Free City Snapshot

Amsterdam

Netherlands

A delta city whose drinking water is made outside its boundaries from Rhine and polder water, expanding production ahead of demand growth while two newly separated water organisations take shape.

Browse all 3 reports

At a glance

Scale, resources and strategic position

941,927ResidentsCBS · Municipality of Amsterdam · 1 January 2026, provisional
1.108 millionInhabitants of the drinking water supply areaWaternet supply area · 31 December 2024
95 million m³Drinking water producedWaternet supply area · 2024 · 69 million m³ sold
66%Drinking water purified in the Amsterdam dunesWaternet · Amsterdam supply · current, undated
107 million m³/yearProduction capacity required by 2030Waternet supply area · projection, 2024 regional action plan
122 million m³Wastewater treatedWaterschap Amstel, Gooi en Vecht · 20-municipality area · 2025

01

City Water System

Amsterdam’s water services are divided between two public bodies that separated on 1 January 2026, after two decades of joint operation. Stichting Watermaatschappij Amsterdam, still trading as Waternet, supplies drinking water to Amsterdam and nearby communities including Amstelveen and Diemen, and manages the city’s sewers, urban surface water and groundwater under municipal mandate. The city owns the drinking water task. Waterschap Amstel, Gooi en Vecht, the regional water authority, treats wastewater and manages flood defences, water levels and water quality across 20 municipalities, large parts of which lie below sea level. National oversight rests with the Human Environment and Transport Inspectorate, advised on tariffs by the competition authority ACM.

02

Resources & Supply

Amsterdam’s drinking water comes from two source systems outside the city. In the west, Rhine water from the Lekkanaal at Nieuwegein is pumped through 302 km of bulk mains to the Amsterdamse Waterleidingduinen, filtered through dune sand and treated at Leiduin; Waternet says the dunes purify 66% of the city’s drinking water. In the east, seepage water from the Bethunepolder, topped up from the Amsterdam-Rijnkanaal, is held in the Loenderveense Plas and treated at Weesperkarspel.

Waternet’s 2024 regional action plan says regular capacity of 95 million m³ a year is enough until 2030, but that housing, economic growth and climate change will push demand higher. In August 2025 the province raised the dune abstraction ceiling.

70 → 75 million m³/yearDune abstraction ceilingProvince of North Holland permit · from 13 August 2025 · ceiling, not volume
About 126 million m³/yearProduction capacity required by 2050Waternet supply area · 2024 forecast update
141 litres/person/dayAverage water useWaternet supply area · 2021 · national average 129

03

Wastewater & Stormwater

Amsterdam’s wastewater is treated by the water authority, which treated 122 million m³ in 2025 and removes about 90% of pollution, meeting legal requirements. Its plants double as energy assets: with new wind turbines at the Amsterdam-West plant, the authority generated 117% of the energy it used in 2025. It is also adding ozone and activated-carbon treatment to remove medicine residues, aiming to cover all its plants by 2035.

Within the city, Waternet runs sewers and stormwater for the municipality under the Omgevingsprogramma Riolering 2022–2027, which projects €3–4 million a year for Rainproof stormwater measures. Rainproof, renamed Amsterdam Weerproof in 2024, now also covers heat and drought.

12Wastewater treatment installationsWaterschap Amstel, Gooi en Vecht · current · a 2024 report gives 11
117% vs 90% in 2024Energy generated against energy usedWaterschap Amstel, Gooi en Vecht · 2025
8.4 million Nm³Green gas delivered to the gridWaterschap Amstel, Gooi en Vecht · 2025

04

Investment & Resilience

Near-term investment is concentrated on drinking water capacity. Alongside the higher dune ceiling, Waternet is procuring a new slow sand filter at Weesperkarspel, with a tender estimate of €54 million excluding VAT. The city’s sewer programme projects annual investment of €55.9–77.2 million over 2022–2027, at 2021 prices. The water authority is reinforcing regional dikes so that all meet safety standards by 2030.

Climate adaptation is costed but not yet committed. A September 2025 study for the city estimated €1.04 billion of investment needed by 2050, against €1.18–3.46 billion of expected extreme-weather damage over 2018–2050 without further measures. Whether to proceed is a decision for the next city administration.

05

Key Challenges

  1. Expanding production capacity before demand outgrows the current 95 million m³ a year after 2030.
  2. Moderating demand, at 141 litres per person a day in 2021 against a national target of 100 litres by 2035.
  3. Establishing two separate water organisations after the 2026 split, while some services remain temporarily shared.
  4. Turning a costed climate-adaptation programme into funded, scheduled measures.
  5. Removing medicine residues and micropollutants at all water authority treatment plants by 2035.

Evidence

Sources and reporting periods

Drawn from Waternet, Waterschap Amstel, Gooi en Vecht and City of Amsterdam publications, provincial permits, national regulators, CBS statistics and Vewin sector data. Drinking water figures cover Waternet’s supply area; wastewater figures cover the water authority’s whole area.

Evidence through July 2026 · 97 sources read

Report library

Reports on Amsterdam

3 reports available for purchase

Amsterdam City Intelligence Profile cover

City profile

Amsterdam City Intelligence Profile

Amsterdam's drinking water comes from two source systems outside the city and is now run by an organisation that separated from the regional water authority on 1 January 2026. Waternet produced 95 million m³ in 2024 and its plans put required capacity at 107 million m³ a year by 2030, while the city's EUR 1.04 billion climate-adaptation need remains unfunded.
Edition
November 2026, First edition
Price
USD 99
Explore report →
Water Infrastructure Investment and Project Pipeline in Amsterdam cover

Water Infrastructure Investment and Project Pipeline in Amsterdam

Amsterdam's water investment is led by the regional water authority, which plans EUR 160.8 million of investment in 2026, about 2.3 times its recent annual delivery, with RWZI Amsterdam-West at the centre. Waternet is procuring a EUR 54 million slow sand filter at Weesperkarspel, adding 6 million m³ a year from 2031, while post-2030 sources and the city's EUR 1.04 billion climate-adaptation need are not yet in any adopted budget.
Edition
November 2026, First edition
Price
USD 249
Explore report →
Water Security and Supply Outlook in Amsterdam cover

Water Security and Supply Outlook in Amsterdam

Amsterdam's drinking water supply is reliable day to day but tight on capacity: Waternet's regular capacity of 95 million m³ a year must reach 107 million by 2030 and, on the 2023 forecast, 122 million by 2050 (the 2024 update adds about 4 million m³ a year after 2030). Two measures due before 2030 add 10 million m³ a year against a 14 million need, with a further 6 million expected in 2031, and the named sources after 2030 add about 30 million m³ a year against a further 15 to 19 million needed, each with permit or intake conditions.
Edition
November 2026, First edition
Price
USD 249
Explore report →

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.