Intelligence Reports/Utility Account Brief
Thames Water: Utility Account Brief cover

Utility Account Brief

Thames Water: Utility Account Brief

A supplier's guide to where Thames Water is spending in AMP8, how it buys, who already holds its major work and which opportunities are open or emerging. Thames Water invested £2.4 billion in the first AMP8 year, £996 million of it on pollution prevention, and has let its estimated £4 billion Major Projects Framework to nine contractor teams with no guaranteed volume. The largest open opportunity is a smart-metering-as-a-service tender of about £1.32 billion, due for award on 20 September 2027, while the company runs on a creditor facility with £2.65 billion of £3 billion drawn by 15 October 2026.

Geography
London and the Thames Valley, England
Evidence current to
21 November 2026
Format
PDF
Length
13 pages
Edition
November 2026 edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

£2.4 billion: capital investment in FY 2025/26 on the Final Determination basis (£2,680 million including capitalised borrowing costs and adopted assets), of which £996 million went to pollution prevention

£4 billion: estimated value (excluding VAT) of the AMP8/9 Major Projects Framework, awarded to nine contractor teams in October 2026, with no guaranteed volume

About £1.32 billion: smart-metering-as-a-service tender (excluding VAT), in procurement, with award expected on 20 September 2027

£18,515.5 million: statutory net debt at 31 March 2026; £2.65 billion of a £3 billion creditor facility had been drawn by 15 October 2026

02

Buyer relevance

Who the report is for

Wastewater process and equipment suppliers

Target the 14 critical AMP8 schemes and the £840 million first wave of the Major Projects Framework through the nine framework teams.

Metering, communications and data companies

Prepare for the £1.32 billion smart-metering-as-a-service tender, split into a £1.15 billion Lot 1 and a £170 million Lot 2.

Leakage and demand management specialists

Use the Bid Assessment Framework, with leakage at 573.7 Ml/d against a 22% reduction target by 2029-30.

Heavy civil contractors and joint ventures

Track the £5.7 billion White Horse Reservoir main works tender against the Planning Inspectorate's acceptance decision due by 17 December 2026.

03

Decision scope

Questions answered

01

Who holds Thames Water's major construction work?

Nine contractor teams on the AMP8/9 Major Projects Framework, estimated at £4 billion excluding VAT, awarded in October 2026 with no guaranteed volume.

02

What is the largest open opportunity?

A smart-metering-as-a-service tender of about £1.32 billion excluding VAT, with award expected on 20 September 2027.

03

Where did Thames Water spend most in FY 2025/26?

Pollution prevention, at £996 million of capital investment, ahead of £529 million on leakage and future supplies.

04

How does Thames Water buy?

Through Find a Tender notices, invited lists drawn from Achilles UVDB, a Bid Assessment Framework for water resources, demand and leakage, and call-offs from frameworks already let.

05

What financial risk should a supplier weigh?

Statutory net debt was £18,515.5 million at 31 March 2026, and a court sanction hearing on 13 January 2027 decides whether 2027 maturities move to March 2028.

04

Inside the report

Inside the complete report

1. The Account at a Glance

2. Organisation and Decision-Making

3. Financial Position

4. Priorities and Pressures

5. How Thames Water Buys

6. Opportunity Register

7. Commercial Priorities: Where to Focus First

8. Watch List: What to Monitor and What to Do

Source Register

05

Public preview

What to watch next

Part 26A court process (convening hearing 27 November 2026; creditor meetings 17 December 2026; sanction 13 January 2027)

Decides whether 2027 maturities move to March 2028 and liquidity lasts into autumn 2027.

London & Valley Water proposal

Not approved by the Board or Ofwat; a Commons committee urged ministers to consider special administration in September 2026.

White Horse Reservoir acceptance (by 17 December 2026)

Gates the £5.7bn main works procurement.

Smart-metering-as-a-service award (expected 20 September 2027)

Largest open technology contract.

Sample page · page 8 of 13

Opportunity Register: open procurements, confirmed programmes and emerging schemes, with stage, contractors, supplier categories and route in.

Landscape report page with a table listing Thames Water projects, their procurement status, stage at November 2026, existing contractors, supplier categories, next milestones and how to access them.

06

Included

What you receive

The complete PDF report: 13 pages, 9 sections, 6 tables and a register of 27 sources.

This edition

November 2026 edition.

07

Evidence & method

Evidence and method

Thames Water's FY 2025/26 annual report, Annual Performance Report, investor report and AMP8 delivery plan report; its procurement page, framework and contract award notices and trade press; Ofwat, Environment Agency and Planning Inspectorate documents; and company financing announcements and rating actions to 21 November 2026.

Sources

27 sources, listed in the report's source register. Evidence current to 21 November 2026. Principal data periods: FY 2025/26 (year ended 31 March 2026), the first year of the 2025–2030 price control (AMP8). Project, procurement and financing status checked against public sources on 21 November 2026. All currency is pounds sterling (£).

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Thames Water: Utility Account Brief

Format
PDF
Length
13 pages
Edition
November 2026 edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Utility Account Brief
Edition
November 2026 edition
Format
PDF
Length
13 pages
Reference
OFW_EXT_THAMES_WATER_UTILITY_ACCOUNT_BRIEF_e13edb9df686
Evidence current to
21 November 2026

14

Explore this report family

More Utility Account Briefs

Explore the same report family covering other utilities.

Austin Water: Utility Account Brief cover

Austin Water: Utility Account Brief

A supplier's guide to where Austin Water is spending, how the City of Austin buys for it, who already holds its major contracts and which projects to pursue first. Austin Water's five-year capital plan grew from US$2.7 billion to US$3.2 billion, mainly because of the US$1.5 billion Walnut Creek expansion, whose construction manager at risk is MWH Constructors. The next largest named contracts are wastewater pipes: the US$125.58 million Williamson Creek tunnel and the US$20.6 million Harris Branch interceptor.
Geography
Austin and surrounding areas, Texas, United States
Edition
November 2026, First edition
Length
12 pages
Explore report
San Diego County Water Authority: Utility Account Brief cover

San Diego County Water Authority: Utility Account Brief

A supplier's guide to where San Diego County Water Authority spends, how it buys, who holds its major work and which of its projects are open or emerging. The Water Authority's steadiest contract line is renewal of its 308-mile large-diameter conveyance system, where 50 miles of PCCP have been relined since 2009 and the current relining contract near Bonsall runs to summer 2027. It returned to the bond market with US$285 million of Series 2026A bonds in September 2026, weeks after S&P cut its senior lien rating to AA, while a 3% rate rise for 2027 keeps cost pressure on suppliers.
Geography
San Diego County, California, United States
Edition
November 2026, First edition
Length
12 pages
Explore report
Orange County Water District: Utility Account Brief cover

Orange County Water District: Utility Account Brief

An assessment of where the Orange County Water District spends, how it buys and which PFAS treatment, well and plant refurbishment opportunities suppliers should pursue first. PFAS treatment leads the District's purchasing: US$90.1 million is budgeted for producer PFAS facilities in FY2026-27, and two plant contracts of US$23,587,500 and US$31,785,907 went to the lowest responsive bidders in 2026. Resin supply and three more PFAS sites are in procurement or design.
Geography
Orange County Groundwater Basin, California
Edition
November 2026, First edition
Length
11 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.