01
Executive overview
Key findings
More than 20%: leakage in Jeddah's distribution system (NWC, 2017), the latest city loss figure
50%: share of Jeddah's wastewater treated (2021 King Saud University study, reported 2024), against 78% in Dammam and 60% in Riyadh
More than SAR 4.1 billion (calculated): announced cost of NWC's two Jeddah packages, 15 wastewater projects (over SAR 2.3 billion, May 2025) and 22 water projects (over SAR 1.8 billion, August 2025)
SAR 0.15 → SAR 1.50 per m³ (calculated): combined water and wastewater rate for the lowest residential block, before and after the national tariff revision effective 1 January 2027
02
Buyer relevance
Who the report is for
Sewerage, tunnelling and network contractors
Track NWC's 15 wastewater projects (over SAR 2.3 billion), the Eastern Tunnel due for handover by end-2026 and the SR 536.3 million north Jeddah sewer contracts awarded in February 2026.
Stormwater and drainage firms
Follow Jeddah Municipality's procurement: the KAFA tunnel agreement unsigned as of August 2026, Prince Fawaz bids due 15 November 2026 and Old Zahraa bids under evaluation, against a 75% coverage target for 2028.
Desalination developers and lenders
Compare bulk tariffs from SAR 1.7162/m³ (Rabigh 4) to SAR 2.45/m³ (Shuaibah IWP) and the status of Shoaiba 6 and Rabigh 5 on the corridor that serves Jeddah.
Government and regulatory advisers
Assess the 2027 tariff, the SAR 67 bill-increase cap for households using up to 30 m³ and a national cost recovery rate of 19% when planning reform support.
03
Decision scope
Questions answered
Where does Jeddah's water come from?
Desalinated Red Sea seawater from plants at Jeddah and Shuaibah, moved through the RJM transmission system of about 650 km; Kindasa's 50,000 m³ a day plant supplies Jeddah Industrial City directly.
How much of Jeddah's wastewater is treated?
50% in a 2021 King Saud University study, against 78% in Dammam and 60% in Riyadh; the 300,000 m³ a day Jeddah Airport 2 plant began commercial operation on 1 October 2023.
What changes for customers in 2027?
Four residential tiers replace five, with water at SAR 1, 2, 4 and 6 per m³ and wastewater at half those rates, plus a fixed monthly charge from SAR 20 for water on meters up to 20 mm.
How much is being invested in the city's networks?
NWC announced over SAR 2.3 billion for 15 wastewater projects in May 2025 and over SAR 1.8 billion for 22 water projects covering about 984 km in August 2025.
How far has flood protection progressed?
Stormwater projects covered 46% of the city at end-2024; the Jeddah Storm Water Program targets 75% by 2028 and 100% by 2033.
04
Inside the report
Inside the complete report
Executive Snapshot
1. Introduction and City Water Context
2. Water Demand and Consumption
3. Water Infrastructure and Supply Systems
4. Utility Performance, Finance, and Customer Services
5. Governance, Regulation, and Digital Transformation
6. Climate Resilience and Sustainability
7. Strategic Outlook and Recommendations
Source Register
05
Public preview
What to watch next
2.6 Future Demand Pressures
SWA's reporting of consumption under the 2027 tariff; GASTAT's 2024 and 2025 water accounts.
3.8 Major Projects and Capital Investments
Eastern Tunnel handover against the end-2026 date; SWPC's confirmation of Rabigh 4 commercial operation; Shoaiba 6 completion date; site handover for the north Jeddah sewer contracts; Rabigh 5 procurement.
4.8 Capital Investment Programmes and Financing Requirements
SWA's next cost recovery figure after the 2027 tariff; any Western Cluster concession announcement; SWPC procurement for treatment plants serving the city; NWC's progress reporting on the 22-project package.
6.8 Energy–Water and Food–Water Nexus Considerations
Award of Prince Fawaz and Old Zahraa; signature of the KAFA agreement; stormwater coverage against the 2028 target; SWA's reconciliation of its net-zero years; any NWC emissions reporting.
Major projects and capital investments in and around Jeddah, with owner, value, stage as of 28 November 2026 and timeline, from Section 3, Water Infrastructure and Supply Systems.

06
Included
What you receive
The complete PDF report: 31 pages, 9 sections, 45 tables and a register of 59 sources.
This edition
November 2026, New edition.
07
Evidence & method
Evidence and method
The report draws on Saudi Water Authority, MEWA and GASTAT publications, the 2022 census, NWC project announcements, SWPC project and portfolio pages, municipal stormwater programme reporting, the national tariff announcement of October 2026, and Saudi Arabia's UNFCCC communications, with project, procurement and tariff status re-checked on 28 November 2026.
Sources
59 sources, listed in the report's source register. Evidence current to 28 November 2026. Principal data periods: 2022 census; 2017 city water baseline (NWC data in a 2020 academic model); national sector data for 2023–2025 (GASTAT, Saudi Water Authority); the residential tariff in force until 31 December 2026 and the revision effective 1 January 2027; project, procurement and policy status re-checked on 28 November 2026. Currency: Saudi riyal (SAR); US dollar and euro values as published.
Evidence boundaries
This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.
08
Lead analyst
Robert C. Brears
Lead Analyst, Our Future Water Intelligence
Robert C. Brears is a globally recognised expert in water security, circular economy, and urban resilience. He is the author of multiple books on water management published by Oxford University Press, Palgrave Macmillan, and Springer Nature, and advises governments, utilities, and international organisations on strategic water investment and climate adaptation. His intelligence reports are used by utility executives, regulators, and infrastructure investors across Europe, Australasia, and the MENA region to benchmark performance and de-risk capital decisions.
- Authoritative public & institutional sources
- No independent modelling or forecasting
- System-level analytical framework
- Decision-relevant evidence & risk analysis
- Designed for executives, policymakers & investors
09
Buyer FAQs
Before you purchase
Who can use the report?
Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.
How is the report delivered?
The PDF is available to download immediately after confirmed payment, through our secure delivery system.
Can my organization buy wider access?
Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.
10
Jeddah Water Intelligence Report
- Format
- Length
- 31 pages
- Edition
- November 2026, New edition
- Price
- USD 799
11
Report details
Publication details
- Publisher
- Our Future Water Intelligence
- Report family
- City Intelligence Report
- Edition
- November 2026, New edition
- Format
- Length
- 31 pages
- Reference
- OFW-CIR-JEDDAH-2026_739c2dd6690f
- Evidence current to
- 28 November 2026
14
Explore this report family
More City Water Intelligence reports
Explore the same report family covering other cities.

Muscat Water Intelligence Report
- Geography
- Oman
- Edition
- November 2026, First edition
- Length
- 31 pages

City Water Intelligence
Dubai Water Intelligence Report
- Geography
- Dubai, United Arab Emirates
- Edition
- November 2026, New edition
- Length
- 32 pages

City Water Intelligence
Abu Dhabi Water Intelligence Report
- Geography
- Abu Dhabi, United Arab Emirates
- Edition
- November 2026, New edition
- Length
- 30 pages