Intelligence Reports/Utility Account Brief
DC Water: Utility Account Brief cover

Utility Account Brief

DC Water: Utility Account Brief

DC Water's FY 2027 capital budget of US$1,072.3 million is 38.0% above the revised FY 2026 budget, inside a US$9.69 billion ten-year plan, and its October 2, 2026 forecast lists 13 planned capital solicitations. The largest new work is a US$120M–US$130M progressive design-build for M Street transmission mains, alongside lead line packages of US$35M–US$40M each and a CMAR master agreement for Potomac Interceptor rehabilitation.

Geography
Washington, District of Columbia, United States; wholesale wastewater for Maryland and Virginia counties
Evidence current to
12 November 2026
Format
PDF
Length
11 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

US$9.69 billion: ten-year capital disbursements planned for FY 2026–FY 2035 (FY 2027 Approved Budget)

US$1,072.3 million: FY 2027 capital budget, against a FY 2026 revised budget of US$776.8 million (+38.0%, calculated)

13 capital solicitations: listed as planned in DC Water's Capital Projects Forecast of October 2, 2026, the largest stated value US$120M–US$130M

AAA / Aa1 / AA+: senior lien ratings from S&P, Moody's and Fitch, reaffirmed February 11, 2026

02

Buyer relevance

Who the report is for

Water main and transmission main contractors

Time bids for the M Street progressive design-build and the small-diameter water main task orders valued at US$16M–US$19M each.

Sewer rehabilitation firms

Prepare for the Potomac Interceptor CMAR master agreement, whose first task order covers about 17,000 feet of 66–72-inch pipe in Fairfax County.

Chemical and service suppliers to Blue Plains

Plan for the RFQs for calcium hydroxide, polymers, ferric chloride, sodium bisulfite and sodium hypochlorite planned for January–April 2027.

Business development teams at engineering firms

See who already holds DC Water's largest contracts, from the US$819 million Potomac River Tunnel to the US$146 million PCL award.

03

Decision scope

Questions answered

01

How much has DC Water budgeted for capital?

Its FY 2027 capital budget is US$1,072.3 million, against US$776.8 million in the revised FY 2026 budget, within a US$9.69 billion plan for FY 2026–FY 2035.

02

How does DC Water buy?

All solicitations since October 2020 go through its New Vendor Portal; much repeat construction is let as task orders under master service agreements for qualified contractors.

03

What is the largest planned solicitation?

The M Street Corridor Transmission Mains project, a progressive design-build valued at US$120M–US$130M, planned for October 2026 in the October 2, 2026 forecast.

04

Who holds the biggest current contract?

A CBNA–Halmar joint venture holds the US$819 million design-build contract for the Potomac River Tunnel, due in 2030.

04

Inside the report

Inside the complete report

1. The Account at a Glance

2. Organisation and Decision-Making

3. Financial Position

4. Priorities and Pressures

5. How DC Water Buys

6. Opportunity Register

7. Commercial Priorities: Where to Focus First

8. Watch List: What to Monitor and What to Do

Source Register

05

Public preview

What to watch next

Capital Projects and Goods and Services forecasts

Updated regularly; list planned months, methods and values.

New Vendor Portal postings

Several items were planned for October–November 2026.

Potomac Interceptor litigation and MDE review

Settlements or orders could change scope and timing of rehabilitation.

FY 2028 proposed budget

Shows whether the US$9.69 billion plan and FY 2027 lines hold.

Sample page · page 7 of 11

Opportunity Register: planned DC Water solicitations with values, methods and access routes.

Landscape report page with a table listing DC Water projects, their status, planned solicitation dates, values, delivery methods, supplier categories and how to access them.

06

Included

What you receive

The complete PDF report: 11 pages, 9 sections, 6 tables and a register of 17 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

DC Water's Capital Projects and Goods and Services forecasts (October 2026), its procurement guidance and contract award announcements, the FY 2027 Approved Budget, the FY 2025 ACFR statistical section, and project and litigation sources including the Justice Department's April 2026 complaint.

Sources

17 sources, listed in the report's source register. Evidence current to 12 November 2026. Principal data periods: FY 2025 results (fiscal year ended September 30, 2025); FY 2027 Approved Budget (adopted March 5, 2026); DC Water procurement forecasts dated October 2, 2026 (capital) and October 26, 2026 (goods and services). Project and procurement status checked against public sources on November 12, 2026. All currency is US dollars (US$)..

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

DC Water: Utility Account Brief

Format
PDF
Length
11 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Utility Account Brief
Edition
November 2026, First edition
Format
PDF
Length
11 pages
Reference
OFW_EXT_DC_WATER_UTILITY_ACCOUNT_BRIEF_d43eb0515558
Evidence current to
12 November 2026

14

Explore this report family

More Utility Account Briefs

Explore the same report family covering other utilities.

Portland Water Bureau: Utility Account Brief cover

Portland Water Bureau: Utility Account Brief

Portland Water Bureau's spending is led by Bull Run Filtration, 43% complete with $1,028.34 million spent of a $2.46 billion budget at end-September 2026, and its two construction contracts, worth $1,290,000,000 and $382,000,000, are already held by construction manager/general contractor teams. The next openings sit in smart metering, energy, leak reduction and conduit work, with City purchasing on SAP Ariba since March 2026 and formal solicitations above $250,000.
Geography
Portland and surrounding areas, Oregon, United States
Edition
November 2026, First edition
Length
10 pages
Explore report
Dŵr Cymru Welsh Water: Utility Account Brief cover

Dŵr Cymru Welsh Water: Utility Account Brief

Dŵr Cymru Welsh Water has a £6.0 billion 2025-30 expenditure allowance, but Ofwat says it has not shown it is on track: water outputs were 23% below baseline in 2025-26 and, while wastewater outputs were 59% ahead, the company underspent its wastewater price control deliverable allowances by 66% and expects less than 40% of wastewater schemes to be with the supply chain by the end of 2026-27. Much of its capital and network work runs through AMP8 frameworks already let, including a £160 million consultancy framework, while the £600 million Cwm Taf scheme is due to start procurement in early 2027.
Geography
Wales
Edition
November 2026, First edition
Length
11 pages
Explore report
EYDAP S.A.: Utility Account Brief cover

EYDAP S.A.: Utility Account Brief

EYDAP has no loan obligations and a €2.5 billion investment plan for 2026–2035, but absorbed €77.5 million in 2025, so its procurement pace is what suppliers should follow. The €94.02 million Rafina-Spata treatment plant re-tender closed for bids on 3 November 2026, and a tender for about 2.1 million smart meters is targeted for H1 2027.
Geography
Athens and Attica, Greece
Edition
November 2026, First edition
Length
10 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.