Intelligence Reports/Water Utility Intelligence Report
Water Systems Overview: EYDAP S.A. cover

Water Utility Intelligence Report

Water Systems Overview: EYDAP S.A.

Athens' water system splits supply from service: EYDAP Fixed Assets owns the External Water Supply System, while EYDAP treats and distributes water for approximately 4,400,000 residents. Reservoir reserves recovered from 399.7 to 723.9 million m3 in the first half of 2026 but stayed below 2019 levels, and non-revenue water was 25.46% in H1 2026.

Geography
Athens and Attica, Greece
Evidence current to
12 November 2026
Format
PDF
Length
12 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

Approximately 4,400,000 residents: population served with water supply; 3,695,500 with sewerage (FY2025 report, actual)

399.7 → 723.9 million m3: withdrawable reserves of the main reservoirs, January 1 to July 1, 2026 (actual)

25.46%: non-revenue water in H1 2026 (actual; 23.70% in 2023)

€2.5 billion: investment plan for 2026–2035 (plan); €77.5 million was absorbed in 2025 (actual)

02

Buyer relevance

Who the report is for

Water-resource and drought-resilience advisers

See reserve levels, the reserve sources EYDAP activated and the status of the Eurytos diversion in one place.

Public-sector and regulatory analysts

Follow how the State, EYDAP Fixed Assets, the regulator and four laws passed between 2024 and 2026 divide responsibility for Athens' water.

Engineering and operations suppliers

Compare network lengths, treatment capacities and loads, losses and overflow data before scoping work with EYDAP.

Investors following EYDAP

Read the 2025–2029 allowed revenue, the €323 million disputed claim and the €2.5 billion plan against actual absorption of €77.5 million in 2025.

03

Decision scope

Questions answered

01

Who owns Athens' water supply system?

EYDAP Fixed Assets owns the 495 km External Water Supply System, which EYDAP operates under a contract extended to December 31, 2026; the State holds 61.33% of EYDAP's voting rights.

02

How did reserves recover after the 2025 drought?

Withdrawable reserves rose from 399.7 million m3 on January 1, 2026 to 723.9 million m3 on July 1, 2026, mainly from rainfall; EYDAP's reserve-source actions added about 56 million m3.

03

How large is the system EYDAP runs?

Four water treatment plants with 1.8 million m3 a day of capacity, approximately 14,300 km of water mains and 8,716 km of sewers, and five wastewater treatment plants led by Psyttalia.

04

What changes under Law 5325/2026?

EYDAP's jurisdiction extends into Boeotia, Phocis and Evia, with special succession of about 43 providers expected by July 31, 2027.

04

Inside the report

Inside the complete report

Executive Overview

1. Water Resource Profile

2. Governance and Institutional Framework

3. Infrastructure and Service Delivery

Strategic Outlook and Opportunities

Source Register

05

Public preview

What to watch next

1. Water Resource Profile

Reserve levels entering the 2026–2027 hydrological year; any Eurytos tender notice and the decision on its funding; the status of the state of emergency.

2. Governance and Institutional Framework

The regulator's response to the €323 million review request; the Council of State hearing; renewal of the External Water Supply System contract for 2027; the first valuations under Law 5325/2026.

3. Infrastructure and Service Delivery

Full-year 2026 non-revenue water against the 25.46% recorded in H1 2026; mains replacement in full-year 2026; the signing of the two main Eastern Attica plant contracts; any change in Psyttalia overflows.

Strategic Outlook and Opportunities

Award of the Rafina/Spata plant and signing of Marathon; full-year 2026 absorption; the smart-meter tender notice; the first regional investment plans under Law 5325/2026; reserve levels and any Eurytos decision.

Sample page · page 7 of 12

Treatment assets and service performance: capacities and loads, losses, overflows, drinking water quality and customer service.

Report page with tables of EYDAP's treatment plants and their loads, service performance indicators for 2019–2026, and customer service figures.

06

Included

What you receive

The complete PDF report: 12 pages, 6 sections, 17 tables and a register of 22 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

EYDAP's annual financial reports through FY2025 and its H1 2026 semi-annual report, ESG metrics, sustainability reports and drinking water quality data, the regulator's decisions and EYDAP's 2025–2029 tariff proposal, the tariff schedule, and dated press reports on project status checked to November 12, 2026.

Sources

22 sources, listed in the report's source register. Evidence current to 12 November 2026. Principal data periods: FY2025 annual financial report (year ended December 31, 2025); semi-annual financial report for January 1 to June 30, 2026; operating and environmental data for 2021–2025; project and procurement status as of November 12, 2026. All currency is euros..

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Systems Overview: EYDAP S.A.

Format
PDF
Length
12 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Water Utility Intelligence Report
Edition
November 2026, First edition
Format
PDF
Length
12 pages
Reference
OFW_EXT_WATER_SYSTEMS_OVERVIEW_EYDAP_S_A_efb9aa036421
Evidence current to
12 November 2026

14

Explore this report family

More Water Systems Overview reports

Explore the same report family covering other utilities.

Water Systems Overview: Portland Water Bureau cover

Water Systems Overview: Portland Water Bureau

Portland's water system depends on one primary source: the Bull Run supplied 98% of the city's water in FY 2014-15 and 86% in FY 2015-16, and the Columbia South Shore Well Field, at close to 100 million gallons a day, cannot meet demand without it. The system's institutions are organized around filtering that supply by September 30, 2029, and the $2.46 billion filtration project was 43% complete at end-September 2026.
Geography
Portland and surrounding areas, Oregon, United States
Edition
November 2026, First edition
Length
11 pages
Explore report
Water Systems Overview: Dŵr Cymru Welsh Water cover

Water Systems Overview: Dŵr Cymru Welsh Water

Dŵr Cymru Welsh Water met 6 of 23 Ofwat performance targets in 2025-26 and was rated off track, even as revenue rose to £1,169.8 million on a c.30% uplift in household bills. Ofwat found the company had not shown it was on track to deliver its 2025-30 commitments: water outputs were 23% below baseline in 2025-26, and although wastewater outputs ran 59% ahead, wastewater deliverable allowances were 66% underspent and fewer than 40% of wastewater schemes are expected with the supply chain by the end of 2026-27.
Geography
Wales
Edition
November 2026, First edition
Length
13 pages
Explore report
Water Systems Overview: DC Water cover

Water Systems Overview: DC Water

DC Water runs a regional wastewater system serving about 1.8 million suburban users alongside a District-only drinking water network that relies on one river, with the Washington Aqueduct withdrawing about 140 million gallons a day. Its FY 2027 capital budget of US$1,072.3 million is 38.0% above the FY 2026 revised budget, inside a US$9.69 billion ten-year plan.
Geography
Washington, District of Columbia, United States; wholesale wastewater for Maryland and Virginia counties
Edition
November 2026, First edition
Length
12 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.