Intelligence Reports/Water Utility Intelligence Report
Water Systems Overview: DC Water cover

Water Utility Intelligence Report

Water Systems Overview: DC Water

DC Water runs a regional wastewater system serving about 1.8 million suburban users alongside a District-only drinking water network that relies on one river, with the Washington Aqueduct withdrawing about 140 million gallons a day. Its FY 2027 capital budget of US$1,072.3 million is 38.0% above the FY 2026 revised budget, inside a US$9.69 billion ten-year plan.

Geography
Washington, District of Columbia, United States; wholesale wastewater for Maryland and Virginia counties
Evidence current to
12 November 2026
Format
PDF
Length
12 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

About 140 million gallons a day: withdrawn by the Washington Aqueduct from the Potomac River, the District's single drinking water source (2025 Drinking Water Quality Report)

About 1.8 million: suburban wastewater users served wholesale, alongside about 700,000 District residents served at retail (FY 2027 Approved Budget)

67.17%: share of treated water pumped that was billed in FY 2025 (36,758 million gallons pumped; 24,691 billed)

US$9.69 billion: ten-year capital disbursements planned for FY 2026–FY 2035

02

Buyer relevance

Who the report is for

Regional planners and neighboring jurisdictions

See how Blue Plains, the regional interceptors and the Board's joint-use rules divide responsibility between the District and four suburban counties.

Engineering and construction firms

Use the FY 2027 capital table to see which areas are growing, from Sanitary Sewer at US$230.7 million to Wastewater Treatment at US$127.5 million.

Credit analysts and investors

Set FY 2025 operating revenues of US$1,004.3 million and coverage of 2.40x against debt projected to reach US$6.9 billion by FY 2035.

Water resilience and policy specialists

Assess the District's single-source exposure and the study-stage Pure Water DC response.

03

Decision scope

Questions answered

01

Where does the District's drinking water come from?

From the Potomac River through the Washington Aqueduct, which withdraws about 140 million gallons a day at Great Falls and Little Falls; DC Water distributes it.

02

How much of the water DC Water pumps is billed?

67.17% in FY 2025: 24,691 of 36,758 million gallons, against 72.40% in FY 2016.

03

Who sets DC Water's rates?

Its Board: rate setting is a non-joint-use matter decided by District members only, and the Board approved FY 2027 and FY 2028 rates on September 3, 2026.

04

Where is capital spending growing fastest?

Among the larger FY 2027 budget lines, Wastewater Treatment (+53.3%) and Sanitary Sewer (+48.5%) rise fastest against the FY 2026 revised budget.

04

Inside the report

Inside the complete report

Executive Overview

1. Water Resource Profile

2. Governance and Institutional Framework

3. Infrastructure and Service Delivery

Strategic Outlook and Opportunities

Source Register

05

Public preview

What to watch next

Strategic Outlook and Opportunities

The FY 2028 proposed budget and any revision of the US$9.69 billion plan; Potomac River Tunnel progress after TBM Emily starts; a reconfirmed Lead Free DC completion date; the Army Corps feasibility findings; any ruling or settlement in the Potomac Interceptor cases.

3. Infrastructure and Service Delivery

The 2026 Drinking Water Quality Report results for calendar 2025; Potomac River Tunnel progress; FY 2026 results and coverage in the next ACFR.

2. Governance and Institutional Framework

Any settlement or judgment in the Potomac Interceptor cases; MDE's response to a revised plan; a successor strategic plan; Board votes on the FY 2028 budget.

1. Water Resource Profile

The Army Corps of Engineers feasibility findings; the Discovery Center opening in fall 2027; the next ACFR pumped-and-billed figures; FY 2028 water purchase and Aqueduct budget lines.

Sample page · page 8 of 12

FY 2027 capital budget by area against the FY 2026 revised budget, and DC Water's dated commitments, from the Strategic Outlook.

Report page with a table of DC Water's FY 2027 capital budget by area with percentage changes, and a table of major commitments with dates and status.

06

Included

What you receive

The complete PDF report: 12 pages, 6 sections, 11 tables and a register of 28 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

DC Water's FY 2025 ACFR statistical section, 2025 Drinking Water Quality Report and FY 2027 Approved Budget; Board, Blue Plains, Clean Rivers and Pure Water DC pages; and federal and state documents including the EPA consent decree, the DC Public Service Commission and the April 2026 lawsuits.

Sources

28 sources, listed in the report's source register. Evidence current to 12 November 2026. Principal data periods: FY 2025 results (fiscal year ended September 30, 2025); FY 2027 Approved Budget (adopted March 5, 2026); FY 2027 and FY 2028 rates (approved September 3, 2026); calendar 2024 water quality data; project status checked to November 12, 2026. All currency is US dollars..

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Systems Overview: DC Water

Format
PDF
Length
12 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Water Utility Intelligence Report
Edition
November 2026, First edition
Format
PDF
Length
12 pages
Reference
OFW_EXT_WATER_SYSTEMS_OVERVIEW_DC_WATER_d4386bd14ca5
Evidence current to
12 November 2026

14

Explore this report family

More Water Systems Overview reports

Explore the same report family covering other utilities.

Water Systems Overview: Portland Water Bureau cover

Water Systems Overview: Portland Water Bureau

Portland's water system depends on one primary source: the Bull Run supplied 98% of the city's water in FY 2014-15 and 86% in FY 2015-16, and the Columbia South Shore Well Field, at close to 100 million gallons a day, cannot meet demand without it. The system's institutions are organized around filtering that supply by September 30, 2029, and the $2.46 billion filtration project was 43% complete at end-September 2026.
Geography
Portland and surrounding areas, Oregon, United States
Edition
November 2026, First edition
Length
11 pages
Explore report
Water Systems Overview: Dŵr Cymru Welsh Water cover

Water Systems Overview: Dŵr Cymru Welsh Water

Dŵr Cymru Welsh Water met 6 of 23 Ofwat performance targets in 2025-26 and was rated off track, even as revenue rose to £1,169.8 million on a c.30% uplift in household bills. Ofwat found the company had not shown it was on track to deliver its 2025-30 commitments: water outputs were 23% below baseline in 2025-26, and although wastewater outputs ran 59% ahead, wastewater deliverable allowances were 66% underspent and fewer than 40% of wastewater schemes are expected with the supply chain by the end of 2026-27.
Geography
Wales
Edition
November 2026, First edition
Length
13 pages
Explore report
Water Systems Overview: EYDAP S.A. cover

Water Systems Overview: EYDAP S.A.

Athens' water system splits supply from service: EYDAP Fixed Assets owns the External Water Supply System, while EYDAP treats and distributes water for approximately 4,400,000 residents. Reservoir reserves recovered from 399.7 to 723.9 million m3 in the first half of 2026 but stayed below 2019 levels, and non-revenue water was 25.46% in H1 2026.
Geography
Athens and Attica, Greece
Edition
November 2026, First edition
Length
12 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.