Water Utility IntelligenceDC Water (District of Columbia Water and Sewer Authority)

Free Utility Snapshot

DC Water (District of Columbia Water and Sewer Authority)

Washington, District of Columbia, United States; wholesale wastewater for Maryland and Virginia counties

Washington’s water and sewer authority, running Blue Plains while delivering consent-decree overflow tunnels, lead pipe removal and a second-source strategy.

At a glance

Scale, service and financial position

$1,004,284 thousandTotal operating revenuesFY2025 · actual
36,758 MGTreated water delivered (24,691 MG billed)FY2025 · actual
384 million gallonsBlue Plains rated daily capacityDesign capacity
127,562Customer accountsFY2025
$4,090,104 thousandTotal debt (excluding commercial paper)FY2025 · actual
$147.16Average monthly residential billFY2026 · approved rates

01

About the Utility

DC Water, the District of Columbia Water and Sewer Authority, provides retail drinking water and wastewater services in the District and wholesale wastewater treatment at Blue Plains for suburban counties in Maryland and Virginia. Its rates are set by its own Board of Directors under the Authority statute rather than by the District’s Public Service Commission. The Board has 11 principal members drawn from the District and from Montgomery, Prince George’s and Fairfax counties. The authority employed 1,128 people and served 127,562 customer accounts in FY 2025, and S&P has rated its senior-lien debt AAA for 10 consecutive years.

02

Water System

DC Water distributes drinking water it does not treat itself: the Washington Aqueduct withdraws about 140 million gallons a day from intakes at Great Falls and Little Falls, and DC Water carries it across the District. Its quality results complied with all EPA drinking water standards in 2024. Two constraints dominate: the District depends on that single source and once came within 30 minutes of exhausting its supply. Lead is the other: more than 42,000 service lines contain lead or galvanized-iron pipe, which DC Water aims to remove by 2030. Water billed was 67.17% of water pumped in the latest fiscal year.

1,300 milesDistribution pipes (nearly 44,000 valves, 9,510 hydrants)2025 water quality report
67.17%Water billed as share of water pumped (FY2016: 72.40%)FY2025 · actual
2 ppbLead at the tap, 90th percentile (action level 15 ppb)2024 · both monitoring periods

03

Wastewater System

Blue Plains treats close to 300 million gallons of wastewater a day on average and serves the District and neighbouring counties in Maryland and Virginia. Its treatment train runs from primary and secondary treatment through denitrification and multimedia filtration. Solids pass through the Bailey Bioenergy Facility, which generates up to 10 megawatts and produces Class A biosolids sold as Bloom. Combined sewer overflows are the central performance issue, and tunnels are now delivering results: overflows to the Anacostia River have fallen by 90 percent since March 2018.

300 million gallonsAverage daily wastewater treated (rated capacity 384, peak over 780)Average day
153,360 kWhElectricity generated per day (680,160 kWh used)FY2025 · actual

04

Investment & Priorities

Investment is led by the Clean Rivers Project, required by a consent decree with EPA whose final compliance date is 2030. The Northeast Boundary Tunnel entered operation in 2023, and the $819 million Potomac River Tunnel is projected for completion in 2030. Lead Free DC adds an estimated $1.8 billion programme. S&P credits DC Water with executing a $9.7 billion ten-year capital plan, financed partly through green and century bonds and a federal WIFIA loan.

$819 millionPotomac River Tunnel contract valueProjected completion 2030
Approximately $1.8 billionLead Free DC estimated programme cost2024 estimate
2.40Combined debt service coverageFY2025 · actual

Total operating revenues

DC Water total operating revenues, $ thousand, FY2016–FY2025 (fiscal years ending 30 September)

$ thousand
Total operating revenues: FY2016, 595,789 $ thousand, actual; FY2017, 643,169 $ thousand, actual; FY2018, 684,502 $ thousand, actual; FY2019, 705,147 $ thousand, actual; FY2020, 736,828 $ thousand, actual; FY2021, 770,557 $ thousand, actual; FY2022, 832,210 $ thousand, actual; FY2023, 898,763 $ thousand, actual; FY2024, 977,982 $ thousand, actual; FY2025, 1,004,284 $ thousand, actual0500,0001,000,0001,500,000595,789FY2016643,169FY2017684,502FY2018705,147FY2019736,828FY2020770,557FY2021832,210FY2022898,763FY2023977,982FY20241,004,284FY2025
Actual

Reported actuals from one ten-year table in the FY 2025 statistical section (unaudited).

Sources: DC Water FY 2025 Annual Comprehensive Financial Report, Statistical Section, Exhibit 1.

05

Sustainability & Resilience

Supply resilience is now an explicit priority. Pure Water DC, launched in November 2025, is exploring advanced water reuse at Blue Plains as a second drinking water source, backed by $21 million in seed funding. Affordability is the counterweight to heavy investment: bills have risen steadily, and a multi-tier Customer Assistance Program cushions low-income households as the authority proposes a further 6.6 percent increase for the next fiscal year.

$156.80Proposed average monthly residential bill (FY2026: $147.16)FY2027 · proposed
$88.99 → $135.55Average monthly residential billFY2016 → FY2025 · actual

06

Key Challenges

  1. Delivering the Potomac River Tunnel and remaining Clean Rivers works by the 2030 compliance date.
  2. Removing all lead service lines in the District by 2030 within an estimated $1.8 billion programme.
  3. Securing a second drinking water source to reduce dependence on the Washington Aqueduct.
  4. Maintaining affordability as proposed rate increases follow a decade of rising bills.

07

Major Projects

Potomac River Tunnel

Intercepts combined sewer overflows for treatment before they reach the Potomac River.

Status / period
Under construction; projected completion 2030
Investment / capacity
$819 million contract; 5.5 miles

Northeast Boundary Tunnel

Adds combined sewage and stormwater storage while reducing overflows and chronic flooding.

Status / period
In operation since September 15, 2023
Investment / capacity
Approximately $583 million; 90 million gallons storage

Anacostia River Tunnel

Diverts combined sewer overflows to Blue Plains for treatment.

Status / period
In service since March 2018
Investment / capacity
2.4 miles; 23-foot diameter

Evidence

Sources and reporting periods

This Snapshot draws on DC Water’s audited financial reports and ten-year statistical tables, drinking water quality reporting, rate notices, programme and project disclosures, the EPA consent decree record and rating-agency announcements.

Evidence through: 2026-09-2420 source documents