01
Executive overview
Key findings
145.937 billion m³ vs 11.677 billion m³: inflow from neighbouring areas against local water resources (2024)
9 million m³/d: capacity of the 23 waterworks of 50,000 m³/d or more (2024), against a target of 10 million m³/d
RMB 2.55/m³: central-area first-block residential tariff from 1 June 2025, up from RMB 1.98/m³, unchanged since 2012
6.8%: public-supply network leakage rate reported for 2025
02
Buyer relevance
Who the report is for
Water technology and equipment suppliers entering China's Greater Bay Area
Identify which operator and which district buys for each service area before approaching the Beibu Waterworks expansion or wastewater programmes.
Infrastructure investors and lenders
Compare the 2025 tariff design, the reported 2020–2022 losses and fixed-asset investment levels when screening water and drainage opportunities in Guangzhou.
Consultants and engineering firms
Use the capacity tables and project stages to time bids against the 10 million m³/d waterworks target and the 2035 sewage plan.
Analysts covering Chinese city utilities
Use the side-by-side water use bases to compare Guangzhou's consumption with its 4.952 billion m³ ceiling on a consistent basis.
03
Decision scope
Questions answered
How dependent is Guangzhou on water from outside the city?
Inflow from neighbouring areas was about 12.5 times local water resources in 2024, and surface water supplied 90.1% of total supply.
How much did central-area water prices change in 2025?
The first-block residential rate rose 28.8%, from RMB 1.98 to RMB 2.55 per m³, on 1 June 2025, the first change since 2012.
Who runs water in Guangzhou?
Guangzhou Water Investment Group, owned by the municipal SASAC, holds close to 70% of the city's combined supply and drainage capacity; its subsidiary Guangzhou Water Supply Co., Ltd. serves 11.43 million people in the central area.
Which major supply projects are operating?
The RMB 2.3 billion North River diversion achieved full-line delivery on 31 July 2024, and Nansha has received water from the Pearl River Delta Water Resources Allocation Project since 1 June 2024.
Is waterworks capacity keeping pace with demand?
Capacity was 9 million m³/d across the larger works in 2024, against a 10 million m³/d target and a projected 12.4 million m³/d peak-day demand in 2035.
04
Inside the report
Inside the complete report
Executive Snapshot
1. City Water Profile
2. Water Resources and Supply
3. Institutions and Utilities
4. Infrastructure and Major Projects
5. Tariffs and Finance
6. Climate and Resilience
7. Outlook and What to Watch
Source Register
05
Public preview
What to watch next
2. Water Resources and Supply
The 2025 Guangzhou Water Resources Bulletin; residential use per person after the 2025 tariff reform.
4. Infrastructure and Major Projects
Beibu Waterworks commissioning; Huadu Waterworks leaving trial operation; approval of the Eastern Water Source Project.
5. Tariffs and Finance
The Huadu tariff decision; the first cost supervision cycle under the 2025 instrument; any bond or rating disclosure by Guangzhou Water Investment Group.
7. Outlook and What to Watch
Final approval of the Water Sector 15th Five-Year Plan and its numeric 2030 targets; any REIT or bond issue by the water group; use reported against the 4.952 billion m³ ceiling.
Section 4: waterworks and wastewater capacity against plan targets, and the major supply projects with owner, value, stage and timeline.

06
Included
What you receive
The complete PDF report: 12 pages, 9 sections, 13 tables and a register of 26 sources.
This edition
October 2026, New edition. Covers the central-area tariff reform in force from 1 June 2025 and district schedules effective to 20 September 2026. Includes the municipal 15th Five-Year Plan Outline issued on 29 May 2026 and the Water Sector 15th Five-Year Plan consultation draft of 10 August 2026. Reports the North River diversion and Pearl River Delta transfer as operating, with data from the 2024 Water Resources Bulletin and the January–June 2026 supply disclosure. Time-sensitive facts were re-checked on 26 October 2026. New edition, October 2026, with evidence current to 26 October 2026. Replaces the earlier edition for new buyers; buyers of an earlier edition keep access to the edition they bought.
07
Evidence & method
Evidence and method
Guangzhou's 2024 Water Resources Bulletin, the 2025 Statistical Communiqué and the Water Authority's 2026 supply disclosure; the municipal 15th Five-Year Plan Outline, the territorial spatial plan and the water supply and sewage master plans; and central-area and district tariff instruments, with hearing coverage.
Sources
26 sources, listed in the report's source register. Evidence current to 26 October 2026. Principal data periods: Guangzhou Water Resources Bulletin 2024 (calendar 2024); 2025 Statistical Communiqué; January–June 2026 urban supply disclosure; tariffs in force at October 2026. All currency is Chinese yuan (RMB) unless stated..
Evidence boundaries
This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.
08
Lead analyst
Robert C. Brears
Founder, Our Future Water Intelligence
Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.
- Decision-focused utility intelligence
- Published water-policy author
- Evidence-grounded system analysis
09
Buyer FAQs
Before you purchase
Who can use the report?
Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.
How is the report delivered?
The PDF is available to download immediately after confirmed payment, through our secure delivery system.
Can my organization buy wider access?
Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.
10
Guangzhou City Intelligence Profile
- Format
- Length
- 12 pages
- Edition
- October 2026, New edition
- Price
- USD 99
11
Report details
Publication details
- Publisher
- Our Future Water Intelligence
- Report family
- City Intelligence Profile
- Report type
- Urban Water Research and Reference
- Edition
- October 2026, New edition
- Format
- Length
- 12 pages
- Reference
- ofw-profile-city-cn-guangzhou_c16e9751ff6c
- Evidence current to
- 26 October 2026
14
Explore this report family
More City Intelligence Profiles
Explore the same report family covering other cities.

Muscat City Intelligence Profile
- Geography
- Oman
- Edition
- November 2026, New edition
- Length
- 13 pages

Jeddah City Intelligence Profile
- Geography
- Saudi Arabia
- Edition
- November 2026, First edition
- Length
- 13 pages

Doha City Intelligence Profile
- Geography
- Qatar
- Edition
- November 2026, First edition
- Length
- 13 pages
