Intelligence Reports/Water Utility Intelligence Report
Water Systems Overview: Thames Water cover

Water Utility Intelligence Report

Water Systems Overview: Thames Water

An assessment of whether Thames Water's water resources, institutions and infrastructure can keep London and the Thames Valley supplied and served while its ownership and financing are decided. London ran a 17 Ml/d deficit to target headroom in FY 2025/26, after London leakage ran about 53 Ml/d above forecast and 43.3 Ml/d of deployable output was written down, and reservoir storage stood at 56% against a 77% seasonal average on November 3, 2026. The new supply schemes are years away, so supply security rests on leakage and demand, while statutory net debt of £18,515.5 million and an unapproved recapitalization proposal leave the company's future undecided.

Geography
London and the Thames Valley, England
Evidence current to
21 November 2026
Format
PDF
Length
15 pages
Edition
November 2026 edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

17 Ml/d deficit: London's position against target headroom in FY 2025/26, after London leakage ran about 53 Ml/d above forecast (total demand 74 Ml/d above forecast) and 43.3 Ml/d of deployable output was written down (actual)

56% against 77%: London reservoir storage on November 3, 2026, against the average for the time of year, with a hosepipe ban in force since July 23, 2026 (actual)

573.7 Ml/d: annual average leakage in FY 2025/26, up on the prior year; the three-year reduction from the 2019/20 baseline was 15.1% against a 21.3% target (actual vs target)

£18,515.5 million: statutory net debt at March 31, 2026, against a Regulatory Capital Value of £22,725 million (actual)

02

Buyer relevance

Who the report is for

Water resources planners and regional bodies

Use the 43.3 Ml/d deployable output write-down and the separate Lower Thames study (about 180 Ml/d in the 2022 drought) to test assumptions ahead of the draft WRMP29.

Contractors and consultants working on AMP8

Place the £4 billion Major Projects Framework, the £5.7 billion White Horse tender and the 14 critical schemes against the court dates that decide the company's financing.

Credit and infrastructure investors

Read the Part 26A timetable, the £5.4 billion facility ceiling and Moody's and S&P ratings alongside operating and service results.

Regulators, policy advisers and local authorities

See how Ofwat, the Environment Agency, the Drinking Water Inspectorate, the Planning Inspectorate and the proposed single regulator divide oversight of one distressed system.

03

Decision scope

Questions answered

01

Is London's water supply in deficit?

Yes: London ran a 17 Ml/d deficit to target headroom in FY 2025/26, driven by London leakage about 53 Ml/d above forecast and a 43.3 Ml/d write-down of deployable output.

02

How severe is the 2026 drought for London?

London reservoir storage was 56% on November 3, 2026, against a 77% average for the time of year, and a hosepipe ban has applied since July 23, 2026.

03

Which service commitments did Thames Water miss in FY 2025/26?

Drinking water compliance (CRI 4.32), supply interruptions, pollution incidents (35.42 per 10,000 km of sewer) and discharge permit compliance (88.22%) all missed their commitment levels.

04

When will the new reservoir supply water?

White Horse Reservoir, submitted for consent on November 19, 2026, is envisaged to operate around 2040 if consented, providing up to 271 Ml/d in drought.

05

What financing decisions are pending?

A court sanction hearing on January 13, 2027 on pushing 2027 maturities to March 2028, and a decision on the London & Valley Water proposal of £3.35 billion of new equity.

04

Inside the report

Inside the complete report

Executive Overview

1. Water Resource Profile

2. Governance and Institutional Framework

3. Infrastructure and Service Delivery

Strategic Outlook and Opportunities

Source Register

05

Public preview

What to watch next

2. Governance and Institutional Framework

The Part 26A convening hearing (November 27, 2026) and sanction hearing (January 13, 2027); any Board or Ofwat decision on the London & Valley Water proposal; government action on special administration; legislation for the single regulator; the outcome of Ofwat's case on late environmental schemes.

Strategic Outlook and Opportunities

Sanction of the Part 26A plans (January 13, 2027); a decision on the London & Valley Water proposal; the White Horse acceptance decision (December 17, 2026) and the main works award; the Teddington application (March 2027); FY 2026/27 delivery against the 14 critical schemes; leakage against the 22% AMP8 target.

1. Water Resource Profile

Leakage and per capita consumption in FY 2026/27; the return to service of the Gateway plant and the groundwater sources; how the Lower Thames study and the 2026 drought are carried into the draft WRMP29; when the Temporary Use Ban is lifted.

3. Infrastructure and Service Delivery

Discharge permit compliance and pollution incidents in FY 2026/27; the Compliance Risk Index; the Environment Agency's next Environmental Performance Assessment; mains replacement against the 200–250 km a year ambition.

Sample page · page 6 of 15

Financing and ownership: the creditor facilities, court timetable, recapitalization proposal and credit ratings on one page.

Report page with tables listing Thames Water's court-sanctioned funding plan, super senior facility, maturity extension timetable, London & Valley Water proposal and Moody's and S&P ratings.

06

Included

What you receive

The complete PDF report: 15 pages, 6 sections, 19 tables and a register of 41 sources.

This edition

November 2026 edition.

07

Evidence & method

Evidence and method

Thames Water's FY 2025/26 annual report, Annual Performance Report, sustainability report, investor reports and WRMP Annual Review 2025-26; Ofwat, Environment Agency, Drinking Water Inspectorate, Competition and Markets Authority and Planning Inspectorate documents; and company announcements, rating actions and trade press on financing and projects to November 21, 2026.

Sources

41 sources, listed in the report's source register. Evidence current to 21 November 2026. Principal data periods: FY 2025/26 (year ended March 31, 2026), the first year of the 2025–2030 price control (AMP8); 2026 drought; financing, regulatory and project status to November 21, 2026. All currency is pounds sterling (£).

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Systems Overview: Thames Water

Format
PDF
Length
15 pages
Edition
November 2026 edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Water Utility Intelligence Report
Edition
November 2026 edition
Format
PDF
Length
15 pages
Reference
OFW_EXT_WATER_SYSTEMS_OVERVIEW_THAMES_WATER_3de7b86a0684
Evidence current to
21 November 2026

14

Explore this report family

More Water Systems Overview reports

Explore the same report family covering other utilities.

Water Systems Overview: Denver Water cover

Water Systems Overview: Denver Water

An assessment of whether Denver Water's two-basin snowmelt supply, near-static storage, Board-led governance and treatment and pipe assets can hold up through drought years and the 2030s. Denver Water's constraint is supply, not plants: treated water consumption averaged 183.8 MGD in FY 2025 against 600 MGD of listed treatment capacity, while storage capacity grew 0.3% in a decade. In 2026 runoff fell to 22% of normal, and the Gross Reservoir Expansion, adding 77,000 acre-feet, is now due for completion in 2028.
Geography
Denver and surrounding suburbs, Colorado, United States
Edition
November 2026, First edition
Length
14 pages
Explore report
Water Systems Overview: Austin Water cover

Water Systems Overview: Austin Water

An assessment of whether Austin Water's single river supply, its institutions and its treatment, network and wastewater assets can keep pace with a growing city through the 2040s. Austin Water's average diversions of about 164,409 acre-feet a year use about half of its 325,000 acre-feet firm supply, so the strain lies in wastewater capacity, water loss and slow new supplies. Its US$3.2 billion five-year capital plan is led by the US$1.5 billion Walnut Creek expansion, while an estimated 7.1 billion gallons of water was lost in 2023.
Geography
Austin and surrounding areas, Texas, United States
Edition
November 2026, First edition
Length
14 pages
Explore report
Water Systems Overview: San Diego County Water Authority cover

Water Systems Overview: San Diego County Water Authority

An assessment of whether San Diego County Water Authority's supplies, institutions and regional conveyance system still fit a region where the Authority's own supplies fell 40.3% between FY 2016 and FY 2025. The Water Authority's own supplies fell 40.3% between FY 2016 and FY 2025, to 291,721 acre-feet, while conserved Colorado River water rose to 68.7% of them and the melded supply rate rose 75.0% to US$1,855 per treated acre-foot. Its 2025 plan projects a normal-year surplus of 16,333 acre-feet a year in 2030, which the Authority began selling in 2026 as S&P cut its senior lien rating to AA.
Geography
San Diego County, California, United States
Edition
November 2026, First edition
Length
15 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.