Intelligence Reports/City Intelligence Report
Jeddah Water Intelligence Report cover

City Intelligence Report

Jeddah Water Intelligence Report

An assessment of whether Jeddah's networks, sewers and storm drains can deliver the water that an enlarged regional desalination system now supplies, as new tariffs and capital programmes take effect from 2027. Jeddah's bulk supply has expanded at regional scale, with Shuaiba-5 producing 665,000 m³ a day against a 600,000 m³ design, but the city's own weaknesses sit downstream: leakage above 20% (2017), half of its wastewater treated (2021 study) and stormwater projects covering 46% of the city at end-2024. NWC has announced more than SAR 4.1 billion across two Jeddah packages, and from 1 January 2027 the lowest residential block's combined rate rises from SAR 0.15 to SAR 1.50 per m³.

Geography
Jeddah, Saudi Arabia
Evidence current to
28 November 2026
Format
PDF
Length
31 pages
Edition
November 2026, New edition
Price
USD 799
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

More than 20%: leakage in Jeddah's distribution system (NWC, 2017), the latest city loss figure

50%: share of Jeddah's wastewater treated (2021 King Saud University study, reported 2024), against 78% in Dammam and 60% in Riyadh

More than SAR 4.1 billion (calculated): announced cost of NWC's two Jeddah packages, 15 wastewater projects (over SAR 2.3 billion, May 2025) and 22 water projects (over SAR 1.8 billion, August 2025)

SAR 0.15 → SAR 1.50 per m³ (calculated): combined water and wastewater rate for the lowest residential block, before and after the national tariff revision effective 1 January 2027

02

Buyer relevance

Who the report is for

Sewerage, tunnelling and network contractors

Track NWC's 15 wastewater projects (over SAR 2.3 billion), the Eastern Tunnel due for handover by end-2026 and the SR 536.3 million north Jeddah sewer contracts awarded in February 2026.

Stormwater and drainage firms

Follow Jeddah Municipality's procurement: the KAFA tunnel agreement unsigned as of August 2026, Prince Fawaz bids due 15 November 2026 and Old Zahraa bids under evaluation, against a 75% coverage target for 2028.

Desalination developers and lenders

Compare bulk tariffs from SAR 1.7162/m³ (Rabigh 4) to SAR 2.45/m³ (Shuaibah IWP) and the status of Shoaiba 6 and Rabigh 5 on the corridor that serves Jeddah.

Government and regulatory advisers

Assess the 2027 tariff, the SAR 67 bill-increase cap for households using up to 30 m³ and a national cost recovery rate of 19% when planning reform support.

03

Decision scope

Questions answered

01

Where does Jeddah's water come from?

Desalinated Red Sea seawater from plants at Jeddah and Shuaibah, moved through the RJM transmission system of about 650 km; Kindasa's 50,000 m³ a day plant supplies Jeddah Industrial City directly.

02

How much of Jeddah's wastewater is treated?

50% in a 2021 King Saud University study, against 78% in Dammam and 60% in Riyadh; the 300,000 m³ a day Jeddah Airport 2 plant began commercial operation on 1 October 2023.

03

What changes for customers in 2027?

Four residential tiers replace five, with water at SAR 1, 2, 4 and 6 per m³ and wastewater at half those rates, plus a fixed monthly charge from SAR 20 for water on meters up to 20 mm.

04

How much is being invested in the city's networks?

NWC announced over SAR 2.3 billion for 15 wastewater projects in May 2025 and over SAR 1.8 billion for 22 water projects covering about 984 km in August 2025.

05

How far has flood protection progressed?

Stormwater projects covered 46% of the city at end-2024; the Jeddah Storm Water Program targets 75% by 2028 and 100% by 2033.

04

Inside the report

Inside the complete report

Executive Snapshot

1. Introduction and City Water Context

2. Water Demand and Consumption

3. Water Infrastructure and Supply Systems

4. Utility Performance, Finance, and Customer Services

5. Governance, Regulation, and Digital Transformation

6. Climate Resilience and Sustainability

7. Strategic Outlook and Recommendations

Source Register

05

Public preview

What to watch next

2.6 Future Demand Pressures

SWA's reporting of consumption under the 2027 tariff; GASTAT's 2024 and 2025 water accounts.

3.8 Major Projects and Capital Investments

Eastern Tunnel handover against the end-2026 date; SWPC's confirmation of Rabigh 4 commercial operation; Shoaiba 6 completion date; site handover for the north Jeddah sewer contracts; Rabigh 5 procurement.

4.8 Capital Investment Programmes and Financing Requirements

SWA's next cost recovery figure after the 2027 tariff; any Western Cluster concession announcement; SWPC procurement for treatment plants serving the city; NWC's progress reporting on the 22-project package.

6.8 Energy–Water and Food–Water Nexus Considerations

Award of Prince Fawaz and Old Zahraa; signature of the KAFA agreement; stormwater coverage against the 2028 target; SWA's reconciliation of its net-zero years; any NWC emissions reporting.

Sample page · page 13 of 31

Major projects and capital investments in and around Jeddah, with owner, value, stage as of 28 November 2026 and timeline, from Section 3, Water Infrastructure and Supply Systems.

Report page with a table of desalination, storage, sewerage and stormwater projects serving Jeddah, including Shoaiba 6, Rabigh 5, Al-Ju'ranah storage, NWC's packages and the KAFA tunnel, with owners, values and stages.

06

Included

What you receive

The complete PDF report: 31 pages, 9 sections, 45 tables and a register of 59 sources.

This edition

November 2026, New edition.

07

Evidence & method

Evidence and method

The report draws on Saudi Water Authority, MEWA and GASTAT publications, the 2022 census, NWC project announcements, SWPC project and portfolio pages, municipal stormwater programme reporting, the national tariff announcement of October 2026, and Saudi Arabia's UNFCCC communications, with project, procurement and tariff status re-checked on 28 November 2026.

Sources

59 sources, listed in the report's source register. Evidence current to 28 November 2026. Principal data periods: 2022 census; 2017 city water baseline (NWC data in a 2020 academic model); national sector data for 2023–2025 (GASTAT, Saudi Water Authority); the residential tariff in force until 31 December 2026 and the revision effective 1 January 2027; project, procurement and policy status re-checked on 28 November 2026. Currency: Saudi riyal (SAR); US dollar and euro values as published.

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Lead Analyst, Our Future Water Intelligence

Robert C. Brears is a globally recognised expert in water security, circular economy, and urban resilience. He is the author of multiple books on water management published by Oxford University Press, Palgrave Macmillan, and Springer Nature, and advises governments, utilities, and international organisations on strategic water investment and climate adaptation. His intelligence reports are used by utility executives, regulators, and infrastructure investors across Europe, Australasia, and the MENA region to benchmark performance and de-risk capital decisions.

  • Authoritative public & institutional sources
  • No independent modelling or forecasting
  • System-level analytical framework
  • Decision-relevant evidence & risk analysis
  • Designed for executives, policymakers & investors

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Jeddah Water Intelligence Report

Format
PDF
Length
31 pages
Edition
November 2026, New edition
Price
USD 799
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
City Intelligence Report
Edition
November 2026, New edition
Format
PDF
Length
31 pages
Reference
OFW-CIR-JEDDAH-2026_739c2dd6690f
Evidence current to
28 November 2026

14

Explore this report family

More City Water Intelligence reports

Explore the same report family covering other cities.

Muscat Water Intelligence Report cover

Muscat Water Intelligence Report

An assessment of whether Muscat's desalination plants, Barka transfers, networks, wastewater programme and the finances of Nama Water Services can keep pace with the capital's demand to 2032. Muscat's own plants total about 431,000 m³ a day, about 64% of 2025 peak demand of 677,000, and even with Ghubrah III (93% complete in November 2026) and the Wadi Dayqah dam plant local capacity would reach about 766,000 m³ a day, just below the 774,000 peak projected for 2032. The utility behind the new contracts drew RO 173.651 million of its RO 428.663 million 2024 operating revenue from government subsidy, while current liabilities exceeded current assets by RO 338 million.
Geography
Oman
Edition
November 2026, First edition
Length
31 pages
Explore report
Dubai Water Intelligence Report cover

City Water Intelligence

Dubai Water Intelligence Report

An assessment of whether Dubai's desalinated supply, storage, wastewater and drainage programmes, tariffs and governance can keep pace with a resident population heading for 5.8 million by 2040. DEWA lifted installed desalination capacity from 495 MIGD to 615 MIGD in the year to 30 September 2026, after a 2025 peak of 487 MIG left about 8 MIGD of margin, and has a contracted route to its 735 MIGD target for 2030. The larger open commitments are on the wastewater side: the AED 80 billion sewerage tunnel concessions had preferred bidders but no formal award as of 24 November 2026, while the sewerage fee rises 87% between 2025 and 2027.
Geography
Dubai, United Arab Emirates
Edition
November 2026, New edition
Length
32 pages
Explore report
Abu Dhabi Water Intelligence Report cover

City Water Intelligence

Abu Dhabi Water Intelligence Report

An assessment of whether Abu Dhabi's desalinated supply, networks, wastewater and regulation can keep the capital's water secure and affordable as the price control and the next round of reverse osmosis plants arrive from 2027. Abu Dhabi's drinking-water supply is secure on the regulator's 2023 data, with 98.91% of customers in the ADDC area connected and all of them on continuous supply, and reverse osmosis output up 46% in a year. The open questions are regulatory and resource-led: the RC2 price control, which set a revenue limit of AED 50 billion for 2023–2026, ends on 31 December 2026, and groundwater, about 60% of all water used in the emirate, is pumped at about 20 times natural recharge.
Geography
Abu Dhabi, United Arab Emirates
Edition
November 2026, New edition
Length
30 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.