Intelligence Reports/Water Utility Intelligence Report
Water Systems Overview: Acea cover

Water Utility Intelligence Report

Water Systems Overview: Acea

An assessment of how Rome's water system fits together, from the Peschiera–Marcio springs through Acea Ato 2's networks to the regulators and concession that decide its tariffs and investment. Rome's water system depends on one spring system for most of its supply and loses about four in ten cubic meters in its network: in 2018 Acea Ato 2 abstracted 700.0 Mm³, of which 597.8 Mm³ entered the ATO 2 network. Service quality improved on most ARERA measures between 2019 and 2023, but samples exceeding wastewater discharge limits rose to 9.60%, and the €1.449 billion Peschiera doubling is before the courts after its first award was annulled.

Geography
Rome and ATO 2 Lazio Centrale, Italy
Evidence current to
24 November 2026
Format
PDF
Length
10 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

3,942,215 residents in 105 municipalities: population served by Acea Ato 2 in ATO 2 Lazio Centrale (ARERA, MTI-4 approval, 2024–2029)

700.0 Mm³: water abstracted by Acea Ato 2 in 2018 (DM 99/97 basis)

40.2% / 42.1% / 42.07%: Acea Ato 2 water losses in 2023, as published by Acea (2023 sustainability report, ARERA 917/17 basis), by Acea Ato 2 (2024 sustainability report) and by ARERA (M1b)

80% / 70%: share of Rome's population (Acea, 2025) and of Romans' homes (Il Sole 24 Ore, 2025) supplied by the Peschiera–Marcio system

02

Buyer relevance

Who the report is for

Water resource and network consultants

Use the 2014–2023 abstraction, billing and loss series, with each definition kept separate, to frame loss-reduction work in ATO 2.

Investors and analysts covering Acea

See how ARERA, the Conference of Mayors and a concession ending in 2032 sit behind tariff multipliers rising to 1.324 in 2029.

Wastewater and treatment suppliers

Track the rise in samples exceeding discharge limits to 9.60% in 2023 and 12.00% of sludge sent to landfill.

Public bodies and other Italian operators

Compare Acea Ato 2's ARERA indicators for 2019, 2021 and 2023 with their own.

03

Decision scope

Questions answered

01

How much water does Acea Ato 2 lose?

Published 2023 figures are 40.2% (Acea), 42.1% (Acea Ato 2) and 42.07% (ARERA M1b); in 2018 it abstracted 700.0 Mm³, of which 597.8 Mm³ entered the ATO 2 network.

02

Where does Rome's water come from?

Mostly from the Peschiera–Marcio spring system: 80% of Rome's population according to Acea, and 70% of Romans' homes according to Il Sole 24 Ore (2025).

03

Who sets Acea Ato 2's tariffs?

ARERA sets the method and approves tariffs after the Conference of Mayors of ATO 2; the MTI-4 maximum multipliers run from 1.081 in 2024 to 1.324 in 2029.

04

Which service indicators are improving?

Interruptions fell from 11.53 to 5.20 hours a year and non-conforming drinking water samples from 9.06% to 3.01% between 2019 and 2023.

05

What is the main investment ahead?

The €1.449 billion Peschiera doubling, whose first award was annulled (reported 19 November 2026), alongside a €450 million EIB package for 2027–2030.

04

Inside the report

Inside the complete report

Executive Overview

1. Water Resource Profile

2. Governance and Institutional Framework

3. Infrastructure and Service Delivery

Strategic Outlook and Opportunities

Source Register

05

Public preview

What to watch next

1. Water Resource Profile

ARERA's indicators for 2024 and 2025, against its target of a 5% reduction in M1a in each year; whether Acea publishes 2024–2025 Acea Ato 2 loss figures on the 917/17 basis.

2. Governance and Institutional Framework

The Conference of Mayors' and ARERA's approval of the 2026–2027 update; any extension decision; the Publiacqua appeal.

3. Infrastructure and Service Delivery

Annual kilometers rehabilitated; ARERA's next M6 value; completion of the PNRR Peschiera-system works.

Strategic Outlook and Opportunities

The outcome of the Peschiera award dispute; the new business plan's water envelope; the 2026–2027 tariff update; drawdown of the remaining EIB tranches; any concession extension decision.

Sample page · page 4 of 10

Section 1: published loss figures for Acea Ato 2, the Rome network, the group and the combined operators, set side by side.

Report page showing ARERA linear loss values and a table of other published loss figures for 2023 to 2025, followed by the water resource assessment.

06

Included

What you receive

The complete PDF report: 10 pages, 6 sections, 11 tables and a register of 22 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

The report draws on Acea and Acea Ato 2 sustainability reports from 2016 to 2025, ARERA tariff and quality determinations, Acea's consolidated, half-year and nine-month results, and Acea, EIB and press reports on the Peschiera tender and concession.

Sources

22 sources, listed in the report's source register. Evidence current to 24 November 2026. Principal data periods: Acea Ato 2 operating data for 2014–2023 (sustainability reports); ARERA determinations for indicator years 2019, 2021 and 2023; FY 2025 consolidated results and the half-year report to 30 June 2026. Project and regulatory status checked on 24 November 2026. All currency is euros (€).

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Systems Overview: Acea

Format
PDF
Length
10 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Water Utility Intelligence Report
Edition
November 2026, First edition
Format
PDF
Length
10 pages
Reference
OFW_EXT_WATER_SYSTEMS_OVERVIEW_ACEA_9b2d651f7ac2
Evidence current to
24 November 2026

14

Explore this report family

More Water Systems Overview reports

Explore the same report family covering other utilities.

Water Systems Overview: Watercare Services cover

Water Systems Overview: Watercare Services

An assessment of whether Auckland's dam and Waikato River supply, Watercare's treatment plants and networks, and its new regulatory settlement can carry a NZ$15.2 billion investment program. Watercare reported results within its Charter standards in FY2026, with real water loss of 11.26% and 7.4 unplanned interruptions per 1,000 connections, but its dams fell to uncomfortably low levels in March 2025 and the replacement of the 1928 Huia plant now runs to 2038. Capital delivered fell to NZ$959.5 million, NZ$90.5 million below target, as borrowings reached NZ$4,699.8 million ahead of the first price-quality path from 1 July 2028.
Geography
Auckland (Tāmaki Makaurau), New Zealand
Edition
November 2026, First edition
Length
12 pages
Explore report
Water Systems Overview: Johannesburg Water cover

Water Systems Overview: Johannesburg Water

An overview of how Johannesburg's water system works as a whole, from bulk supply under Rand Water's licence through the utility's network and six wastewater works to the plans that must close its supply gap. Johannesburg used 1,801 Ml/d in June 2024 against the 1,550 Ml/d its plan requires under Rand Water's licence, while non-revenue water was 44.79% in FY2024/25 and total water losses of 207,136 Ml equal about 567 Ml/d. Downstream, the six wastewater works averaged 49% in the 2023/24 Green Drop audit, and new bulk water from Lesotho is expected about 2028.
Geography
City of Johannesburg, Gauteng, South Africa
Edition
November 2026, First edition
Length
11 pages
Explore report
Water Systems Overview: Thames Water cover

Water Systems Overview: Thames Water

An assessment of whether Thames Water's water resources, institutions and infrastructure can keep London and the Thames Valley supplied and served while its ownership and financing are decided. London ran a 17 Ml/d deficit to target headroom in FY 2025/26, after London leakage ran about 53 Ml/d above forecast and 43.3 Ml/d of deployable output was written down, and reservoir storage stood at 56% against a 77% seasonal average on November 3, 2026. The new supply schemes are years away, so supply security rests on leakage and demand, while statutory net debt of £18,515.5 million and an unapproved recapitalization proposal leave the company's future undecided.
Geography
London and the Thames Valley, England
Edition
November 2026 edition
Length
15 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.