Intelligence Reports/City Intelligence Report
Abu Dhabi Water Intelligence Report cover

City Intelligence Report

Abu Dhabi Water Intelligence Report

An assessment of whether Abu Dhabi's desalinated supply, networks, wastewater and regulation can keep the capital's water secure and affordable as the price control and the next round of reverse osmosis plants arrive from 2027. Abu Dhabi's drinking-water supply is secure on the regulator's 2023 data, with 98.91% of customers in the ADDC area connected and all of them on continuous supply, and reverse osmosis output up 46% in a year. The open questions are regulatory and resource-led: the RC2 price control, which set a revenue limit of AED 50 billion for 2023–2026, ends on 31 December 2026, and groundwater, about 60% of all water used in the emirate, is pumped at about 20 times natural recharge.

Geography
Abu Dhabi, United Arab Emirates
Report type
City Water Intelligence
Evidence current to
23 November 2026
Format
PDF
Length
30 pages
Edition
November 2026, New edition
Price
USD 799
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

2.15 million m³ a day: average bulk water supplied by TRANSCO to its "Abu Dhabi" supply area in 2023, against 0.74 million m³ a day to Al Ain (actual)

+46%: growth in reverse osmosis (RO) water production in 2023 over 2022, while multi-stage flash fell 19.3% (actual); EWEC projects RO at 85% of installed water capacity by 2029 (projection)

AED 50 billion vs about AED 55.1 billion: the Second Regulatory Control (RC2) revenue limit for the water, wastewater and electricity network companies, 2023–2026, as stated in DoE's release and as summed from its Final Decision Paper (calculated); RC2 ends on 31 December 2026

16 kg → under 1 kg CO2 per m³: EWEC's carbon intensity of water production, 2021 (actual) to 2031 (projection)

02

Buyer relevance

Who the report is for

Desalination developers and EPC contractors

Plan bids against EWEC's recommendation of at least 0.28 million m³ a day more RO by 2029, with Saadiyat's letter of award (February 2025) contested and Al-Nouf at adviser stage.

Wastewater and network contractors

Target TAQA Water Solutions' programme of up to AED 10 billion for about 80 projects, including the US$163 million STEP pumping station rehabilitation and the 1 million m³ emergency lagoon awarded in 2026.

Lenders and infrastructure investors

Weigh the RC2 allowed return of 4.9% and the companies' AED 21.3 billion capital forecast against the regulator's AED 16.6 billion projection ahead of the price control due from 1 January 2027.

Government and development-finance advisers

Compare DoE's targets, a 40% cut in network losses by 2035 and a 500 million m³ cut in groundwater abstraction by 2030, with the latest measured progress.

03

Decision scope

Questions answered

01

How much water does the capital use?

TRANSCO supplied an average 2.15 million m³ a day to its Abu Dhabi supply area in 2023, against 0.74 million m³ a day to Al Ain; EWEC's system peaked at 3.59 million m³ a day.

02

How far has the shift to reverse osmosis gone?

RO output rose 46% in 2023 while multi-stage flash fell 19.3%; EWEC projects RO at 85% of installed water capacity by 2029, and Taweelah RO reached full commercial operation in April 2023.

03

What do customers pay?

From 1 January 2025, UAE nationals pay AED 2.09 per 1,000 litres in the lower band and expatriates AED 7.84; recycled water costs AED 1.7 for every customer category.

04

Is the regulated revenue cap water-only?

No. RC2's AED 50 billion limit (about AED 55.1 billion when the Final Decision Paper's annual figures are summed) covers water, wastewater and electricity networks; ADDC water and ADSSC make up 23.3% of the summed total.

05

How much is recycled water reused?

72% of the 334 million m³ produced in 2023, against a goal of 100% by 2026; all 56,139 tonnes of biosolids went to landfill.

04

Inside the report

Inside the complete report

Executive Snapshot

1. Introduction and City Water Context

2. Water Demand and Consumption

3. Water Infrastructure and Supply Systems

4. Utility Performance, Finance, and Customer Services

5. Governance, Regulation, and Digital Transformation

6. Climate Resilience and Sustainability

7. Strategic Outlook and Recommendations

Source Register

05

Public preview

What to watch next

2.5 Future Demand Pressures

A DoE progress report on DSM 2030 or the Integrated Water Sector Strategy with volumes; the next EWEC capacity statement and its demand assumption; peak demand in DoE's next Annual Technical Report.

3.8 Major Projects and Capital Investments

Shuweihat 4 commercial operation; whether EWEC confirms, re-tenders or cancels Saadiyat; Mirfa–Liwa bids on 5 January 2027; RO's share of output and transmission losses in DoE's next Annual Technical Report.

4.8 Capital Investment Programmes and Financing Requirements

The RC2 successor's revenue cap, WACC and capital allowance; any 2026 or 2027 tariff schedule; TAQA's next results for water capex; reporting against the 40% network-loss target.

7.7 Signals to Monitor

The RC2 successor; Saadiyat; Mirfa–Liwa bids; the December 2026 conference announcements; DoE's next Annual Technical Report.

Sample page · page 12 of 30

Major projects and capital investments, with owner, capacity or value, stage as of 23 November 2026 and timeline, from Section 3, Water Infrastructure and Supply Systems.

Report page with a table of Abu Dhabi desalination, transmission and wastewater projects, including Taweelah RO, Mirfa 2, Shuweihat 4, Saadiyat, Al-Nouf, Mirfa–Liwa and STEP, with owners, values and stages.

06

Included

What you receive

The complete PDF report: 30 pages, 9 sections, 42 tables and a register of 50 sources.

This edition

November 2026, New edition.

07

Evidence & method

Evidence and method

The report draws on the Department of Energy's 2023 Annual Technical Report, the RC2 price-control decision and the 2025 tariff schedule, EWEC's capacity statement and plant pages, and official population and economic statistics. It adds TAQA group results, project and procurement reporting from developers and trade press, and climate and emissions statements from EWEC, EAD and the UAE's national communication, with project and policy status re-checked on 23 November 2026.

Sources

50 sources, listed in the report's source register. Evidence current to 23 November 2026. Principal data periods: 2023 sector data (Department of Energy, 2023 Annual Technical Report); 2024 population; tariffs in force from 1 January 2025; Second Regulatory Control 2023–2026; project, procurement and policy status re-checked on 23 November 2026. Currency: UAE dirham (AED); US dollars (US$) where sources report them.

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Lead Analyst, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility transformation, infrastructure, governance, finance and climate resilience for executive and policy audiences.

  • Evidence-led water intelligence
  • Decision-focused system analysis
  • Report-specific treatment of scope and terminology

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Abu Dhabi Water Intelligence Report

Format
PDF
Length
30 pages
Edition
November 2026, New edition
Price
USD 799
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
City Intelligence Report
Report type
City Water Intelligence
Edition
November 2026, New edition
Format
PDF
Length
30 pages
Reference
OFW-8936341668018_bef2a2eb05f5
Evidence current to
23 November 2026

14

Explore this report family

More City Water Intelligence reports

Explore the same report family covering other cities.

Jeddah Water Intelligence Report cover

City Intelligence Report

Jeddah Water Intelligence Report

An assessment of whether Jeddah's networks, sewers and storm drains can deliver the water that an enlarged regional desalination system now supplies, as new tariffs and capital programmes take effect from 2027. Jeddah's bulk supply has expanded at regional scale, with Shuaiba-5 producing 665,000 m³ a day against a 600,000 m³ design, but the city's own weaknesses sit downstream: leakage above 20% (2017), half of its wastewater treated (2021 study) and stormwater projects covering 46% of the city at end-2024. NWC has announced more than SAR 4.1 billion across two Jeddah packages, and from 1 January 2027 the lowest residential block's combined rate rises from SAR 0.15 to SAR 1.50 per m³.
Geography
Jeddah, Saudi Arabia
Edition
November 2026, New edition
Length
31 pages
Explore report
Muscat Water Intelligence Report cover

Muscat Water Intelligence Report

An assessment of whether Muscat's desalination plants, Barka transfers, networks, wastewater programme and the finances of Nama Water Services can keep pace with the capital's demand to 2032. Muscat's own plants total about 431,000 m³ a day, about 64% of 2025 peak demand of 677,000, and even with Ghubrah III (93% complete in November 2026) and the Wadi Dayqah dam plant local capacity would reach about 766,000 m³ a day, just below the 774,000 peak projected for 2032. The utility behind the new contracts drew RO 173.651 million of its RO 428.663 million 2024 operating revenue from government subsidy, while current liabilities exceeded current assets by RO 338 million.
Geography
Oman
Edition
November 2026, First edition
Length
31 pages
Explore report
Dubai Water Intelligence Report cover

City Water Intelligence

Dubai Water Intelligence Report

An assessment of whether Dubai's desalinated supply, storage, wastewater and drainage programmes, tariffs and governance can keep pace with a resident population heading for 5.8 million by 2040. DEWA lifted installed desalination capacity from 495 MIGD to 615 MIGD in the year to 30 September 2026, after a 2025 peak of 487 MIG left about 8 MIGD of margin, and has a contracted route to its 735 MIGD target for 2030. The larger open commitments are on the wastewater side: the AED 80 billion sewerage tunnel concessions had preferred bidders but no formal award as of 24 November 2026, while the sewerage fee rises 87% between 2025 and 2027.
Geography
Dubai, United Arab Emirates
Edition
November 2026, New edition
Length
32 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.