Water Utility of the Future: EYDAP S.A.

EYDAP is becoming a regulated regional system operator: a €2.5 billion investment plan for 2026–2035, an approved 6.24% WACC for 2025–2029 and about 43 water providers to absorb by July 31, 2027. Its delivery pace is the test, with €77.5 million of investment absorbed in 2025 and the tender for about 2.1 million smart meters now targeted for H1 2027.

Geography
Athens and Attica, Greece
Evidence current to
12 November 2026
Format
PDF
Length
16 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

€2.5 billion: investment plan for 2026–2035, led by €965 million of Eastern Attica sewerage projects (plan, H1 2026 report)

About 2.1 million meters, about €300 million: smart-meter program at technology evaluation, with its tender targeted for H1 2027 (planned)

73.47%: renewable share of total energy consumption in 2025, up from 61.05% in 2024 (actual)

About 43 providers: to be absorbed across Attica, Boeotia, Phocis and Evia under Law 5325/2026, with special succession expected by July 31, 2027 (law enacted; succession not yet completed)

02

Buyer relevance

Who the report is for

Metering and digital-water suppliers

Time bids around the smart-meter tender targeted for H1 2027 and the SCADA, ERP and digital-twin work already under way.

Wastewater contractors and engineering firms

Track the Rafina/Spata re-tender (€94.02 million excluding VAT), the Marathon award and the Psyttalia Phase 3 study against the €965 million Eastern Attica line.

Investors and lenders following EYDAP

Read the 2025–2029 allowed-revenue path, the €323 million disputed claim and the €250 million EIB line (no drawdown reported) side by side with actual absorption.

Energy developers and public-sector advisers

See the seven PV stations (9.72 MW), the 13.99 MW Psyttalia biogas plant and the stormwater and irrigation duties added by Law 5325/2026.

03

Decision scope

Questions answered

01

How much has EYDAP actually invested?

Absorption was €77.5 million in 2025 and €39.2 million in H1 2026; the €2.5 billion for 2026–2035 is a plan, not spending.

02

When will EYDAP tender its smart meters?

The program for about 2.1 million meters, at about €300 million, is at technology evaluation, with the tender targeted for H1 2027 after slipping from 2023.

03

What does Law 5325/2026 change?

It extends EYDAP into Boeotia, Phocis and Evia, adds stormwater and irrigation, and requires special succession of about 43 providers by July 31, 2027.

04

How far has EYDAP moved on renewable energy?

Renewables were 73.47% of total energy consumption in 2025, up from 61.05% in 2024, and seven PV stations totaling 9.72 MW have been tendered.

04

Inside the report

Inside the complete report

Executive Snapshot

1. From Service Provider to System Operator

2. System Intelligence and Digital Control

3. Energy, Carbon, and Resource Decoupling

4. Infrastructure Strategy for a Non-Stationary Climate

5. Customers, Demand, and the Water Prosumer

6. Governance, Regulation, and Institutional Reform

7. Capital Planning and Financial Architecture

8. Workforce, Capability, and Organisational Change

9. Strategic System Roadmap

Conclusion

Source Register

05

Public preview

What to watch next

2. System Intelligence and Digital Control

Launch of the smart-meter tender and its lot structure; full-year 2026 NRW against the 25.46% recorded in H1 2026; results from the satellite leak-detection pilots.

6. Governance, Regulation, and Institutional Reform

RAAEY's response to the €323 million review request; the Council of State hearing; RAAEY's role in approving the valuations for the new territory.

7. Capital Planning and Financial Architecture

Full-year 2026 absorption; first drawdown under the EIB line; whether the €2.8 billion figure becomes the formal plan.

9. Strategic System Roadmap

Bid opening and award for Rafina/Spata; Marathon contract signing; the smart-meter tender notice; completion of the first special successions.

Sample page · page 13 of 16

The strategic roadmap: dated milestones from end-2026 to 2040, with the status of each as of November 12, 2026.

Report page showing a roadmap table of EYDAP milestones by horizon, with status and role, and a table of Eastern Attica sewerage progress to June 2026.

06

Included

What you receive

The complete PDF report: 16 pages, 12 sections, 23 tables and a register of 22 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

EYDAP's annual financial reports through FY2025, its H1 2026 semi-annual report, its ESG metrics and sustainability statements, the RAAEY decisions and EYDAP's tariff proposal for 2025–2029, the EIB project page, and dated Greek press reports on procurement status checked to November 12, 2026.

Sources

22 sources, listed in the report's source register. Evidence current to 12 November 2026. Principal data periods: FY2025 annual financial report (year ended December 31, 2025); semi-annual financial report for January 1 to June 30, 2026; the 2025–2029 regulatory period approved on December 30, 2025; project and procurement status as of November 12, 2026. All currency is euros..

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Utility of the Future: EYDAP S.A.

Format
PDF
Length
16 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Water Utility Intelligence Report
Edition
November 2026, First edition
Format
PDF
Length
16 pages
Reference
OFW_EXT_WATER_UTILITY_OF_THE_FUTURE_EYDAP_S_A_37e220bbfff7
Evidence current to
12 November 2026

14

Explore this report family

More Water Utility of the Future reports

Explore the same report family covering other utilities.

Water Utility of the Future: Portland Water Bureau cover

Water Utility of the Future: Portland Water Bureau

Portland Water Bureau's transition is set by three dated programs: Bull Run Filtration, 43% complete with $1,028.34 million spent of a $2.46 billion budget at end-September 2026 and due to deliver filtered water by September 30, 2029; a smart meter program replacing about 114,000 meters, with digital reading from mid-2027; and a Net Zero Strategy to halve emissions by 2030. A single Director of Public Utilities now leads both the Water Bureau and the Bureau of Environmental Services.
Geography
Portland and surrounding areas, Oregon, United States
Edition
November 2026, First edition
Length
14 pages
Explore report
Water Utility of the Future: DC Water cover

Water Utility of the Future: DC Water

DC Water is turning into the operator of a regional system built around storage, resource recovery and a possible second drinking water source, inside a US$9.69 billion capital plan for FY 2026–FY 2035. Its main commitments converge on 2029–2030: the US$819 million Potomac River Tunnel and the Piney Branch Tunnel, while lead service line removal, with more than 12,000 lines replaced by summer 2026, is expected to run beyond its original 2030 target.
Geography
Washington, District of Columbia, United States; wholesale wastewater for Maryland and Virginia counties
Edition
November 2026, First edition
Length
15 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.