Intelligence Reports/Utility Account Brief
Portland Water Bureau: Utility Account Brief cover

Utility Account Brief

Portland Water Bureau: Utility Account Brief

Portland Water Bureau's spending is led by Bull Run Filtration, 43% complete with $1,028.34 million spent of a $2.46 billion budget at end-September 2026, and its two construction contracts, worth $1,290,000,000 and $382,000,000, are already held by construction manager/general contractor teams. The next openings sit in smart metering, energy, leak reduction and conduit work, with City purchasing on SAP Ariba since March 2026 and formal solicitations above $250,000.

Geography
Portland and surrounding areas, Oregon, United States
Evidence current to
12 November 2026
Format
PDF
Length
10 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

$2.46 billion: Bull Run Filtration budget, 43% complete with $1,028.34 million spent at end-September 2026

$1.98 billion: five-year capital plan for FY 2024-25 to FY 2028-29 in the FY 2024-25 Financial Plan (inflated dollars); a FY 2026-27 five-year plan has since been adopted

About $284.4 million: projected FY 2026-27 water sales revenue ($274.6 million retail, $9.8 million wholesale)

About 114,000 meters: being replaced since March 2026; digital reading from mid-2027

02

Buyer relevance

Who the report is for

Construction subcontractors and equipment suppliers

Identify the two filtration contractor teams, MWH-Kiewit JV and Bull Run Conveyance Partners, and the 25% COBID goal on the pipelines.

Metering and utility software vendors

See which smart meter contracts are already placed, including VertexOne's portal at up to $1.7 million, against up to $76 million authorized.

Energy and leak detection firms

Weigh the FY 2025–2029 solar and micro-hydro plans and water loss of 13.70% in FY 2023-24 as entry points.

Business development teams new to Portland

Learn the SAP Ariba registration steps and how Council procurement reports signal large awards.

03

Decision scope

Questions answered

01

Who holds the Bull Run Filtration construction contracts?

MWH-Kiewit JV holds the facility contract, with a total of $1,290,000,000, and Bull Run Conveyance Partners holds the pipelines contract, with a total of $382,000,000.

02

How does the City of Portland advertise contracts?

Through SAP Ariba, live since March 2026; goods and services above $250,000 go through formal, publicly advertised solicitations.

03

How much filtration budget is left to spend?

About $1,431.7 million of the $2.46 billion filtration budget was unspent at end-September 2026.

04

Where does the smart meter program stand?

About 114,000 meters are being replaced since March 2026, digital reading installation starts in early 2027 and activation in mid-2027.

04

Inside the report

Inside the complete report

1. The Account at a Glance

2. Organisation and Decision-Making

3. Financial Position

4. Priorities and Pressures

5. How Portland Water Bureau Buys

6. Opportunity Register

7. Commercial Priorities: Where to Focus First

8. Watch List: What to Monitor and What to Do

Source Register

05

Public preview

What to watch next

Filtration progress and spend

43% complete with $1,028.34 million spent at end-September 2026; the monthly status page tracks both.

Smart meter solicitations

Digital reading install starts early 2027; other solicitations were "ongoing" in December 2024.

FY 2026-27 five-year capital plan total

Adopted in June 2026; the FY 2024-25 plan was $1.98 billion.

FY 2027-28 rates and the rate study

Rates rose 8.1% in FY 2026-27; wholesale customers are leaving.

Sample page · page 7 of 10

Opportunity Register: Portland Water Bureau programs by status, stage, existing contractors, supplier categories and route in.

Landscape report page with the opportunity register table listing filtration, smart meter, energy, water loss, conduit and river crossing programs with status labels and access routes.

06

Included

What you receive

The complete PDF report: 10 pages, 9 sections, 6 tables and a register of 21 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

The brief draws on City Council procurement reports and ordinances, the City's supplier handbook, the Bureau's project status, cost and smart meter pages, the City's audited annual financial reports and financial plan, and 2026 bond market and news reporting.

Sources

21 sources, listed in the report's source register. Evidence current to 12 November 2026. Principal data periods: FY 2024-25 City financial report; FY 2026-27 adopted rates and revenue projection; Bull Run Filtration status to end-September 2026. Project, contract and procurement status checked against public sources on November 12, 2026. All currency is US dollars..

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Portland Water Bureau: Utility Account Brief

Format
PDF
Length
10 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Utility Account Brief
Edition
November 2026, First edition
Format
PDF
Length
10 pages
Reference
OFW_EXT_PORTLAND_WATER_BUREAU_UTILITY_ACCOUNT_BRIEF_33f9d6d15bd5
Evidence current to
12 November 2026

14

Explore this report family

More Utility Account Briefs

Explore the same report family covering other utilities.

Dŵr Cymru Welsh Water: Utility Account Brief cover

Dŵr Cymru Welsh Water: Utility Account Brief

Dŵr Cymru Welsh Water has a £6.0 billion 2025-30 expenditure allowance, but Ofwat says it has not shown it is on track: water outputs were 23% below baseline in 2025-26 and, while wastewater outputs were 59% ahead, the company underspent its wastewater price control deliverable allowances by 66% and expects less than 40% of wastewater schemes to be with the supply chain by the end of 2026-27. Much of its capital and network work runs through AMP8 frameworks already let, including a £160 million consultancy framework, while the £600 million Cwm Taf scheme is due to start procurement in early 2027.
Geography
Wales
Edition
November 2026, First edition
Length
11 pages
Explore report
EYDAP S.A.: Utility Account Brief cover

EYDAP S.A.: Utility Account Brief

EYDAP has no loan obligations and a €2.5 billion investment plan for 2026–2035, but absorbed €77.5 million in 2025, so its procurement pace is what suppliers should follow. The €94.02 million Rafina-Spata treatment plant re-tender closed for bids on 3 November 2026, and a tender for about 2.1 million smart meters is targeted for H1 2027.
Geography
Athens and Attica, Greece
Edition
November 2026, First edition
Length
10 pages
Explore report
DC Water: Utility Account Brief cover

DC Water: Utility Account Brief

DC Water's FY 2027 capital budget of US$1,072.3 million is 38.0% above the revised FY 2026 budget, inside a US$9.69 billion ten-year plan, and its October 2, 2026 forecast lists 13 planned capital solicitations. The largest new work is a US$120M–US$130M progressive design-build for M Street transmission mains, alongside lead line packages of US$35M–US$40M each and a CMAR master agreement for Potomac Interceptor rehabilitation.
Geography
Washington, District of Columbia, United States; wholesale wastewater for Maryland and Virginia counties
Edition
November 2026, First edition
Length
11 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.