01
Executive overview
Key findings
17 Ml/d deficit: London's position against target headroom in FY 2025/26, after London leakage ran about 53 Ml/d above forecast (total demand 74 Ml/d above forecast) and 43.3 Ml/d of deployable output was written down (actual)
56% against 77%: London reservoir storage on November 3, 2026, against the average for the time of year, with a hosepipe ban in force since July 23, 2026 (actual)
573.7 Ml/d: annual average leakage in FY 2025/26, up on the prior year; the three-year reduction from the 2019/20 baseline was 15.1% against a 21.3% target (actual vs target)
£18,515.5 million: statutory net debt at March 31, 2026, against a Regulatory Capital Value of £22,725 million (actual)
02
Buyer relevance
Who the report is for
Water resources planners and regional bodies
Use the 43.3 Ml/d deployable output write-down and the separate Lower Thames study (about 180 Ml/d in the 2022 drought) to test assumptions ahead of the draft WRMP29.
Contractors and consultants working on AMP8
Place the £4 billion Major Projects Framework, the £5.7 billion White Horse tender and the 14 critical schemes against the court dates that decide the company's financing.
Credit and infrastructure investors
Read the Part 26A timetable, the £5.4 billion facility ceiling and Moody's and S&P ratings alongside operating and service results.
Regulators, policy advisers and local authorities
See how Ofwat, the Environment Agency, the Drinking Water Inspectorate, the Planning Inspectorate and the proposed single regulator divide oversight of one distressed system.
03
Decision scope
Questions answered
Is London's water supply in deficit?
Yes: London ran a 17 Ml/d deficit to target headroom in FY 2025/26, driven by London leakage about 53 Ml/d above forecast and a 43.3 Ml/d write-down of deployable output.
How severe is the 2026 drought for London?
London reservoir storage was 56% on November 3, 2026, against a 77% average for the time of year, and a hosepipe ban has applied since July 23, 2026.
Which service commitments did Thames Water miss in FY 2025/26?
Drinking water compliance (CRI 4.32), supply interruptions, pollution incidents (35.42 per 10,000 km of sewer) and discharge permit compliance (88.22%) all missed their commitment levels.
When will the new reservoir supply water?
White Horse Reservoir, submitted for consent on November 19, 2026, is envisaged to operate around 2040 if consented, providing up to 271 Ml/d in drought.
What financing decisions are pending?
A court sanction hearing on January 13, 2027 on pushing 2027 maturities to March 2028, and a decision on the London & Valley Water proposal of £3.35 billion of new equity.
04
Inside the report
Inside the complete report
Executive Overview
1. Water Resource Profile
2. Governance and Institutional Framework
3. Infrastructure and Service Delivery
Strategic Outlook and Opportunities
Source Register
05
Public preview
What to watch next
2. Governance and Institutional Framework
The Part 26A convening hearing (November 27, 2026) and sanction hearing (January 13, 2027); any Board or Ofwat decision on the London & Valley Water proposal; government action on special administration; legislation for the single regulator; the outcome of Ofwat's case on late environmental schemes.
Strategic Outlook and Opportunities
Sanction of the Part 26A plans (January 13, 2027); a decision on the London & Valley Water proposal; the White Horse acceptance decision (December 17, 2026) and the main works award; the Teddington application (March 2027); FY 2026/27 delivery against the 14 critical schemes; leakage against the 22% AMP8 target.
1. Water Resource Profile
Leakage and per capita consumption in FY 2026/27; the return to service of the Gateway plant and the groundwater sources; how the Lower Thames study and the 2026 drought are carried into the draft WRMP29; when the Temporary Use Ban is lifted.
3. Infrastructure and Service Delivery
Discharge permit compliance and pollution incidents in FY 2026/27; the Compliance Risk Index; the Environment Agency's next Environmental Performance Assessment; mains replacement against the 200–250 km a year ambition.
Financing and ownership: the creditor facilities, court timetable, recapitalization proposal and credit ratings on one page.

06
Included
What you receive
The complete PDF report: 15 pages, 6 sections, 19 tables and a register of 41 sources.
This edition
November 2026 edition.
07
Evidence & method
Evidence and method
Thames Water's FY 2025/26 annual report, Annual Performance Report, sustainability report, investor reports and WRMP Annual Review 2025-26; Ofwat, Environment Agency, Drinking Water Inspectorate, Competition and Markets Authority and Planning Inspectorate documents; and company announcements, rating actions and trade press on financing and projects to November 21, 2026.
Sources
41 sources, listed in the report's source register. Evidence current to 21 November 2026. Principal data periods: FY 2025/26 (year ended March 31, 2026), the first year of the 2025–2030 price control (AMP8); 2026 drought; financing, regulatory and project status to November 21, 2026. All currency is pounds sterling (£).
Evidence boundaries
This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.
08
Lead analyst
Robert C. Brears
Founder, Our Future Water Intelligence
Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.
- Decision-focused utility intelligence
- Published water-policy author
- Evidence-grounded system analysis
09
Buyer FAQs
Before you purchase
Who can use the report?
Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.
How is the report delivered?
The PDF is available to download immediately after confirmed payment, through our secure delivery system.
Can my organization buy wider access?
Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.
10
Water Systems Overview: Thames Water
- Format
- Length
- 15 pages
- Edition
- November 2026 edition
- Price
- USD 499
11
Report details
Publication details
- Publisher
- Our Future Water Intelligence
- Report family
- Water Utility Intelligence Report
- Edition
- November 2026 edition
- Format
- Length
- 15 pages
- Reference
- OFW_EXT_WATER_SYSTEMS_OVERVIEW_THAMES_WATER_3de7b86a0684
- Evidence current to
- 21 November 2026
14
Explore this report family
More Water Systems Overview reports
Explore the same report family covering other utilities.

Water Systems Overview: Denver Water
- Geography
- Denver and surrounding suburbs, Colorado, United States
- Edition
- November 2026, First edition
- Length
- 14 pages

Water Systems Overview: Austin Water
- Geography
- Austin and surrounding areas, Texas, United States
- Edition
- November 2026, First edition
- Length
- 14 pages

Water Systems Overview: San Diego County Water Authority
- Geography
- San Diego County, California, United States
- Edition
- November 2026, First edition
- Length
- 15 pages