Intelligence Reports/Water Utility Intelligence Report
Water Systems Overview: Johannesburg Water cover

Water Utility Intelligence Report

Water Systems Overview: Johannesburg Water

An overview of how Johannesburg's water system works as a whole, from bulk supply under Rand Water's licence through the utility's network and six wastewater works to the plans that must close its supply gap. Johannesburg used 1,801 Ml/d in June 2024 against the 1,550 Ml/d its plan requires under Rand Water's licence, while non-revenue water was 44.79% in FY2024/25 and total water losses of 207,136 Ml equal about 567 Ml/d. Downstream, the six wastewater works averaged 49% in the 2023/24 Green Drop audit, and new bulk water from Lesotho is expected about 2028.

Geography
City of Johannesburg, Gauteng, South Africa
Evidence current to
23 November 2026
Format
PDF
Length
11 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

1,801 → 1,550 Ml/d: City consumption in June 2024, 41% of the water abstracted from the Integrated Vaal River System, and the level required under Rand Water's licence (actual; target)

44.79%: non-revenue water in FY2024/25, worth R3.837 billion; physical losses 23.72% (actual)

49%: average Green Drop score for the utility's six wastewater works in the 2023/24 audit, down from 73% in 2021 (actual)

R13.06 billion: five-year capital budget for 2026/27–2030/31 (budgeted)

02

Buyer relevance

Who the report is for

Water resource and bulk supply planners

Compare City consumption of 1,801 Ml/d with Rand Water's 4,936 Ml/d licence, the 1,550 Ml/d requirement and Lesotho Phase II, 56.7% complete in September 2026.

Wastewater treatment contractors and operators

Size the gap between 993 Ml/d treated and 1,043 Ml/d of capacity, the Northern Works upgrade to 460 Ml/d and a bulk wastewater budget rising to R1.7 billion.

Lenders and public-finance advisers

Read how ring-fencing from July 1, 2026, the City's Ba3 rating and up to R10 billion of conditional reform grants divide accountability between the City and the utility.

Network and leakage specialists

Set NRW of 44.79% and 4,336 bursts a month in H1 2025/26 against Circular 88 targets of 29.54% by 2029/30.

03

Decision scope

Questions answered

01

Where does Johannesburg's water come from?

All potable water is bought from Rand Water, which abstracts from the Integrated Vaal River System under a 4,936 Ml/d licence effective until 2028; the City used 41% of that system's abstraction in June 2024.

02

How much water does the network lose?

Non-revenue water was 44.79% (R3.837 billion) in FY2024/25 and 48.7% in H1 2025/26; physical losses were 23.72%.

03

How are the wastewater works performing?

The six works averaged 49% in the 2023/24 Green Drop audit, down from 73% in 2021, and final effluent compliance was 70.9% in FY2024/25 against a 79% target.

04

Who is accountable for the system?

Johannesburg Water has carried single-point accountability for water and sanitation since July 1, 2026; the City remains shareholder, lender and tariff-setter, and DWS has started criminal proceedings against the City over two works.

04

Inside the report

Inside the complete report

Executive Overview

1. Water Resource Profile

2. Governance and Institutional Framework

3. Infrastructure and Service Delivery

Strategic Outlook and Opportunities

Source Register

05

Public preview

What to watch next

1. Water Resource Profile

Measured demand under Level 2 restrictions; the licence that follows Rand Water's current limit in 2028; Polihali impoundment from July 2027; FY2025/26 NRW against the 44.58% target in Business Plan 2025/26.

2. Governance and Institutional Framework

The first ring-fenced annual results; conditions on the reform grant; the DWS proceedings and the next Green Drop audit; any AfriForum review of the levy.

3. Infrastructure and Service Delivery

Whether Level 2 restrictions restore reservoir levels; a corrected reservoir count in the FY2025/26 report; burst restoration times; effluent compliance in December 2026.

Strategic Outlook and Opportunities

The FY2025/26 capital outturn against the R1.704 billion budget; IFC status; signature of the pipe-replacement financing; award of the NRW contract and Craigavon Phase 2; Polihali impoundment in July 2027.

Sample page · page 7 of 11

Section 3: Johannesburg Water's service indicators for FY2024/25 and the first half of 2025/26 against their targets.

Report page with a table of bursts, restoration times, blockages, water quality, effluent compliance and spillages for Johannesburg Water, followed by the section assessment.

06

Included

What you receive

The complete PDF report: 11 pages, 6 sections, 7 tables and a register of 24 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

Johannesburg Water's integrated annual reports to FY2024/25, its business plans to 2026/27 and its 2025/26 mid-year report and monthly water quality report. Governance, project, legal and supply status comes from City of Johannesburg statements, parliamentary replies, the IFC disclosure and press reports checked on November 23, 2026.

Sources

24 sources, listed in the report's source register. Evidence current to 23 November 2026. Principal data periods: FY2024/25 Integrated Annual Report (year ended June 30, 2025); mid-year report for H1 FY2025/26 (to December 31, 2025); Business Plan 2026/27; project, tariff, legal and supply status checked on November 23, 2026. Currency is South African rand (R); "R…k" is rand thousand, as printed by the utility.

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Systems Overview: Johannesburg Water

Format
PDF
Length
11 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Water Utility Intelligence Report
Edition
November 2026, First edition
Format
PDF
Length
11 pages
Reference
OFW_EXT_WATER_SYSTEMS_OVERVIEW_JOHANNESBURG_WATER_7f4d8627b035
Evidence current to
23 November 2026

14

Explore this report family

More Water Systems Overview reports

Explore the same report family covering other utilities.

Water Systems Overview: Watercare Services cover

Water Systems Overview: Watercare Services

An assessment of whether Auckland's dam and Waikato River supply, Watercare's treatment plants and networks, and its new regulatory settlement can carry a NZ$15.2 billion investment program. Watercare reported results within its Charter standards in FY2026, with real water loss of 11.26% and 7.4 unplanned interruptions per 1,000 connections, but its dams fell to uncomfortably low levels in March 2025 and the replacement of the 1928 Huia plant now runs to 2038. Capital delivered fell to NZ$959.5 million, NZ$90.5 million below target, as borrowings reached NZ$4,699.8 million ahead of the first price-quality path from 1 July 2028.
Geography
Auckland (Tāmaki Makaurau), New Zealand
Edition
November 2026, First edition
Length
12 pages
Explore report
Water Systems Overview: Acea cover

Water Systems Overview: Acea

An assessment of how Rome's water system fits together, from the Peschiera–Marcio springs through Acea Ato 2's networks to the regulators and concession that decide its tariffs and investment. Rome's water system depends on one spring system for most of its supply and loses about four in ten cubic meters in its network: in 2018 Acea Ato 2 abstracted 700.0 Mm³, of which 597.8 Mm³ entered the ATO 2 network. Service quality improved on most ARERA measures between 2019 and 2023, but samples exceeding wastewater discharge limits rose to 9.60%, and the €1.449 billion Peschiera doubling is before the courts after its first award was annulled.
Geography
Rome and ATO 2 Lazio Centrale, Italy
Edition
November 2026, First edition
Length
10 pages
Explore report
Water Systems Overview: Thames Water cover

Water Systems Overview: Thames Water

An assessment of whether Thames Water's water resources, institutions and infrastructure can keep London and the Thames Valley supplied and served while its ownership and financing are decided. London ran a 17 Ml/d deficit to target headroom in FY 2025/26, after London leakage ran about 53 Ml/d above forecast and 43.3 Ml/d of deployable output was written down, and reservoir storage stood at 56% against a 77% seasonal average on November 3, 2026. The new supply schemes are years away, so supply security rests on leakage and demand, while statutory net debt of £18,515.5 million and an unapproved recapitalization proposal leave the company's future undecided.
Geography
London and the Thames Valley, England
Edition
November 2026 edition
Length
15 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.