Intelligence Reports/Water Utility Intelligence Report
Water Systems Overview: Department of Energy, Abu Dhabi Emirate cover

Water Utility Intelligence Report

Water Systems Overview: Department of Energy, Abu Dhabi Emirate

An overview of the water system served by the Department of Energy, Abu Dhabi Emirate: its water resources, governance and institutions, infrastructure and service delivery, and its strategic outlook. Abu Dhabi's municipal water system is reliable and closely regulated, while its groundwater is pumped at around 20 times natural recharge. Reverse osmosis rose from 6% of desalinated water generation in 2014 to 45% in 2025, and EWEC forecasts system peak demand rising from 3.41 to 4.03 million m3 a day between 2025 and 2033. The Second Regulatory Control for the network companies ends in December 2026.

Geography
Department of Energy, Abu Dhabi Emirate
Evidence current to
26 October 2026
Format
PDF
Length
14 pages
Edition
October 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

45%: share of 2025 water generation from reverse osmosis, up from 10% in 2016 (actual)

About 2,100 million m3 a year: groundwater pumping in the emirate, around 20 times natural recharge (Environment Agency – Abu Dhabi, February 2021)

AED 16,202 million: capital expenditure allowance for the four regulated network companies over 2023–2026 (regulatory allowance, not spending)

3.41 → 4.03 million m3/day: forecast emirate water system peak plus auxiliaries, 2025 to 2033 (projection)

02

Buyer relevance

Who the report is for

Desalination developers and reverse osmosis suppliers

Compare EWEC's capacity recommendations to 2031 with the status of Shuweihat 4, EWEC's planned Future RO plant of up to 273,000 m3 a day and the Saadiyat Island project.

Network contractors and asset managers

Use the transmission, distribution and sewer series from 2018 to 2023, including 2.34% transmission losses and 92.85% pressure compliance in Al Ain, to locate network needs.

Infrastructure investors and lenders

Read the RC1 and RC2 cost of capital, capital allowances and regulatory asset values ahead of the third price control from January 2027.

Water resource and policy advisers

Set groundwater pumping of about 2,100 million m3 a year against desalinated output and recycled water reuse of 72% in 2023.

03

Decision scope

Questions answered

01

How dependent is Abu Dhabi on groundwater?

The Environment Agency – Abu Dhabi reported in February 2021 that groundwater makes up around 60% of water used and is pumped at about 2,100 million m3 a year, around 20 times natural recharge; only 3% of reserves are fresh.

02

How fast is the shift to reverse osmosis?

Reverse osmosis produced 45% of water generation at EWEC-contracted plants in 2025 (549 million m3), up from 10% in 2016 and 6% in 2014.

03

What did the current price control allow for capital spending?

The RC2 final decision set capital expenditure allowances of AED 16,202 million over 2023–2026 for the four network companies, 23% below their adjusted forecasts, with a 4.9% WACC.

04

How reliable is water transmission?

In 2023 only 0.0078% of water transmitted to the distribution companies went unsupplied because of transmission interruptions, within a 0.05% KPI, but transmission losses rose to 2.34% against a 2% threshold.

05

How much is demand expected to grow?

EWEC's 2025 statistics forecast the emirate water system peak plus auxiliaries rising from 3.41 million m3 a day in 2025 to 4.03 million m3 a day in 2033.

04

Inside the report

Inside the complete report

Executive Overview: The System at a Glance

1. Water Resource Profile

2. Governance and Institutional Framework

3. Infrastructure and Service Delivery

Strategic Outlook and Opportunities

Source Register

05

Public preview

What to watch next

2. Governance and Institutional Framework

Publication of the RC3 consultation and decision (from January 2027), especially the capital allowance and cost of capital; how RC3 treats the merged TAQA Distribution business; any allocation policy based on the Integrated Water Model.

Strategic Outlook and Opportunities

EWEC's next Statement of Future Capacity Requirements and any revision of the 2033 peak forecast; Shuweihat 4 commercial operation; whether the Saadiyat Island project proceeds; the RC3 decision.

3. Infrastructure and Service Delivery

Transmission losses against the 2% threshold in the next technical report; Al Ain pressure compliance; whether the Saur contract is followed by other wastewater operation and maintenance packages.

1. Water Resource Profile

Updated groundwater figures with dates from the Environment Agency – Abu Dhabi; reverse osmosis share in EWEC's 2026 statistics; recycled water reuse in the Department of Energy's next technical report.

Sample page · page 6 of 14

Price control elements for RC1 and RC2 and projected RC2 maximum allowed revenue by company.

Report page showing two tables: cost of capital, operating and capital allowances and asset values for RC1 and RC2, and RC2 maximum allowed revenue for TRANSCO, ADDC and AADC.

06

Included

What you receive

The complete PDF report: 14 pages, 6 sections, 20 tables and a register of 22 sources.

This edition

October 2026, First edition.

07

Evidence & method

Evidence and method

The report draws on the Department of Energy's technical reports for 2018 to 2023, its RC1, recycled water and RC2 price control papers, EWEC statistical reports and capacity statements, Statistics Centre – Abu Dhabi water statistics and the Environment Agency – Abu Dhabi groundwater assessment. Project and institutional status was checked against EWEC, ENGIE, MEED and government sources on October 26, 2026.

Sources

22 sources, listed in the report's source register. Evidence current to 26 October 2026. Principal data periods: Department of Energy technical reports for calendar 2018–2023 (2023 is the latest edition); EWEC Statistical Report 2025 (calendar 2025, forecasts to 2033); Second Regulatory Control price control, 2023–2026. Project and institutional status checked on October 26, 2026. All currency is UAE dirhams (AED)..

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Systems Overview: Department of Energy, Abu Dhabi Emirate

Format
PDF
Length
14 pages
Edition
October 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Water Utility Intelligence Report
Edition
October 2026, First edition
Format
PDF
Length
14 pages
Reference
OFW_WATER_SYSTEMS_OVERVIEW_DEPARTMENT_OF_ENERGY_ABU_DHABI_EMIRATE_72603f404eb4
Evidence current to
26 October 2026

14

Explore this report family

More Water Systems Overview reports

Explore the same report family covering other utilities.

Water Systems Overview: EYATH S.A. cover

Water Systems Overview: EYATH S.A.

An overview of whether Thessaloniki's water system, from its river, springs and boreholes to its plants, networks and governing institutions, can absorb the expansion that EYATH takes on by July 2027. Thessaloniki's main source reaches the city through one treatment plant that averaged 93.2% of its first-phase capacity in 2025, while its second phase has slipped to 2027. The system is run by a debt-free, state-controlled company whose tariffs are now fixed to 2029 under a €221.6 million approved investment plan, and which must take over two regional units by July 31, 2027.
Geography
Thessaloniki, Greece
Edition
November 2026 edition
Length
12 pages
Explore report
Water Systems Overview: Seattle Public Utilities cover

Water Systems Overview: Seattle Public Utilities

An assessment of whether Seattle Public Utilities' watersheds, treatment, network, institutions and finances can carry a larger capital program of seismic, storage, dam and overflow obligations through the 2030s. Seattle Public Utilities has supply to spare: water produced in 2025 averaged 126.7 MGD against a 172 MGD firm yield, and leakage fell to 4.5%. The pressure is capital: the Mayor's proposed 2027–2032 water program is about US$1,067 million, rates rise 4.3% a year from 2027, and the 2026 Official Statement expects US$553.2 million of new parity bonds over 2027–2031.
Geography
Seattle, Washington, United States
Edition
November 2026, First edition
Length
13 pages
Explore report
Water Systems Overview: De Watergroep cover

Water Systems Overview: De Watergroep

An assessment of whether De Watergroep's sources, network, institutions and finances can deliver a climate-robust drinking water system across four Flemish provinces through 2030 and the planned 2032 asset merger with Farys. De Watergroep's water meets standard in about 99.8% of analyses, but its Infrastructure Leakage Index has fallen by only 0.08 since 2022, to 1.15 in 2025, against a target of 0.80 by end-2030. Net purchases over sales equal about 28% of the 174,012,068 m³ it made available in 2025, while key sources such as Kluizen and De Gavers are still being rebuilt.
Geography
West Flanders, East Flanders, Flemish Brabant and Limburg, Flanders, Belgium
Edition
November 2026, First edition
Length
12 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.