Intelligence Reports/Utility Account Brief
Austin Water: Utility Account Brief cover

Utility Account Brief

Austin Water: Utility Account Brief

A supplier's guide to where Austin Water is spending, how the City of Austin buys for it, who already holds its major contracts and which projects to pursue first. Austin Water's five-year capital plan grew from US$2.7 billion to US$3.2 billion, mainly because of the US$1.5 billion Walnut Creek expansion, whose construction manager at risk is MWH Constructors. The next largest named contracts are wastewater pipes: the US$125.58 million Williamson Creek tunnel and the US$20.6 million Harris Branch interceptor.

Geography
Austin and surrounding areas, Texas, United States
Evidence current to
21 November 2026
Format
PDF
Length
12 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

US$3.2 billion: five-year capital improvement plan for FY 2027–2031 in the 2026-27 budget, up from US$2.7 billion

US$1.5 billion: Walnut Creek Wastewater Treatment Plant expansion to 100 MGD; construction began in April 2026 under construction manager at risk MWH Constructors

US$540,445,000: Series 2026 water and wastewater revenue bonds sold on March 25, 2026

US$363.6 million: low-interest Texas Water Development Board loans to date (July 2026)

02

Buyer relevance

Who the report is for

Civil contractors and tunnelling subcontractors

Find the prime contractors on Walnut Creek and the US$125.58 million Williamson Creek tunnel, and the approved Harris Branch and McNeil Drive projects.

Treatment equipment and process suppliers

Target the Walnut Creek scope, from nutrient removal to UV disinfection, through its construction manager at risk.

Engineering and consulting firms

Use the Capital Procurement and rotation-list RFQ route for Wild Horse, the US$10 million Travis Heights main and long-range supply work.

Leak detection and service line firms

Size the US$45 million polybutylene program and US$18 million service line plan against 7.1 billion gallons lost in 2023.

03

Decision scope

Questions answered

01

How big is Austin Water's capital plan?

US$3.2 billion for FY 2027–2031 in the 2026-27 budget, up from US$2.7 billion; cash funds 23.2% of it in FY 2027.

02

Who holds the largest contract?

MWH Constructors is construction manager at risk and AECOM the designer on the US$1.5 billion Walnut Creek expansion, under construction since April 2026.

03

How do I get on Austin Water's bid lists?

Register on Austin Finance Online with the right commodity codes; construction and engineering go through Capital Procurement, and contracts above the competitive threshold go to the City Council.

04

Is the federal loan for Walnut Creek secured?

Not yet: a WIFIA loan of up to US$1 billion was still listed as 'Applied' by EPA on October 13, 2026.

04

Inside the report

Inside the complete report

1. The Account at a Glance

2. Organisation and Decision-Making

3. Financial Position

4. Priorities and Pressures

5. How Austin Water Buys

6. Opportunity Register

7. Commercial Priorities: Where to Focus First

8. Watch List: What to Monitor and What to Do

Source Register

05

Public preview

What to watch next

WIFIA loan for Walnut Creek

Up to US$1 billion authorized; still "Applied" on October 13, 2026.

Water & Wastewater Commission and Council agendas

Contract recommendations and approvals appear here first.

FY 2027-28 budget (summer 2027)

Sets the next five-year plan and whether the planned 6.7% system-wide rate increase for FY 2028 holds.

Further defeasances

Council approved US$43.2 million on November 19, 2026 (Resolution No. 20261119-010); shows how cash is split between debt and capital.

Sample page · page 7 of 12

The Opportunity Register: each project's status, stage, existing contractors, supplier categories and route in, as of November 2026.

Landscape report page with the Opportunity Register table listing Austin Water projects such as Walnut Creek, Williamson Creek and Harris Branch with status, stage, contractors and access routes.

06

Included

What you receive

The complete PDF report: 12 pages, 9 sections, 7 tables and a register of 20 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

City of Austin budget, financial report and bond disclosures; Austin Water and City project releases and pages; Water & Wastewater Commission and Council documents; EPA loan listings; and the City's procurement, capital procurement and small and minority business pages, checked on November 21, 2026.

Sources

20 sources, listed in the report's source register. Evidence current to 21 November 2026. Principal data periods: FY 2024 audited results (fiscal year ended September 30, 2024); FY 2020–FY 2023 system results; FY 2026-27 budget and FY 2027–2031 capital plan. Project, financing and procurement status checked against public sources on November 21, 2026. All currency is US dollars (US$).

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Austin Water: Utility Account Brief

Format
PDF
Length
12 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Utility Account Brief
Edition
November 2026, First edition
Format
PDF
Length
12 pages
Reference
OFW_EXT_AUSTIN_WATER_UTILITY_ACCOUNT_BRIEF_d986328b301b
Evidence current to
21 November 2026

14

Explore this report family

More Utility Account Briefs

Explore the same report family covering other utilities.

Thames Water: Utility Account Brief cover

Thames Water: Utility Account Brief

A supplier's guide to where Thames Water is spending in AMP8, how it buys, who already holds its major work and which opportunities are open or emerging. Thames Water invested £2.4 billion in the first AMP8 year, £996 million of it on pollution prevention, and has let its estimated £4 billion Major Projects Framework to nine contractor teams with no guaranteed volume. The largest open opportunity is a smart-metering-as-a-service tender of about £1.32 billion, due for award on 20 September 2027, while the company runs on a creditor facility with £2.65 billion of £3 billion drawn by 15 October 2026.
Geography
London and the Thames Valley, England
Edition
November 2026 edition
Length
13 pages
Explore report
San Diego County Water Authority: Utility Account Brief cover

San Diego County Water Authority: Utility Account Brief

A supplier's guide to where San Diego County Water Authority spends, how it buys, who holds its major work and which of its projects are open or emerging. The Water Authority's steadiest contract line is renewal of its 308-mile large-diameter conveyance system, where 50 miles of PCCP have been relined since 2009 and the current relining contract near Bonsall runs to summer 2027. It returned to the bond market with US$285 million of Series 2026A bonds in September 2026, weeks after S&P cut its senior lien rating to AA, while a 3% rate rise for 2027 keeps cost pressure on suppliers.
Geography
San Diego County, California, United States
Edition
November 2026, First edition
Length
12 pages
Explore report
Orange County Water District: Utility Account Brief cover

Orange County Water District: Utility Account Brief

An assessment of where the Orange County Water District spends, how it buys and which PFAS treatment, well and plant refurbishment opportunities suppliers should pursue first. PFAS treatment leads the District's purchasing: US$90.1 million is budgeted for producer PFAS facilities in FY2026-27, and two plant contracts of US$23,587,500 and US$31,785,907 went to the lowest responsive bidders in 2026. Resin supply and three more PFAS sites are in procurement or design.
Geography
Orange County Groundwater Basin, California
Edition
November 2026, First edition
Length
11 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.