Intelligence Reports/City Intelligence Profile
Jeddah City Intelligence Profile cover

City Intelligence Profile

Jeddah City Intelligence Profile

A reference profile of the water system in Jeddah: its sources and supply, the institutions that run it, major projects, tariffs and finance, climate risk and what to watch next. Jeddah's bulk supply has grown at regional scale, with Shuaiba-5 raised to 665,000 m³/day and Shuaibah 3 Conversion operating since May 2025; these plants serve the wider Makkah Region. The city's own weak points are local: leakage above 20% (2017) and stormwater projects covering 46% of the city at end-2024. The capital now moving is local too: NWC packages of over SAR 2.3 billion (wastewater) and over SAR 1.8 billion (water), and municipal drainage contracts.

Geography
Saudi Arabia
Evidence current to
13 November 2026
Format
PDF
Length
13 pages
Edition
November 2026, First edition
Price
USD 99
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

665,000 m³/day: Shuaiba-5 desalination output, raised from a 600,000 m³/day design (SWA, February 2026); it serves the Makkah Region

Over SAR 2.3 billion and over SAR 1.8 billion: announced costs of two separate NWC Jeddah packages, 15 wastewater projects (May 2025) and 22 water projects (August 2025)

46%: share of the city covered by completed or in-progress stormwater projects at end-2024; the target is 100% by 2033

SAR 1 to SAR 6 per m³: the four residential water tiers announced for 1 January 2027, plus wastewater at half those rates

02

Buyer relevance

Who the report is for

Contractors and equipment suppliers entering Saudi water

Identify which body procures what in Jeddah, from SWPC desalination plants to NWC sewer contracts and municipal drainage tenders.

Investors and lenders assessing Saudi utility exposure

Read the 2027 tariff schedule against national cost recovery of 19% and the government's continued funding of capital costs.

Consultants preparing a Jeddah market entry or bid

Use the project tables, with owner, value, stage and timeline, to time approaches to NWC and Jeddah Municipality.

Development and climate analysts

Compare Jeddah's flood exposure, including 179 mm in a single day in November 2022, with the drainage programme's 2028 and 2033 coverage targets.

03

Decision scope

Questions answered

01

Where does Jeddah's water come from?

Desalinated Red Sea seawater, delivered through the Rabigh–Jeddah–Makkah transmission system of about 650 km; plants such as Shuaiba-5 (665,000 m³/day) serve the wider Makkah Region.

02

Who runs water in Jeddah?

NWC distributes water and collects wastewater through its Western Cluster, under a 7-year management contract with a SUEZ-led consortium worth EUR 98 million; SWA regulates and Jeddah Municipality handles stormwater.

03

What will Jeddah households pay from 2027?

Four residential tiers of SAR 1 to SAR 6 per m³ for water, wastewater at half those rates, and a fixed monthly charge from SAR 20 + 10 for meters up to 20 mm.

04

How much capital is NWC putting into Jeddah?

Two separate packages with announced costs of over SAR 2.3 billion (15 wastewater projects, May 2025) and over SAR 1.8 billion (22 water projects, August 2025).

05

How well protected is Jeddah against floods?

Stormwater projects completed or in progress covered 46% of the city at end-2024, against targets of 75% by 2028 and 100% by 2033.

04

Inside the report

Inside the complete report

Executive Snapshot

1. City Water Profile

2. Water Resources and Supply

3. Institutions and Utilities

4. Infrastructure and Major Projects

5. Tariffs and Finance

6. Climate and Resilience

7. Outlook and What to Watch

Source Register

05

Public preview

What to watch next

5. Tariffs and Finance

The cost-recovery and demand effect of the 2027 rates in SWA's next reporting.

4. Infrastructure and Major Projects

Eastern Tunnel handover against the end-2026 date; the Prince Fawaz and Old Zahraa awards; signature of the KAFA agreement; site handover for the north Jeddah sewer contracts.

2. Water Resources and Supply

SWPC's portfolio entry for Rabigh 4; a published completion date for Shoaiba 6; procurement of Rabigh 5.

3. Institutions and Utilities

Any announcement on the Western Cluster concession; SWA regulatory decisions affecting NWC.

Sample page · page 7 of 13

Major projects: NWC network and sewerage contracts and the Jeddah stormwater programme, with owner, value, stage and timeline.

Report page showing two tables of Jeddah water, wastewater and stormwater projects with columns for owner, value, stage at 13 November 2026 and timeline.

06

Included

What you receive

The complete PDF report: 13 pages, 9 sections, 11 tables and a register of 34 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

The report draws on Saudi Water Authority, Saudi Water Partnership Company and Saudi Press Agency publications, the 2022 census via the UN Statistics Division, Saudi Arabia's Fourth National Communication to the UNFCCC, and trade and press reporting from MEED, Argaam, Ajel and Al-Eqtisadiah on projects and tariffs, with statuses re-checked on 13 November 2026.

Sources

34 sources, listed in the report's source register. Evidence current to 13 November 2026. Principal data periods: 2022 census; project and procurement status as of 13 November 2026; national sector data for 2023–2025; the residential tariff in force until 31 December 2026 and the revision announced for 1 January 2027. Currency is Saudi riyals (SAR) unless stated; US dollar and euro values are given as published..

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Jeddah City Intelligence Profile

Format
PDF
Length
13 pages
Edition
November 2026, First edition
Price
USD 99
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
City Intelligence Profile
Edition
November 2026, First edition
Format
PDF
Length
13 pages
Reference
OFW_EXT_JEDDAH_CITY_INTELLIGENCE_PROFILE_f0bc307ef489
Evidence current to
13 November 2026

14

Explore this report family

More City Intelligence Profiles

Explore the same report family covering other cities.

Muscat City Intelligence Profile cover

Muscat City Intelligence Profile

A reference profile answering who runs Muscat's water, where it comes from, what it costs and which projects will change the capital's supply, wastewater and flood protection from 2027. Muscat's own plants do not cover its demand: the governorate's two contracted desalination plants hold 391,000 m³ a day and two operating NWS plants about 40,000, against 2025 Muscat Zone demand of 606 thousand m³ a day on average and 677 thousand at peak, with the balance carried from the Barka Zone. Ghubrah III, a 300,000 m³ a day plant 93% built in November 2026, is expected to operate from Q2 2027, while water produced for Muscat fell from 233.3 million m³ in 2024 to 202.2 million m³ in 2025.
Geography
Oman
Edition
November 2026, First edition
Length
13 pages
Explore report
Doha City Intelligence Profile cover

Doha City Intelligence Profile

A reference profile of the water system in Doha: its sources and supply, the institutions that run it, major projects, tariffs and finance, climate risk and what to watch next. Doha has no separate water system: its water comes through KAHRAMAA's single national network from desalination plants with 538 MIGD of capacity in 2024, against national demand of 420 MIGD. Capacity is expected to reach 648 MIGD after the Facility E plant is commissioned in 2028, while Ashghal's sewer, treated-effluent and flood-drainage works make up seven of the eleven projects listed.
Geography
Qatar
Edition
November 2026, First edition
Length
13 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.