Billion Peschiera Aqueduct Doubling

A Rome court annulled the award of Acea's €1.449 billion Peschiera aqueduct doubling (reported 19 November 2026). Construction was due from June 2027; the concession ends in 2032.

View all News →

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.