01
Executive overview
Why this report matters
London’s water system connects a large urban population with river catchments, reservoirs, treatment works and utility networks extending beyond the city. This Profile explains how those relationships shape water supply, wastewater management, demand, regulation and investment. It places the responsibilities of Thames Water and the other water suppliers alongside the roles of London’s planning authorities and national regulators.
Demand reduction, leakage performance and the conditions for financing investment are central to the report’s account. It explains Tideway’s early operation alongside the longer resource-development timetable, distinguishing Teddington’s design capacity from its planned yield and the reservoir’s shared regional contribution. The analysis connects these developments with demographic pressures, customer charges and resource recovery, retaining the specific scope and status of operating results, targets and proposals.
Environment Agency reported storage for the specified reservoir group; not a combined total for all Thames Water resources.
02
Buyer relevance
Who the report is for
- Researchers and university students
- Academics and journalists
- Consultants and analysts
- Professionals beginning city water research
Understand the service system
Connect London’s water suppliers, sewerage network and planning institutions with the wider catchments and regional resource arrangements on which the city’s services depend.
Interpret investment and performance
Interpret actual spending, the disputed regulatory allowance and a dated financing proposal alongside completed renewal and planned resources, with their purposes and delivery conditions clearly explained.
Follow documented developments
Use specific project milestones, drought-management arrangements and customer programs to understand how existing operations relate to the capital’s longer-term water-resource and infrastructure development.
03
Decision scope
Questions answered
How does London’s water system fit together?
The Profile explains the links between river catchments, reservoirs, treatment works and distribution, alongside the companies supplying different parts of London. It connects these physical relationships with sewerage responsibilities, planning authorities and the regional water-resource program.
What has been delivered, and what remains planned?
Completed renewal and Tideway’s early operation are presented alongside proposed resource schemes and their planned yields and timing. The report also explains the disputed spending allowance and dated, unaccepted financing proposal, keeping investment plans distinct from secured funding and delivered assets.
How do current pressures affect the existing system?
The analysis connects the 2026 drought response and reservoir position with demand management, business metering and leakage detection. It also explains wastewater recovery, tariff changes and institutional responsibilities without converting company-wide measures into London-only outcomes.
04
Inside the report
Inside the complete report
Executive Overview
City and Water-System Context
Water Resources and Supply
Demand and Service
Drinking-Water Infrastructure
Wastewater and Treatment
Stormwater and Urban Drainage
Utilities, Governance and Regulation
Investment and Major Projects
Tariffs and Customer Context
Energy, Circularity and Sustainability
Climate and Water Resilience
Forward Developments
City Intelligence Summary
05
Public preview
Core themes
An interconnected regional supply
London’s resources and networks cross administrative boundaries. River and storage conditions, multiple water suppliers and regional planning connect city services with decisions and assets across a wider geography.
Different infrastructure delivery stages
Tideway’s operating account, completed water-main renewal and proposed recycling and storage schemes describe distinct developments. Their purposes and stages explain how wastewater progress coexists with a longer supply-development timetable.
Demand and delivery conditions
Demand reduction is central to the resource program. Improved detection coexists with a missed leakage target, while financing and consent remain separate conditions for delivering proposed infrastructure.
Tideway and the next water resources
London’s investment picture contains two different delivery timetables. Tideway is entering operating assessment, while proposed water-resource schemes still face planning decisions. Their relationship explains why wastewater progress and immediate supply pressure can occur at the same time.
Tideway’s reported 2025 overflow reduction was substantially modeled and came during an unusually dry year. It indicates the effect of interception under those conditions, while a broader range of rainfall will provide a fuller operating picture.
Teddington would connect recycled water from Mogden with drought-related river abstraction. Its design capacity describes a proposed facility, and the expected consent application is a planning milestone rather than evidence of water reaching customers.
Demand reduction is central to the resource program, while better detection coexists with a missed leakage target. The disputed allowance and dated financing proposal add delivery conditions to the physical timetable, alongside consent and construction.
The distinction helps readers follow operating performance, demand objectives, financing and consent as separate parts of London’s delivery picture.
06
Included
What you receive
The research and reference report is supplied as a PDF for personal, academic and internal professional use.
A defined city-system portrait
Read a connected account of London’s population, water-service geography, principal suppliers and institutions, explaining how catchments and utility networks link the capital to a wider regional system.
Infrastructure and operating context
Understand named waterworks, distribution renewal, wastewater conveyance, treatment and resource recovery, with reported operating measures and company-wide accounts kept within their specific periods, services and geographic boundaries.
A documented development picture
Follow completed projects, proposed strategic resources and regulatory developments through their stated purposes and stages, alongside the drought response and demand-management work affecting the existing system.
07
Lead analyst
Robert C. Brears
Founder, Our Future Water Intelligence
Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.
- Decision-focused utility intelligence
- Published water-policy author
- Evidence-grounded system analysis
08
Buyer FAQs
Before you purchase
What is the report format and price?
The complete report is supplied as a PDF, priced at USD 99.
How can I purchase and access the report?
Use Buy PDF to pay securely through Stripe. Your purchased PDF is delivered privately in this browser; it is not a public download.
What does the London Profile cover?
It covers water resources, service geography, drinking-water and wastewater infrastructure, drainage, governance, investment, customer context, energy recovery, climate resilience and documented forward developments.
How does it differ from a specialist report?
This is an Urban Water Research and Reference Profile explaining the city’s system and developments. It does not provide engineering prescriptions, investment recommendations, peer rankings or newly modeled scenarios.
How may I use the report?
The PDF is for personal, academic and internal professional use by the purchaser. Redistribution, resale and public posting are prohibited.
09
London: City Intelligence Profile
- Format
- Length
- 19 pages
- Edition
- 2026
- Price
- USD 99
10
Report details
Publication details
- Publisher
- Our Future Water Intelligence
- Report family
- City Intelligence Profile
- Report type
- Urban Water Research and Reference
- Edition
- 2026
- Format
- Length
- 19 pages
- Reference
- ofw-profile-city-gb-london
